Geotechnical Report: Sohawal-Barabanki Bridges
Geotechnical Report: Sohawal-Barabanki Bridges
SUBMITTED TO
CONTRACTORS
TECHPRO ENGINEERSPVT.LTD.
(An ISO: 9001-2008 certified Company and NABL accredited Laboratory)
103, RATANDHAM, 12/483, McROBERTS GANJ,
KANPUR-208 001
PHONES: 0512-2525759, 09793209918
e-mail: [email protected]
CONTENTS
1. INTRODUCTION: ............................................................................................................ 1
2. SCOPE OF WORK:......................................................................................................... 2
APPENDICES
_________________________________________________________________________________________________
CHART 11 to 12: FIELD BORE LOG CHART (BR.433A BH-A1).............................................................73-74
_________________________________________________________________________________________________
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section-3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
_________________________________________________________________________________________________
Branch Office: 131, Patparganj Industrial Area, Delhi-110 092, Ph.: 011-43519098
TECHPROENGINEERSPVT.LTD. (AN ISO 9001: 2008 Certified Company)
103 Ratan Dham, 12/483 McRoberts Ganj,Kanpur-208001
Tel.: 0512-2525759, 09793209918
e-mail: [email protected]
Web site: www.techproindia.com
ACKNOWLEDGEMENTS
We feel pleasure to submit the report of Sub soil investigation conducted at site for
We convey hereby our sincere thanks to Mr. Ravi Menghani, Managing Director,
M/s. Lall Construction Company, AA-105, Shalimar Bagh, Delhi, for his trust shown to us
We are also grateful to Mr. Adarsh Kumar Srivastava, site Engineer, Lall
Construction Company, for their co-operation rendered during and prior to the
investigation work.
We are also thankful to our staff members for conducting field and laboratory test,
(Arvind K. Garg)
B.Tech (Civil), M.Tech.
Principal Consultant &
Managing Director
_________________________________________________________________________________________________
Branch Office: 131, Patparganj Industrial Area, Delhi-110 092, Ph.: 011-43519098
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
1. INTRODUCTION:
Part-3-section-3 of report for Geo-technical
361,373A, 375, 433A & 440 under Sowahal - Barabanki section of Northern
Investigation has been awarded to us via work order No. Nil on dated
investigation in field, laboratory testing of bulk samples collected from the site
be carried out, with the locations has been planned by the client in
determine the nature and properties of soil strata in the bore holes and
representing them through log sections showing the levels, nature and
properties of various strata upto a sufficient depth below the level suitable for
with safe allowable bearing capacity for safe and strong foundation.
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 1 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
2. SCOPE OF WORK:
For the proposed major bridges, it is required to
and permissible settlement of sub-soil strata as per IS: 6403-1981, IS: 1904-1978
2.1 Boring two numbers of boreholes of 150 mm diameter at each major bridge
2.2 Conducting the Standard Penetration Test (SPT) at every 1.50 metre interval
2.3 Collecting disturbed soil samples at every 1.50 metre interval or at change of
2.4 Collecting undisturbed soil samples from the boreholes at 2.50 metre interval
or change of strata.
2.5 Transporting all the disturbed and undisturbed soil samples collected during
2.6 Conducting the laboratory test on all the soil samples collected during field
2.7 Compilation of field and laboratory test results, working out the safe
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 2 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
absence of mountains; the most elevated point is about four hundred and thirty
feet above the sea; and there are few points of view from which any expanse of
country can be surveyed. The verdure and beauty of the groves with which it is
studded in every direction redeem the prospect from bare ugliness, and when the
spring crops are green and the hills yet full of water, the richness of the landscape
is very striking. Here and there patches of uncultivated waste are to be seen, but a
high assessment and security of tenure are rapidly converting them into waving
fields of corn. Towards the north, especially along the old bank of the Ghaghra,
the ground is undulating and richly wooded, while to the south there is a gentle
slope down to the Gomti. The monotonous level is broken on the north by an
abrupt fall, the ridge running parallel to the Ghaghra at a distance of from one mile
(1.6 km) to three miles (5 km), is said to indicate what was formerly the right bank
3.2 Climate:
The district lies in the plains of the state, and hence its climate
conditions are quite similar to the average climate condition of the plain. Hot to
very hot in summer, cold to quite cold during winters and humid to very humid and
sultry during rainy season. Most of the rain occurs from June to September and
often in November to January. The winter sets in November and continues till
February end. The maximum temperature recorded in 1997-98 was 45 ̊̊C and
minimum was 2.5 ̊C. The average rainfall recorded for 1997-98 was 1056mm.
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 3 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
3.3 Geology:
geological as the plain itself. The soil structure of the district is composed of
alluvial soil, the soil brought in by the rivers. The upper belt is called ‘Upahar’
and the soil texture is yellowish clay. The basin land of the rivers is mostly
sandy soil, and the land adjacent to the rivers is sandy loam. The only mineral
of any note found in the district is sand, which is available in sufficient quantity
on river banks, and is used in construction work. The district is also noted for its
3.4 Seismicity:
Barabanki falls under earthquake hazard Zone III as per earthquake map of
India. This is high damage risk zone. The liquefaction susceptibility, which may
physical properties of the near surface materials and their saturation with ground
4. OBSERVATIONS AT SITE:
4.1. Effect of saltpetre and termite has not been observed at the site.
4.3. Drain and river are present in site over which proposed river is going to be
constructed.
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 4 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
5. FIELD INVESTIGATION:
The field investigation work at this site was carried
out from March 6th; 2019 to March 14th; 2019. The following investigation work
5.1. Ten numbers of boreholes of diameter 150 mm were made within the
proposed layout of each major bridge. The boreholes were progressed using
power operated winch under percussion method. Casing was used to keep
the borehole stable. The records of achieved depth of bore holes and their
GPS coordinates have been given in Para No. 7 “Ground Water Table” and
PLAN” in Appendix A.
5.2. Standard Penetration Tests were conducted at 1.50 metre as per the
procedure in IS 2131-1981 in all the bore holes. For conducting the test, the
bottom of the borehole was properly cleaned and split spoon sampler was
properly seated in position in the borehole. The split spoon sampler resting
on the bottom of borehole was allowed to sink under its own weight; then the
sampler was allowed to penetrate 15 cm with the blows of the hammer 63.50
kg weight falling free through 75cm, thereafter the split spoon sampler was
further driven by another 15 cm. For the 3rd and final drive, the sampler was
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 5 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
The total blows of penetration for the second and third 15 cm of penetration
cohesive soils.
In case the blows count of SPT in soil (including the number of blows of
seating) exceeds 100, the corresponding penetration was recorded and this
particular test at that depth stopped. If the total penetration is more than the
SPT ‘N’ values are correlated with relative of non-cohesive stratum as per
BS: 5930 (1999) - for sandy strata and with consistency of cohesive stratum.
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 6 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
In this method, the sampler acts as a probe and the driving energy is
supplied by the fall of the drop weight. The values of ‘N’ depend on the
as refusal.
‘N’ value depends upon degree of saturation and over burden pressure of the
formation. Silty fine sand and fine sand below the water table develop pore
water pressure depending on the in-situ void ratio which in turn affects the
effective stress. This change in effective stress influences the ‘N’ value
considerably.
Terzaghi and peck have recommended a correction for ‘N’ values in case of
saturated silty and fine sand when the ‘N’ observed in the field is higher than
15.
Soil sample obtained from standard spoon sampler for all above standard
penetration tests were collected in the polythene bags of suitable size. These
samples were property seal, labelled, record and carefully transported to the
5.3. Disturbed soil samples were tried to be collected at every 1.50 metre
interval and at significant change of stratum. Soil from cutting edge of SPT
samplers and retained in split spoon sampler, used for Standard Penetration
Tests was taken as disturbed samples. These samples were placed without
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 7 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
soil samples could not be collected from SPT samples, Shelby tubes were
driven and retained soil samples were obtained. The laboratory tests were
5.4. Undisturbed soil samples were tried to be collected in accordance with IS:
metre interval.
Undisturbed samples were collected using 100 mm dia and 450 mm long MS
tubes provided with sampler head with ball check arrangement. Collection of
possible and such collected samples will not truly represent the undisturbed
conditions.
adopter head was removed along with the disturbed material. The visible
ends of the samples shall each be trimmed off any wet disturbed soil. The
ends will then be coated alternately with four layers of just molten wax. More
molten wax will then be added to give a total thickness of not less than
6. LABORATORY TESTS:
The following laboratory tests were conducted to
determine the engineering characteristics of sub-soils:
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 8 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
6.1. Field moisture contents were determined by oven drying method as per IS
2720 (part II)-2010. The results have been reported in table 1 to table 10
6.2. Bulk density of soil strata were obtained using Shelby tubes in accordance
with IS 2720 (part XXIX)-1975. The results have been reported in table 1 to
2720 (Part IV) - 2010, for the purpose of identification by grain size analysis,
on coarse part of the soil samples and the results have been reported in
accordance with IS 2720 (Part IV) - 1965 on the part of soil samples
obtained after the sieve analysis. The results have been reported in table 1
6.5. Atterbergs’ limits tests were performed in accordance with IS 2720 (part
6.6. Specific gravity tests were performed in accordance with IS 2720 (part III-
sec. 1) -2011 and the results have been reported in table 1 to table 10
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 9 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
6.7. Consolidation tests were performed on cohesive soil samples in
accordance with IS: 2720 (part XV)-2011. The results have been reported
6.8. Direct shear tests were performed as per IS 2720 (part XIII)-2016, on the
undisturbed soil samples obtained during the field investigation. The results
soil samples obtained during the field investigation. The results have been
6.10. Shrinkage Limit tests were performed in accordance with IS 2720 (part-VI)
-1972 and the results have been reported in table 1 to table 10 “SUMMARY
6.11. Free Swell Index were performed in accordance with IS 2720 (part-XL) -
1977 and the results have been reported in table 1 to table 13 “SUMMARY
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 10 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
6.12. Chemical analysis on soil samples were performed in accordance with
during the boring operation. Depth of water table was recorded as per IS 6935-
1973. Recorded depth of water table in different bore holes has been given in table
done with the help of soil characteristics obtained in laboratory tests as per IS
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 11 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
1498-1978. The detailed nature of the soil strata have been reported in table 1 to
consist of low to intermediate plasticity silty clays and silts which overlain by loose
to medium dense silty and followed by very dense poorly graded sand with silt. The
foundation for the proposed railway bridges has been calculated for bored Cast-
in-situ RCC pile foundation as per IS: 2911 (part-1, section-2)-2010. Load
bearing capacities of RCC piles of diameter 1000 mm with varying length has
been worked out. The cut-off level has been considered at 2.0 metre below the
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 12 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki
under Lucknow division of Northern Railway.
The detailed calculations of pile load carrying capacity in compression and uplift
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 13 of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
2.00 4.00 3.00 2.00 2.00 18.39 8.39 25.03 6.28 26.7 26.7 1.000 79.11 79.11 17 1 106.81 106.81 4.00 26.7 17 8.39 9 10.50 5.51 33.42 416.37 602.30 39.27 225.20 200.77 75.07
4.00 6.00 5.00 2.00 4.00 18.13 8.13 41.30 6.28 26.7 26.7 1.000 130.50 209.61 17 1 106.81 213.63 6.00 30.7 0 8.13 9 13.80 8.84 49.43 567.22 990.45 78.54 501.78 330.15 167.26
6.00 8.00 7.00 2.00 6.00 18.13 8.13 56.62 6.28 30.7 30.7 1.035 218.62 428.23 0 1 0 213.63 8.00 30.7 0 7.66 9 13.80 10.25 64.75 736.92 1378.78 117.81 759.67 459.59 253.22
8.00 10.00 9.00 2.00 8.00 17.66 7.66 72.08 6.28 31.1 31.1 1.055 288.21 716.45 0 1 0 213.63 10.00 31.1 0 7.66 9 15.00 12.01 79.74 981.20 1911.28 157.08 1087.15 637.09 362.38
10.00 12.00 11.00 2.00 10.00 17.79 7.79 87.66 6.28 31.1 31.1 1.055 350.54 1066.99 0 1 0 213.63 12.00 30.7 0 7.79 9 13.80 11.29 95.45 1075.38 2355.99 196.35 1476.97 785.33 492.32
12.00 14.00 13.00 2.00 12.00 17.79 7.79 103.50 6.28 30.7 30.7 1.035 399.64 1466.63 0 1 0 213.63 14.00 30.9 0 7.92 9 15.00 13.22 111.29 1360.16 3040.42 235.62 1915.88 1013.47 638.63
14.00 16.00 15.00 2.00 14.00 17.92 7.92 103.50 6.28 30.9 30.9 1.045 406.72 1873.35 0 1 0 213.63 16.00 30.9 0 7.92 9 15.00 12.73 111.42 1360.16 3447.13 274.89 2361.87 1149.04 787.29
361 BH - A1 16.00 17.00 16.50 1.00 15.00 18.30 8.30 103.50 3.14 30.9 30.9 1.045 203.36 2076.71 0 1 0 213.63 17.00 30.1 0 8.30 9 13.80 11.11 107.65 1210.02 3500.35 294.52 2584.86 1166.78 861.62
17.00 18.00 17.50 1.00 16.00 18.30 8.30 103.50 3.14 30.1 30.1 1.005 189.43 2266.14 0 1 0 213.63 18.00 30.1 0 8.30 9 13.80 9.72 107.65 1205.48 3685.24 314.16 2793.92 1228.41 931.31
18.00 20.00 19.00 2.00 18.00 18.30 8.30 103.50 6.28 30.1 30.1 1.005 378.86 2644.99 0 1 0 213.63 20.00 30.1 0 8.28 9 13.80 9.72 111.80 1250.65 4109.27 353.43 3212.05 1369.76 1070.68
20.00 21.00 20.50 1.00 19.00 18.28 8.28 103.50 3.14 30.1 30.1 1.005 189.43 2834.42 0 1 0 213.63 21.00 30.1 0 8.28 9 13.80 14.77 107.64 1221.80 4269.85 373.06 3421.11 1423.28 1140.37
21.00 22.00 21.50 1.00 20.00 18.28 8.28 103.50 3.14 30.4 30.4 1.020 194.58 3029.00 0 1 0 213.63 22.00 30.4 0 8.28 9 13.80 10.22 107.64 1206.93 4449.56 392.70 3635.33 1483.19 1211.78
22.00 24.00 23.00 2.00 22.00 18.28 8.28 103.50 6.28 30.4 30.4 1.020 389.17 3418.17 0 1 0 213.63 24.00 30.4 0 8.31 9 13.80 10.22 111.78 1252.18 4883.98 431.97 4063.77 1627.99 1354.59
24.00 26.00 25.00 2.00 24.00 18.31 8.31 103.50 6.28 30.4 30.4 1.020 389.17 3807.34 0 1 0 213.63 26.00 30.7 0 8.31 9 13.80 10.72 111.81 1254.15 5275.11 471.24 4492.20 1758.37 1497.40
26.00 27.00 26.50 1.00 25.00 18.31 8.31 103.50 3.14 30.7 30.7 1.035 199.82 4007.16 0 1 0 213.63 27.00 30.7 0 8.31 9 13.80 11.76 107.66 1212.26 5433.04 490.87 4711.66 1811.01 1570.55
2.00 4.00 3.00 2.00 2.00 18.83 8.83 26.42 6.28 25.9 25.9 1.000 80.59 80.59 0 1 0 0 4.00 25.9 0 8.83 9 10.50 6.17 35.25 313.89 394.48 39.27 119.86 131 40
4.00 6.00 5.00 2.00 4.00 18.67 8.67 43.75 6.28 25.9 25.9 1.000 133.47 214.06 0 1 0 0 6.00 28.7 0 8.67 9 12.00 8.52 52.42 526.08 740.14 78.54 292.60 247 97.5
361 BH - P2 6.00 8.00 7.00 2.00 6.00 18.67 8.67 60.10 6.28 28.7 28.7 1.000 206.74 420.80 0 1 0 0 8.00 28.7 0 8.18 9 12.00 9.01 68.77 681.04 1101.84 117.81 538.61 367 180
8.00 10.00 9.00 2.00 8.00 18.18 8.18 76.77 6.28 28.9 28.9 1.000 266.28 687.08 5 1 31.42 31.42 10.00 28.9 5 8.18 9 13.00 8.18 84.95 934.43 1652.93 157.08 875.58 551 292
10.00 12.00 11.00 2.00 10.00 18.50 8.50 93.76 6.28 28.9 28.9 1.000 325.22 1012.30 5 1 31.42 62.83 12.00 27.6 9 8.50 9 11.30 7.10 102.26 1000.74 2075.87 196.35 1271.48 692 424
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 14of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
12.00 14.00 13.00 2.00 12.00 18.50 8.50 110.57 6.28 27.6 27.6 1.000 363.19 1375.49 9 1 56.55 119.38 14.00 27.6 9 8.40 9 11.30 7.88 119.07 1153.05 2647.92 235.62 1730.49 883 577
14.00 16.00 15.00 2.00 14.00 18.40 8.40 110.57 6.28 32.3 32.3 1.115 489.69 1865.18 0 1 0 119.38 16.00 32.3 0 8.40 9 16.00 16.99 118.97 1560.14 3544.70 274.89 2259.45 1182 753
16.00 17.00 16.50 1.00 15.00 18.40 8.40 110.57 3.14 32.3 32.3 1.115 244.85 2110.03 0 1 0 119.38 17.00 32.3 0 8.54 9 16.00 16.99 114.77 1507.99 3737.40 294.52 2523.93 1246 841
17.00 18.00 17.50 1.00 16.00 18.54 8.54 110.57 3.14 30.7 30.7 1.035 213.47 2323.49 0 1 0 119.38 18.00 30.7 0 8.54 9 13.80 13.55 114.84 1297.68 3740.55 314.16 2757.03 1247 919
18.00 20.00 19.00 2.00 18.00 18.54 8.54 110.57 6.28 30.7 30.7 1.035 426.93 2750.43 0 1 0 119.38 20.00 30.7 0 8.11 9 13.80 13.55 119.11 1341.93 4211.73 353.43 3223.24 1404 1074
361 BH - P2 20.00 21.00 20.50 1.00 19.00 18.11 8.11 110.57 3.14 30.7 30.7 1.035 213.47 2963.89 0 1 0 119.38 21.00 30.7 0 8.11 9 13.80 16.57 114.62 1302.69 4385.96 373.06 3456.34 1462 1152
21.00 22.00 21.50 1.00 20.00 18.11 8.11 110.57 3.14 30.7 30.7 1.035 213.47 3177.36 0 1 0 119.38 22.00 30.7 0 8.11 9 13.80 16.57 114.62 1302.69 4599.43 392.70 3689.44 1533 1230
22.00 24.00 23.00 2.00 22.00 18.11 8.11 110.57 6.28 30.7 30.7 1.035 426.93 3604.29 0 1 0 119.38 24.00 32.7 - 8.70 9 16.00 25.98 118.68 1589.36 3297 431.97 3729 1099 1243
24.00 26.00 25.00 2.00 24.00 17.37 7.37 110.57 6.28 30.1 30.1 1.005 404.73 4009.02 0 1 0 119.38 26.00 30.1 0 7.37 9 13.80 12.17 117.94 1321.18 4618 471.24 3768 1539 1256
26.00 27.00 26.50 1.00 25.00 17.37 7.37 110.57 3.14 30.1 30.1 1.005 202.36 4211.39 0 1 0 119.38 27.00 30.1 0 7.37 9 13.80 12.17 114.25 1281.01 4780 490.87 3990 1593 1330
2.00 4.00 3.00 2.00 2.00 17.89 7.89 23.89 6.28 8.5 8.5 1.000 22.43 22.43 63 1 395.84 395.84 4.00 8.5 63 7.89 9 2.11 0.61 31.78 502.82 921.09 39.27 457.54 307 153
4.00 6.00 5.00 2.00 4.00 18.31 8.31 40.50 6.28 8.5 8.5 1.000 38.03 60.46 63 1 395.84 791.68 6.00 24.4 10 8.31 9 9.28 4.54 48.81 443.84 1295.98 78.54 930.69 432 310
6.00 8.00 7.00 2.00 6.00 18.31 8.31 55.98 6.28 24.4 24.4 1.000 159.55 220.01 10 1 62.83 854.51 8.00 26.7 12 7.74 9 10.50 5.25 64.29 634.64 1709.16 117.81 1192.33 570 397
8.00 10.00 9.00 2.00 8.00 17.74 7.74 72.04 6.28 26.7 26.7 1.000 227.66 447.67 12 1 75.40 929.91 10.00 26.7 12 7.74 9 10.50 6.17 79.78 765.98 2143.56 157.08 1534.66 715 512
10.00 12.00 11.00 2.00 10.00 18.13 8.13 88.34 6.28 30.6 30.6 1.030 338.11 785.78 0 1 0 929.91 12.00 30.6 0 8.13 9 13.80 13.60 96.47 1095.38 2811.08 196.35 1912.04 937 637
373A BH - A1
12.00 14.00 13.00 2.00 12.00 18.13 8.13 104.75 6.28 30.6 30.6 1.030 400.92 1186.70 0 1 0 929.91 14.00 30.6 0 8.21 9 13.80 13.60 112.88 1274.72 3391.33 235.62 2352.23 1130 784
14.00 16.00 15.00 2.00 14.00 18.21 8.21 104.75 6.28 29.1 29.1 1.000 366.33 1553.04 0 1 0 929.91 16.00 29.1 0 8.21 9 13.00 10.73 112.96 1194.90 3677.85 274.89 2757.84 1226 919
16.00 17.00 16.50 1.00 15.00 18.21 8.21 104.75 3.14 29.1 29.1 1.000 183.17 1736.20 0 1 0 929.91 17.00 29.1 0 8.21 9 13.00 10.73 108.86 1152.74 3818.86 294.52 2960.64 1273 987
17.00 18.00 17.50 1.00 16.00 18.56 8.56 104.75 3.14 29.1 29.1 1.000 183.17 1919.37 0 1 0 929.91 18.00 29.1 0 8.56 9 13.00 10.73 109.03 1156.02 2666 314.16 2980 889 993
18.00 20.00 19.00 2.00 18.00 18.56 8.56 104.75 6.28 29.3 29.3 1.000 369.35 2288.72 0 1 0 929.91 20.00 29.3 0 8.56 9 13.00 10.85 113.31 1200.38 3866 353.43 3020 1289 1007
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 15of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
20.00 21.00 20.50 1.00 19.00 18.56 8.56 104.75 3.14 29.3 29.3 1.000 184.67 2473.39 0 1 0 929.91 21.00 29.3 0 8.56 9 13.00 10.85 109.03 1156.43 4007 373.06 3224 1336 1075
21.00 22.00 21.50 1.00 20.00 18.37 8.37 104.75 3.14 29.3 29.3 1.000 184.67 2658.07 0 1 0 929.91 22.00 29.3 0 8.37 9 13.00 10.85 108.94 1154.64 4190 392.70 3428 1397 1143
22.00 24.00 23.00 2.00 22.00 18.37 8.37 104.75 6.28 29.3 29.3 1.000 369.35 3027.42 0 1 0 929.91 24.00 29.3 0 8.37 9 13.00 13.37 113.12 1205.96 4611 431.97 3837 1537 1279
373A BH - A1 24.00 26.00 25.00 2.00 24.00 18.37 8.37 104.75 6.28 29.4 29.4 1.000 370.86 3398.28 0 1 0 929.91 26.00 29.4 0 8.37 9 13.00 10.98 113.12 1198.06 4974 471.24 4247 1658 1416
26.00 27.00 26.50 1.00 25.00 17.17 7.17 104.75 3.14 29.4 29.4 1.000 185.43 3583.71 0 1 0 929.91 27.00 29.4 0 7.17 9 13.00 10.98 108.34 1143.71 5105 490.87 4452 1702 1484
2.00 4.00 3.00 2.00 2.00 18.00 8.00 24.22 6.28 6.8 6.8 1.000 18.14 18.14 56 1 351.86 351.86 4.00 6.8 56 8.00 9 1.93 0.48 32.22 448.80 818.80 39.27 409.27 272.93 136.42
4.00 6.00 5.00 2.00 4.00 18.45 8.45 41.13 6.28 6.8 6.8 1.000 30.81 48.96 56 1 351.86 703.72 6.00 23.1 7 8.45 9 8.56 4.40 49.58 399.72 1152.39 78.54 831.21 384.13 277.07
6.00 8.00 7.00 2.00 6.00 18.45 8.45 57.50 6.28 23.1 23.1 1.000 154.10 203.06 7 1 43.98 747.70 8.00 23.1 7 8.19 9 8.56 4.32 65.95 509.72 1460.48 117.81 1068.57 486.83 356.19
8.00 10.00 9.00 2.00 8.00 18.19 8.19 73.80 6.28 24.1 24.1 1.000 207.43 410.49 9 1 56.55 804.25 10.00 24.1 9 8.19 9 9.28 4.52 81.99 679.71 1894.44 157.08 1371.82 631.48 457.27
10.00 12.00 11.00 2.00 10.00 18.12 8.12 90.02 6.28 25.3 25.3 1.000 267.37 677.86 11 1 69.12 873.36 12.00 25.3 11 8.12 9 10.00 5.60 98.14 871.51 2422.74 196.35 1747.58 807.58 582.53
12.00 14.00 13.00 2.00 12.00 18.12 8.12 106.21 6.28 25.3 25.3 1.000 315.46 993.32 11 1 69.12 942.48 14.00 3.7 53 8.10 9 1.34 0.25 114.33 498.65 2434.45 235.62 2171.42 811.48 723.81
14.00 16.00 15.00 2.00 14.00 18.10 8.10 106.21 6.28 3.7 3.7 1.000 43.16 1036.48 53 1 333.01 1275.49 16.00 3.7 53 8.10 9 1.34 0.23 114.31 498.59 2810.56 274.89 2586.85 936.85 862.28
373A BH - A2 16.00 17.00 16.50 1.00 15.00 18.31 8.31 106.21 3.14 3.7 3.7 1.000 21.58 1058.06 53 1 166.50 1441.99 17.00 26.1 4 8.31 9 10.50 5.29 110.37 961.32 3461.37 294.52 2794.57 1153.79 931.52
17.00 18.00 17.50 1.00 16.00 18.31 8.31 106.21 3.14 26.1 26.1 1.000 163.47 1221.52 4 1 12.57 1454.56 18.00 26.1 4 9.08 9 10.50 7.06 110.37 969.28 3645.36 314.16 2990.24 1215.12 996.75
18.00 20.00 19.00 2.00 18.00 19.08 9.08 106.21 6.28 28.4 28.4 1.000 360.84 1582.36 0 1 0 1454.56 20.00 28.4 0 9.08 9 12.00 10.59 115.29 1130.98 4167.90 353.43 3390.35 1389.30 1130.12
20.00 21.00 20.50 1.00 19.00 19.08 9.08 106.21 3.14 28.4 28.4 1.000 180.42 1762.78 0 1 0 1454.56 21.00 28.4 0 9.08 9 12.00 10.59 110.75 1087.94 4305.28 373.06 3590.40 1435.09 1196.80
21.00 22.00 21.50 1.00 20.00 19.08 9.08 106.21 3.14 28.4 28.4 1.000 180.42 1943.20 0 1 0 1454.56 22.00 28.4 0 8.07 9 12.00 10.59 110.75 1083.71 4481.47 392.70 3790.46 1493.82 1263.49
22.00 24.00 23.00 2.00 22.00 18.07 8.07 106.21 6.28 29.1 29.1 1.000 371.45 2314.65 0 1 0 1454.56 24.00 29.1 0 8.07 9 13.00 10.58 114.28 1207.42 4976.63 431.97 4201.18 1658.88 1400.39
24.00 26.00 25.00 2.00 24.00 18.07 8.07 106.21 6.28 29.1 29.1 1.000 371.45 2686.10 0 1 0 1454.56 26.00 29.1 0 8.45 9 13.00 10.58 114.28 1209.01 5349.67 471.24 4611.89 1783.22 1537.30
26.00 27.00 26.50 1.00 25.00 18.45 8.45 106.21 3.14 29.1 29.1 1.000 185.72 2871.82 0 1 0 1454.56 27.00 29.1 0 8.45 9 13.00 12.62 110.44 1176.32 5502.70 490.87 4817.25 1834.23 1605.75
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 16of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
2.00 4.00 3.00 2.00 2.00 18.35 8.35 25.06 6.28 28.9 28.9 1.000 86.93 86.93 0 1 0 0 4.00 28.9 0 8.35 9 13.00 6.68 33.41 365.18 452.11 39.27 126.20 150.70 42.07
375 BH - A1 4.00 6.00 5.00 2.00 4.00 18.39 8.39 41.85 6.28 28.9 28.9 1.000 145.14 232.07 0 1 0 0 6.00 31.7 0 8.39 9 15.00 9.74 50.24 627.55 859.62 78.54 310.61 286.54 103.54
6.00 8.00 7.00 2.00 6.00 18.39 8.39 58.04 6.28 31.7 31.7 1.085 244.35 476.42 0 1 0 0 8.00 31.7 0 8.39 9 15.00 14.36 66.43 834.73 1311.15 117.81 594.23 437.05 198.08
8.00 10.00 9.00 2.00 8.00 18.10 8.10 74.23 6.28 31.7 31.7 1.085 312.52 788.94 0 1 0 0 10.00 31.4 0 8.10 9 15.00 13.75 82.33 1019.54 1808.49 157.08 946.02 602.83 315.34
10.00 12.00 11.00 2.00 10.00 18.10 8.10 89.82 6.28 31.4 31.4 1.070 368.61 1157.56 0 1 0 0 12.00 31.4 0 7.80 9 15.00 12.76 97.92 1199.73 2357.28 196.35 1353.91 785.76 451.30
12.00 14.00 13.00 2.00 12.00 17.80 7.80 106.03 6.28 28.3 28.3 1.000 358.70 1516.26 5 1 28.27 28.27 14.00 28.3 5 7.80 9 12.00 8.03 113.83 1135.81 2680.34 235.62 1780.15 893.45 593.38
14.00 16.00 15.00 2.00 14.00 18.40 8.40 106.03 6.28 28.3 28.3 1.000 358.70 1874.96 5 1 28.27 56.55 16.00 27.4 5 8.40 9 11.30 7.30 114.43 1081.25 3012.76 274.89 2206.40 1004.25 735.47
16.00 17.00 16.50 1.00 15.00 18.40 8.40 106.03 3.14 27.4 27.4 1.000 172.66 2047.62 5 1 15.71 72.26 17.00 27.4 5 8.40 9 11.30 7.70 110.23 1045.09 3164.97 294.52 2414.40 1054.99 804.80
17.00 18.00 17.50 1.00 16.00 18.40 8.40 106.03 3.14 27.4 27.4 1.000 172.66 2220.28 5 1 15.71 87.96 18.00 27.4 5 8.10 9 11.30 7.70 110.23 1044.18 3352.42 314.16 2622.40 1117.47 874.13
375 BH - A1
18.00 20.00 19.00 2.00 18.00 18.10 8.10 106.03 6.28 30.7 30.7 1.035 409.39 2629.67 0 1 0 87.96 20.00 30.7 0 8.10 9 13.80 13.36 114.13 1286.95 4004.59 353.43 3071.06 1334.86 1023.69
20.00 21.00 20.50 1.00 19.00 18.10 8.10 106.03 3.14 30.7 30.7 1.035 204.70 2834.37 0 1 0 87.96 21.00 30.7 0 8.10 9 13.80 13.36 110.08 1242.80 4165.13 373.06 3295.40 1388.38 1098.47
21.00 22.00 21.50 1.00 20.00 18.10 8.10 106.03 3.14 30.7 30.7 1.035 204.70 3039.06 0 1 0 87.96 22.00 30.7 0 8.43 9 13.80 13.36 110.08 1244.54 4371.57 392.70 3519.73 1457.19 1173.24
22.00 24.00 23.00 2.00 22.00 18.43 8.43 106.03 6.28 30.7 30.7 1.035 409.39 3448.46 0 1 0 87.96 24.00 30.7 0 8.43 9 13.80 16.57 114.46 1302.96 4839.38 431.97 3968.39 1613.13 1322.80
24.00 26.00 25.00 2.00 24.00 18.43 8.43 106.03 6.28 31.1 31.1 1.055 423.97 3872.43 0 1 0 87.96 26.00 31.1 0 8.43 9 15.00 13.65 114.46 1401.76 5362.15 471.24 4431.63 1787.38 1477.21
26.00 27.00 26.50 1.00 25.00 18.40 8.40 106.03 3.14 31.1 31.1 1.055 211.98 4084.41 0 1 0 87.96 27.00 31.1 0 8.40 9 15.00 13.65 110.23 1351.47 5523.85 490.87 4663.25 1841.28 1554.42
2.00 4.00 3.00 2.00 2.00 18.00 8.00 24.54 6.28 21.4 21.4 1.000 60.42 60.42 7 1 43.98 43.98 4.00 21.4 7 8.00 9 7.12 3.10 32.54 242.58 346.98 39.27 143.68 115.66 47.89
4.00 6.00 5.00 2.00 4.00 19.09 9.09 42.73 6.28 21.4 21.4 1.000 105.21 165.64 7 1 43.98 87.96 6.00 24.1 7 9.09 9 9.28 4.32 51.82 445.19 698.79 78.54 332.14 232.93 110.71
375 BH - A2 6.00 8.00 7.00 2.00 6.00 19.09 9.09 59.87 6.28 24.1 24.1 1.000 168.28 333.91 7 1 43.98 131.95 8.00 24.1 7 8.57 9 9.28 4.87 68.96 571.82 1037.68 117.81 583.67 345.89 194.56
8.00 10.00 9.00 2.00 8.00 18.57 8.57 76.98 6.28 25.4 25.4 1.000 229.68 563.59 9 1 56.55 188.50 10.00 25.4 9 8.57 9 10.00 6.38 85.55 761.46 1513.54 157.08 909.17 504.51 303.06
10.00 12.00 11.00 2.00 10.00 18.57 8.57 94.06 6.28 25.4 25.4 1.000 280.62 844.22 9 1 56.55 245.04 12.00 25.4 9 8.54 9 10.00 6.38 102.63 896.28 1985.54 196.35 1285.61 661.85 428.54
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 17of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
12.00 14.00 13.00 2.00 12.00 18.54 8.54 111.06 6.28 30.5 30.5 1.025 421.31 1265.52 0 1 0 245.04 14.00 30.5 0 8.46 9 13.80 11.74 119.60 1343.08 2853.65 235.62 1746.19 951.22 582.06
14.00 16.00 15.00 2.00 14.00 18.46 8.46 111.06 6.28 30.5 30.5 1.025 421.31 1686.83 0 1 0 245.04 16.00 30.5 0 8.46 9 13.80 13.90 119.52 1349.42 3281.30 274.89 2206.77 1093.77 735.59
16.00 17.00 16.50 1.00 15.00 18.46 8.46 111.06 3.14 30.5 30.5 1.025 210.65 1897.49 0 1 0 245.04 17.00 30.5 0 8.49 9 13.80 13.90 115.29 1303.47 3446.01 294.52 2437.06 1148.67 812.35
17.00 18.00 17.50 1.00 16.00 18.49 8.49 111.06 3.14 30.9 30.9 1.045 218.21 2115.70 0 1 0 245.04 18.00 30.9 0 8.49 9 15.00 13.62 115.30 1412.00 3772.74 314.16 2674.90 1257.58 891.63
18.00 20.00 19.00 2.00 18.00 18.49 8.49 111.06 6.28 30.9 30.9 1.045 436.42 2552.11 0 1 0 245.04 20.00 30.9 0 8.50 9 15.00 13.62 119.55 1462.36 4259.52 353.43 3150.58 1419.84 1050.19
20.00 21.00 20.50 1.00 19.00 18.50 8.50 111.06 3.14 30.9 30.9 1.045 218.21 2770.32 0 1 0 245.04 21.00 30.9 0 8.50 9 15.00 17.16 115.31 1424.02 4439.39 373.06 3388.43 1479.80 1129.48
21.00 22.00 21.50 1.00 20.00 18.50 8.50 111.06 3.14 30.9 30.9 1.045 218.21 2988.53 0 1 0 245.04 22.00 29.4 4 8.50 9 13.00 13.53 115.31 1258.07 4491.64 392.70 3626.27 1497.21 1208.76
375 BH - A2
22.00 24.00 23.00 2.00 22.00 18.50 8.50 111.06 6.28 29.4 29.4 1.000 393.19 3381.71 4 1 25.13 270.18 24.00 29.4 4 7.81 9 13.00 10.53 119.56 1288.78 4940.68 431.97 4083.86 1646.89 1361.29
24.00 26.00 25.00 2.00 24.00 17.81 7.81 111.06 6.28 29.4 29.4 1.000 393.19 3774.90 4 1 25.13 295.31 26.00 29.4 4 7.81 9 13.00 10.53 118.87 1281.70 5351.91 471.24 4541.45 1783.97 1513.82
26.00 27.00 26.50 1.00 25.00 17.81 7.81 111.06 3.14 29.4 29.4 1.000 196.59 3971.50 4 1 12.57 307.88 27.00 29.4 4 7.81 9 13.00 13.53 114.96 1250.84 5530.21 490.87 4770.25 1843.40 1590.08
2.00 4.00 3.00 2.00 2.00 18.26 8.26 24.87 6.28 4.1 4.1 1.000 11.20 11.20 41 1 257.61 257.61 4.00 4.1 41 8.26 9 1.46 0.26 33.13 330.58 599.39 39.27 308.08 199.80 102.69
4.00 6.00 5.00 2.00 4.00 18.41 8.41 41.70 6.28 4.1 4.1 1.000 18.78 29.98 41 1 257.61 515.22 6.00 5.1 47 8.41 9 1.57 0.33 50.11 397.41 942.61 78.54 623.74 314.20 207.91
6.00 8.00 7.00 2.00 6.00 18.41 8.41 58.89 6.28 5.1 5.1 1.000 33.02 63.00 47 1 295.31 810.53 8.00 5.1 47 8.60 9 1.57 0.34 67.30 418.78 1292.31 117.81 991.34 430.77 330.45
8.00 10.00 9.00 2.00 8.00 18.60 8.60 77.12 6.28 5.9 5.9 1.000 50.08 113.08 49 1 307.88 1118.41 10.00 5.9 49 8.60 9 1.75 0.41 85.72 468.30 1699.78 157.08 1388.56 566.59 462.85
10.00 12.00 11.00 2.00 10.00 18.60 8.60 96.40 6.28 5.9 5.9 1.000 62.60 175.67 49 1 307.88 1426.28 12.00 5.9 49 9.64 9 1.75 0.41 105.00 495.13 2097.08 196.35 1798.30 699.03 599.43
433A BH - A1
12.00 14.00 13.00 2.00 12.00 19.64 9.64 114.44 6.28 24.3 24.3 1.000 324.67 500.34 4 1 25.13 1451.42 14.00 24.3 4 8.40 9 9.28 5.33 124.08 955.81 2907.57 235.62 2187.38 969.19 729.13
14.00 16.00 15.00 2.00 14.00 18.40 8.40 114.44 6.28 25.1 25.1 1.000 336.84 837.18 4 1 25.13 1476.55 16.00 25.1 4 8.40 9 10.00 6.23 122.84 1019.57 3333.30 274.89 2588.62 1111.10 862.87
16.00 17.00 16.50 1.00 15.00 18.40 8.40 114.44 3.14 25.1 25.1 1.000 168.42 1005.59 4 1 12.57 1489.11 17.00 25.1 4 6.80 9 10.00 6.23 118.64 982.45 3477.16 294.52 2789.23 1159.05 929.74
17.00 18.00 17.50 1.00 16.00 16.80 6.80 114.44 3.14 28.3 28.3 1.000 193.59 1199.18 0 1 0 1489.11 18.00 28.3 0 6.80 9 12.00 10.35 117.84 1144.94 3833.24 314.16 3002.46 1277.75 1000.82
18.00 20.00 19.00 2.00 18.00 16.80 6.80 114.44 6.28 28.3 28.3 1.000 387.18 1586.36 0 1 0 1489.11 20.00 28.3 0 7.60 9 12.00 10.35 121.24 1180.44 4255.92 353.43 3428.90 1418.64 1142.97
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 18of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
20.00 21.00 20.50 1.00 19.00 17.60 7.60 114.44 3.14 28.3 28.3 1.000 193.59 1779.95 0 1 0 1489.11 21.00 28.3 0 7.60 9 12.00 11.47 118.24 1155.38 4424.44 373.06 3642.13 1474.81 1214.04
21.00 22.00 21.50 1.00 20.00 17.60 7.60 114.44 3.14 28.3 28.3 1.000 193.59 1973.54 0 1 0 1489.11 22.00 25.7 7 7.60 9 10.00 8.09 118.24 1008.16 4470.82 392.70 3855.35 1490.27 1285.12
22.00 24.00 23.00 2.00 22.00 17.60 7.60 114.44 6.28 25.7 25.7 1.000 346.06 2319.60 7 1 43.98 1533.10 24.00 25.7 7 7.88 9 10.00 6.59 122.04 1034.42 4887.12 431.97 4284.67 1629.04 1428.22
24.00 26.00 25.00 2.00 24.00 17.88 7.88 114.44 6.28 25.7 25.7 1.000 346.06 2665.66 7 1 43.98 1577.08 26.00 25.7 7 7.88 9 10.00 6.59 122.32 1036.63 5279.37 471.24 4713.98 1759.79 1571.33
26.00 27.00 26.50 1.00 25.00 17.88 7.88 114.44 3.14 25.7 25.7 1.000 173.03 2838.70 7 1 21.99 1599.07 27.00 25.7 7 7.88 9 10.00 8.09 118.38 1010.16 5447.93 490.87 4928.64 1815.98 1642.88
2.00 4.00 3.00 2.00 2.00 18.26 8.26 24.92 6.28 5.2 5.2 1.000 14.25 14.25 39 1 245.04 245.04 4.00 5.2 39 8.26 9 1.57 0.34 33.18 319.55 578.85 39.27 298.56 193 99.5
4.00 6.00 5.00 2.00 4.00 18.55 8.55 42.02 6.28 5.2 5.2 1.000 24.03 38.28 39 1 245.04 490.09 6.00 7.7 43 8.55 9 1.93 0.54 50.57 384.64 913.01 78.54 606.91 304 202
6.00 8.00 7.00 2.00 6.00 18.55 8.55 58.82 6.28 7.7 7.7 1.000 49.96 88.24 43 1 270.18 760.27 8.00 7.7 43 8.40 9 1.93 0.54 67.37 410.23 1258.74 117.81 966.32 420 322
8.00 10.00 9.00 2.00 8.00 18.40 8.40 75.67 6.28 3.7 3.7 1.000 30.75 118.99 51 1 320.44 1080.71 10.00 3.7 51 8.40 9 1.34 0.25 84.07 452.43 1652.12 157.08 1356.78 551 452
10.00 12.00 11.00 2.00 10.00 18.45 8.45 92.58 6.28 3.7 3.7 1.000 37.62 156.60 51 1 320.44 1401.15 12.00 4.2 51 8.45 9 1.46 0.28 101.03 480.07 2037.83 196.35 1754.10 679 585
12.00 14.00 13.00 2.00 12.00 18.45 8.45 112.83 6.28 4.2 4.2 1.000 52.06 208.67 51 1 320.44 1721.59 14.00 27.9 7 10.13 9 12.00 9.33 121.28 1236.85 3167.11 235.62 2165.88 1056 722
14.00 16.00 15.00 2.00 14.00 18.85 8.85 112.83 6.28 27.9 27.9 1.000 375.37 584.04 7 1 43.98 1765.58 16.00 26.7 6 8.85 9 10.50 6.43 121.68 1074.48 3424.10 274.89 2624.50 1141 875
433A BH - A2 16.00 17.00 16.50 1.00 15.00 18.85 8.85 112.83 3.14 26.7 26.7 1.000 178.28 762.32 6 1 18.85 1784.42 17.00 26.7 6 8.02 9 10.50 6.43 117.26 1035.67 3582.42 294.52 2841.27 1194 947
17.00 18.00 17.50 1.00 16.00 18.02 8.02 112.83 3.14 25.4 25.4 1.000 168.32 930.64 5 1 15.71 1800.13 18.00 25.4 5 8.02 9 10.00 6.11 116.84 977.96 2547 314.16 2861 849 954
18.00 20.00 19.00 2.00 18.00 18.02 8.02 112.83 6.28 25.4 25.4 1.000 336.64 1267.27 5 1 31.42 1831.55 20.00 25.4 5 7.93 9 10.00 6.11 120.85 1009.42 3556 353.43 2900 1185 967
20.00 21.00 20.50 1.00 19.00 17.93 7.93 112.83 3.14 25.4 25.4 1.000 168.32 1435.59 5 1 15.71 1847.26 21.00 25.4 5 7.93 9 10.00 7.70 116.80 982.36 3713 373.06 3104 1238 1035
21.00 22.00 21.50 1.00 20.00 17.93 7.93 112.83 3.14 24.9 24.9 1.000 164.54 1600.13 9 1 28.27 1875.53 22.00 24.9 9 7.93 9 10.00 5.62 116.80 1004.29 3928 392.70 3316 1309 1105
22.00 24.00 23.00 2.00 22.00 17.93 7.93 112.83 6.28 24.9 24.9 1.000 329.08 1929.22 9 1 56.55 1932.08 24.00 24.9 9 7.99 9 10.00 5.62 120.76 1035.75 4345 431.97 3741 1448 1247
24.00 26.00 25.00 2.00 24.00 17.99 7.99 112.83 6.28 24.9 24.9 1.000 329.08 2258.30 9 1 56.55 1988.63 26.00 24.9 9 7.99 9 10.00 5.62 120.82 1036.22 4731 471.24 4166 1577 1389
26.00 27.00 26.50 1.00 25.00 17.99 7.99 112.83 3.14 24.9 24.9 1.000 164.54 2422.84 9 1 28.27 2016.90 27.00 24.9 9 7.99 9 10.00 6.45 116.83 1007.28 4895 490.87 4379 1632 1460
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 19of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
2.00 4.00 3.00 2.00 2.00 17.76 7.76 23.19 6.28 29.7 29.7 1.000 83.12 83.12 9 1 56.55 56.55 4.00 29.7 9 7.76 9 13.00 7.29 30.95 404.24 543.91 39.27 178.94 181.30 59.65
4.00 6.00 5.00 2.00 4.00 17.57 7.57 38.34 6.28 29.7 29.7 1.000 137.39 220.52 9 1 56.55 113.10 6.00 30.7 4 7.57 9 13.80 8.37 45.91 553.93 887.54 78.54 412.15 295.85 137.38
6.00 8.00 7.00 2.00 6.00 17.57 7.57 56.10 6.28 30.7 30.7 1.035 216.61 437.12 4 1 25.13 138.23 8.00 30.7 4 8.88 9 13.80 11.10 63.67 761.47 1336.82 117.81 693.16 445.61 231.05
440 BH - A1
8.00 10.00 9.00 2.00 8.00 18.88 8.88 73.67 6.28 31.7 31.7 1.085 310.18 747.30 0 1 0 138.23 10.00 31.7 0 8.88 9 15.00 15.63 82.55 1033.04 1918.58 157.08 1042.61 639.53 347.54
10.00 12.00 11.00 2.00 10.00 18.69 8.69 91.06 6.28 31.7 31.7 1.085 383.39 1130.69 0 1 0 138.23 12.00 31.9 0 8.69 9 16.00 16.08 99.75 1316.00 2584.92 196.35 1465.27 861.64 488.42
12.00 14.00 13.00 2.00 12.00 18.69 8.69 107.95 6.28 31.9 31.9 1.095 462.31 1593.00 0 1 0 138.23 14.00 31.9 0 8.45 9 16.00 14.05 116.64 1521.27 3252.51 235.62 1966.85 1084.17 655.62
14.00 16.00 15.00 2.00 14.00 18.45 8.45 107.95 6.28 31.6 31.6 1.080 450.68 2043.68 0 1 0 138.23 16.00 31.6 0 8.45 9 15.00 15.40 116.40 1430.81 3612.72 274.89 2456.80 1204.24 818.93
16.00 17.00 16.50 1.00 15.00 18.45 8.45 107.95 3.14 31.6 31.6 1.080 225.34 2269.02 0 1 0 138.23 17.00 31.6 0 8.69 9 15.00 15.40 112.18 1382.20 3789.45 294.52 2701.77 1263.15 900.59
17.00 18.00 17.50 1.00 16.00 18.69 8.69 107.95 3.14 31.6 31.6 1.080 225.34 2494.36 0 1 0 138.23 18.00 31.6 0 8.69 9 15.00 19.26 112.30 1396.86 4029.45 314.16 2946.75 1343.15 982.25
18.00 20.00 19.00 2.00 18.00 18.69 8.69 107.95 6.28 31.3 31.3 1.065 439.22 2933.58 0 1 0 138.23 20.00 31.3 0 8.69 9 15.00 15.90 116.64 1436.81 4508.62 353.43 3425.24 1502.87 1141.75
440 BH - A1 20.00 21.00 20.50 1.00 19.00 18.69 8.69 107.95 3.14 31.3 31.3 1.065 219.61 3153.19 0 1 0 138.23 21.00 31.3 0 8.75 9 15.00 15.90 112.30 1385.70 4677.12 373.06 3664.48 1559.04 1221.49
21.00 22.00 21.50 1.00 20.00 18.75 8.75 107.95 3.14 31.3 31.3 1.065 219.61 3372.80 0 1 0 138.23 22.00 31.3 0 8.75 9 15.00 15.90 112.33 1386.06 4897.09 392.70 3903.73 1632.36 1301.24
22.00 24.00 23.00 2.00 22.00 18.75 8.75 107.95 6.28 3.9 3.9 1.000 46.24 3419.04 71 1 446.11 584.34 24.00 3.9 71 8.75 9 1.46 0.29 116.70 640.42 4643.80 431.97 4435.34 1547.93 1478.45
24.00 26.00 25.00 2.00 24.00 19.05 9.05 107.95 6.28 3.9 3.9 1.000 46.24 3465.28 71 1 446.11 1030.44 26.00 4.1 76 9.05 9 1.46 0.31 117.00 676.41 5172.13 471.24 4966.96 1724.04 1655.65
26.00 27.00 26.50 1.00 25.00 19.05 9.05 107.95 3.14 4.1 4.1 1.000 24.31 3489.59 76 1 238.76 1269.20 27.00 4.1 76 9.05 9 1.46 0.29 112.48 671.13 5429.93 490.87 5249.67 1809.98 1749.89
2.00 4.00 3.00 2.00 2.00 18.31 8.31 24.67 6.28 27.9 27.9 1.000 82.07 82.07 14 1 87.96 87.96 4.00 27.9 14 8.31 9 12.00 5.90 32.98 431.53 601.56 39.27 209.30 201 69.8
4.00 6.00 5.00 2.00 4.00 17.78 7.78 40.24 6.28 27.9 27.9 1.000 133.86 215.92 14 1 87.96 175.93 6.00 31.4 0 7.78 9 15.00 9.16 48.02 597.15 989.01 78.54 470.39 330 157
440 BH - A2 6.00 8.00 7.00 2.00 6.00 17.78 7.78 58.46 6.28 31.4 31.4 1.070 239.89 455.81 0 1 0 175.93 8.00 31.9 0 9.11 9 16.00 8.53 66.24 867.94 1499.69 117.81 749.55 500 250
8.00 10.00 9.00 2.00 8.00 19.11 9.11 75.61 6.28 31.9 31.9 1.095 323.79 779.61 0 1 0 175.93 10.00 31.9 0 9.11 9 16.00 15.36 84.72 1126.14 2081.68 157.08 1112.62 694 371
10.00 12.00 11.00 2.00 10.00 18.40 8.40 92.41 6.28 31.9 31.9 1.095 395.73 1175.34 0 1 0 175.93 12.00 30.9 0 8.40 9 15.00 13.22 100.81 1238.43 2589.70 196.35 1547.62 863 516
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 20of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki under Lucknow division of Northern Railway.
Ultimate Shaft
3
Σα.c.Asi
c at pile toe(kN/m )
2
Compression (kN)
Length of Pile (m)
at pile toe(kN/m )
Depth of Pile toe
in Tension (kN)
Eff. Unit Weight
Tension (kN)
ϕ ' at pile toe
Mean depth
Layers
depth
(m)
A B C D E F G H I J K L M N O P QR S T U V W X Y Z A B C D E F G H
12.00 14.00 13.00 2.00 12.00 18.40 8.40 109.61 6.28 30.9 30.9 1.045 430.74 1606.07 0 1 0 175.93 14.00 30.9 0 8.60 9 15.00 14.01 118.01 1446.05 3228.05 235.62 2017.62 1076 673
14.00 16.00 15.00 2.00 14.00 18.60 8.60 109.61 6.28 30.7 30.7 1.035 423.24 2029.32 0 1 0 175.93 16.00 30.7 0 8.60 9 13.80 11.29 118.21 1327.10 3532.35 274.89 2480.14 1177 827
16.00 17.00 16.50 1.00 15.00 18.60 8.60 109.61 3.14 30.7 30.7 1.035 211.62 2240.94 0 1 0 175.93 17.00 30.7 0 8.12 9 13.80 11.29 113.91 1278.08 3694.95 294.52 2711.39 1232 904
17.00 18.00 17.50 1.00 16.00 18.12 8.12 109.61 3.14 31.6 31.6 1.080 228.80 2469.74 0 1 0 175.93 18.00 31.6 0 8.12 9 15.00 15.40 113.67 1396.42 2417 314.16 2731 806 910
18.00 20.00 19.00 2.00 18.00 18.12 8.12 109.61 6.28 31.6 31.6 1.080 457.60 2927.33 0 1 0 175.93 20.00 31.6 0 8.46 9 15.00 15.40 117.73 1446.60 3863 353.43 2770 1288 923
20.00 21.00 20.50 1.00 19.00 18.46 8.46 109.61 3.14 31.6 31.6 1.080 228.80 3156.13 0 1 0 175.93 21.00 31.6 0 8.46 9 15.00 19.26 113.84 1413.39 4059 373.06 3019 1353 1006
21.00 22.00 21.50 1.00 20.00 18.46 8.46 109.61 3.14 4.1 4.1 1.000 24.68 3180.82 70 1 219.91 395.84 22.00 4.1 70 8.46 9 1.46 0.31 113.84 630.05 3520 392.70 3283 1173 1094
22.00 24.00 23.00 2.00 22.00 18.46 8.46 109.61 6.28 4.1 4.1 1.000 49.37 3230.18 70 1 439.82 835.66 24.00 4.1 70 9.15 9 1.46 0.31 118.07 635.01 4014 431.97 3811 1338 1270
440 BH - A2 24.00 26.00 25.00 2.00 24.00 19.15 9.15 109.61 6.28 4.1 4.1 1.000 49.37 3279.55 70 1 439.82 1275.49 26.00 6.1 79 9.15 9 1.75 0.50 118.76 727.70 4596 471.24 4340 1532 1447
26.00 27.00 26.50 1.00 25.00 19.15 9.15 109.61 3.14 6.1 6.1 1.000 36.80 3316.35 79 1 248.19 1523.67 27.00 6.1 79 9.15 9 1.75 0.47 114.19 721.26 4875 490.87 4645 1625 1548
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 21of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
Where,
2
E= Modulus of elasticity of RCC piles (kN/m )
4 4
I = Moment of inertia of pile section = (π/64). D (m )
D = Diameter of pile (cm)
hb= Modulus of sub grade reaction of soil at cut of level (from Table:3 of IS:
For a Pile with fix head, Permissible deflection (y) = 1 % of dia of pile = 10 mm
3
Ultimate lateral load capacity of pile (H) = 12EI / (L1+Lf) (kN)
Allowable lateral load capacity (Hal)=H/FS,
where,
FS=Factor of Safety =3.00
L = Total embedded length of pile (m)
L1 = Cantilever length of pile =0.00
Cantilever length
Concrete Grade
Stiffness Factor
Allowable Load
Location Ref./
capacity (kN)
capacity (kN)
Average SPT
Moment of
Bridge No.
Dia of pile
Bore No.
Inertia
L1/T
Lf/T
(m)
B E I N k1 T L1 Δ Lf Qu Qa
BR-361 A1 1 35 29580399 0.0491 13 1832 3.8004 0 0 2.23 0.01 8.47 286.8 95.61
BR-361 P2 1 35 29580399 0.0491 14.9 1976 3.7433 0 0 2.23 0.01 8.35 299.4 99.79
BR-373A A1 1 35 29580399 0.0491 11.8 1544 3.9327 0 0 2.23 0.01 8.77 258.4 86.13
BR-373A A2 1 35 29580399 0.0491 14.3 1976 3.7433 0 0 2.23 0.01 8.35 299.4 99.79
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 22of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
Permissible deflection
Modulus of sub grade
Cantilever length
Concrete Grade
Stiffness Factor
Allowable Load
Location Ref./
capacity (kN)
capacity (kN)
Average SPT
Moment of
Bridge No.
Dia of pile
Bore No.
Inertia
L1/T
Lf/T
(m)
B E I N k1 T L1 Δ Lf Qu Qa
BR-375 A1 1 35 29580399 0.0491 9.9 1200 4.136 0 0 2.23 0.01 9.22 222.4 74.12
BR-375 A2 1 35 29580399 0.0491 11.9 1544 3.9327 0 0 2.23 0.01 8.77 258.4 86.13
BR-433A A1 1 35 29580399 0.0491 13.1 1832 3.8004 0 0 2.23 0.01 8.47 286.8 95.61
BR-433A A2 1 35 29580399 0.0491 13.9 1832 3.8004 0 0 2.23 0.01 8.47 286.8 95.61
BR-440 A1 1 35 29580399 0.0491 14.9 1976 3.7433 0 0 2.23 0.01 8.35 299.4 99.79
BR-440 A2 1 35 29580399 0.0491 12.3 1688 3.8632 0 0 2.23 0.01 8.61 273.1 91.02
conditions. Liquefaction generally takes place in loose fine-grained sands (fines < 10
%, D60, 0.20 mm to 1.0 mm and Cu between 2 to 5) with N value less than 15. In case
of soil strata having N>15, liquefaction of soil will not take place normally.
present analysis.
from the SPT data and peak ground acceleration likely to occur at the site for a
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 23of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
In this method, cyclic shear stress likely to be induced in
the foundation strata by Design Basis Earthquake (DBE) is first evaluated. Next
determined from SPT data and the empirical relations. Finally, comparison of these
strata.
If the equivalent average of shear stress τavis normalized with the initial effective
overburden pressure (σo), the term is called seismic demand of soil layer or cyclic
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 24of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
Cyclic Resistance Ratio (CRR)
between corrected blow count (N1)60 and CRR for earthquake of magnitude 7.5.
(N1)60is the SPT blow count corrected to an effective overburden pressure of 100 kPa
CB=Correction factor for borehole dia = 1.05 for 150 mm dia borehole
Correction factor for effective overburden pressure (CN) is given by the following
relation.
CN= Sqrt (Pa/σo’)
The value of SPT blow count for soil with fines content (FC) can be adjusted to the
(N1)60CS=α + β(N1)60
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 25of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
β = [0.99+ (FC1.5/1000)]
FSL= CRR/CSR
The value of CSR and CRR are computed at different depth and depth susceptible to
liquefaction is determined.
against Liquefaction
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
Soil Type
Depth m
M = 7.5
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 26of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
rd Remarks
Ratio, h/v *
K
Soil Type
Depth m
M = 7.5
7.50 C 0.906 0.156 0.137 - - - Cohesive Soil
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 27of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio,
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 28of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio,
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 29of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
Cyclic Resistance
rd K Remarks
Ratio, h/v *
Liquefaction
at M = 7.5
Soil Type
Depth m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 30of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
9.3.6 Liquefaction analysis for BR-375_BH-A2
against Liquefaction
Cyclic Stress Ratio,
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 31of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio,
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
against Liquefaction
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
Soil Type
Depth m
M = 7.5
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 32of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
Soil Type
Depth m
M = 7.5
9.00 C 0.880 0.147 0.129 - - - Cohesive Soil
against Liquefaction
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
rd K Remarks
Ratio, h/v *
Soil Type
Depth m
M = 7.5
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 33of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
rd K Remarks
Ratio, h/v *
Soil Type
Depth m
M = 7.5
12.00 G 0.826 0.143 0.125 1.000 1.935E+00 1.54E+01 No Liquefaction
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 34of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
against Liquefaction
Cyclic Stress Ratio,
Cyclic Stress Ratio
Cyclic Resistance
Factor of Safety
Ratio, h/v *
rd K Remarks
at M = 7.5
Soil Type
Depth m
10. RECOMMENDATIONS:
Keeping in mind, the field test results, laboratory test results and IS
abutments andpiers.Diameterof Pile shall be 1000 mm and Cut-off level 2.00 metre
from existing ground level.The load bearing capacities for the specific length of pile
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 35of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
10.2 All the levels shall be referred from the existing ground level at site.
10.3 As this site does not consist of harmful chemicals, ordinary Portland cement
10.4 If any loose pocket strata are found during the excavation, the foundation shall
be laid only after ensuring that the same has been cleared and appropriate
(Arvind K. Garg)
B.Tech.(Civil), M.Tech.
Principal Consultant &
Managing Director
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 36of 158
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX – A
BORE LOCATION PLAN-1
TEST LOCATION PLAN FOR BRIDGE No.373A TEST LOCATION PLAN FOR BRIDGE No.361
8.00 M.
8.00 M.
8.70M.
PIER(P1) PIER(P2)
6. 50 42.50 M
M 21.00 M
M 0M
7 .0 0 7 .0
BH:A2
BH:A1 BH:P2 BH:A1
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 37 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX – A
BORE LOCATION PLAN-2
TEST LOCATION PLAN FOR BRIDGE No.375 TEST LOCATION PLAN FOR BRIDGE No.433A
8.00M.
8.30M.
8.50M.
PIER(P1)
22.50 M 22.50 M
M M
7 .0 7 .0 0 7 .0 7 .0 0
0M 0M
BH:A1 BH:A1
BH:A2 BH:A2
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 38 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX – A
BORE LOCATION PLAN-3
TO BARABANKI TO SOHAWAL
EXISTING TRACK
8.00M.
8.00M.
22.50 M
7.0
0M 0M
7.0
BH:A1 BH:A2
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 39 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 1: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.80
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 13/03/2019
Location / Chainage : BR-361 Casing Lowered : 24.00 Ending Date : 14/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 40 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 1: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.80
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 13/03/2019
Location / Chainage : BR-361 Casing Lowered : 24.00 Ending Date : 14/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 41 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 2: SUMMARY OF TEST RESULTS
Bore No : P2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.70
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 11/03/2019
Location / Chainage : BR-361 Casing Lowered : 24.00 Ending Date : 12/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Depth Below NGL (Meter)
Parameters Characteristic
Sample Reference No.
Soil Classification
Nature of Sample
RL in Meter
N3 (Second Drive)
Modulus of Elasticity
N2 (First Drive)
Cohesion C (kN/m2)
Observed SPT
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
N (Correct N)
Pressure (Kg/cm2)
Medium Sand (%)
Abrasion Loss(%)
Core Recovery %
Coarse Sand (%)
Shrinkage Limit
Liquid Limit (%)
Specific gravity
Swell Pressure
Fine Sand (%)
Type of Test
U.C.S (Mpa)
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 42 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 2: SUMMARY OF TEST RESULTS
Bore No : P2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.70
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 11/03/2019
Location / Chainage : BR-361 Casing Lowered : 24.00 Ending Date : 12/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Depth Below NGL (Meter)
Parameters Characteristic
Sample Reference No.
Soil Classification
Nature of Sample
RL in Meter
N3 (Second Drive)
Modulus of Elasticity
N2 (First Drive)
Cohesion C (kN/m2)
Observed SPT
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
N (Correct N)
Pressure (Kg/cm2)
Medium Sand (%)
Abrasion Loss(%)
Core Recovery %
Coarse Sand (%)
Shrinkage Limit
Liquid Limit (%)
Specific gravity
Swell Pressure
Fine Sand (%)
Type of Test
U.C.S (Mpa)
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 43 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 3: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 4.30
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 09/03/2019
Location / Chainage : BR-373A Casing Lowered : 24.00 Ending Date : 10/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 44 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 3: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 4.30
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 09/03/2019
Location / Chainage : BR-373A Casing Lowered : 24.00 Ending Date : 10/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 45 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 4: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 4.50
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 07/03/2019
Location / Chainage : BR-373A Casing Lowered : 23.00 Ending Date : 08/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear
Consolidation
SPT Test Result Grain Size Analysis Index Property Strength Shrinkage Test on Rock Specimen
Characteristic
Parameters
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 46 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 4: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 4.50
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 07/03/2019
Location / Chainage : BR-373A Casing Lowered : 23.00 Ending Date : 08/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear
Consolidation
SPT Test Result Grain Size Analysis Index Property Strength Shrinkage Test on Rock Specimen
Characteristic
Parameters
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 47 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 5: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.60
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 08/03/2019
Location / Chainage : BR-375 Casing Lowered : 24.00 Ending Date : 10/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 48 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 5: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.60
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 08/03/2019
Location / Chainage : BR-375 Casing Lowered : 24.00 Ending Date : 10/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 49 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 6: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.80
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 06/03/2019
Location / Chainage : BR-375 Casing Lowered : 24.00 Ending Date : 07/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 50 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 6: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 1.80
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 06/03/2019
Location / Chainage : BR-375 Casing Lowered : 24.00 Ending Date : 07/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 51 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 7: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.70
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 15/03/2019
Location / Chainage : BR-433A Casing Lowered : 24.00 Ending Date : 17/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 52 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 7: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.70
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 15/03/2019
Location / Chainage : BR-433A Casing Lowered : 24.00 Ending Date : 17/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 53 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 8: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.50
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 17/03/2019
Location / Chainage : BR-433A Casing Lowered : 24.00 Ending Date : 18/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 54 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 8: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.50
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 17/03/2019
Location / Chainage : BR-433A Casing Lowered : 24.00 Ending Date : 18/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 55 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 9: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.00
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 13/03/2019
Location / Chainage : BR-440 Casing Lowered : 24.00 Ending Date : 14/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 56 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 9: SUMMARY OF TEST RESULTS
Bore No : A1 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.00
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 13/03/2019
Location / Chainage : BR-440 Casing Lowered : 24.00 Ending Date : 14/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 57 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 10: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.20
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 15/03/2019
Location / Chainage : BR-440 Casing Lowered : 24.00 Ending Date : 16/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 58 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
Geotechnical Investigation for proposed major bridges for doubling of Sohawal-Barabanki under Lucknow division of Northern Railway.
APPENDIX "B"
Table 10: SUMMARY OF TEST RESULTS
Bore No : A2 Ground Elevation : Method of drilling :PERCUSSION Depth of Water : 3.20
Diameter of Bore Hole : 150 Bore Retained using : Casing/Bentonite Starting Date : 15/03/2019
Location / Chainage : BR-440 Casing Lowered : 24.00 Ending Date : 16/03/2019
FIELD TEST RESULT LABORATORY TEST RESULT
Shear Strength Consolidation
SPT Test Result Grain Size Analysis Index Property Shrinkage Test on Rock Specimen
Parameters Characteristic
Depth Below NGL (Meter)
Modulus of Elasticity
Cohesion C (kN/m2)
Consolidation Index
Dry Density (gm/cc)
Specific Gravity Gs
Pressure (Kg/cm2)
N1 (Seating Drive)
N3 (Second Drive)
Abrasion Loss(%)
Soil Classification
Core Recovery %
Nature of Sample
Shrinkage Limit
Liquid Limit (%)
N2 (First Drive)
Specific gravity
Swell Pressure
Observed SPT
Type of Test
U.C.S (Mpa)
RL in Meter
Gravel (%)
Void Ratio
Point load
Hardness
R.Q.D %
Clay (%)
Porosity
Silt (%)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 59 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-B
TABLE-11: CHEMICAL TEST ON SOIL SAMPLE
SULPHATE CHLORIDE
BR No. BH.NO. Depth(m) CONTENT CONTENT
VALUE
(%) (%)
361 A1 2.50 0.090 0.02 7.1
361 P2 2.50 0.100 0.01 7.3
373A A1 1.50 0.090 0.02 7.2
373A A2 2.50 0.090 0.02 7.2
375 A1 2.50 0.100 0.01 7.4
375 A2 1.50 0.086 0.02 7.1
433A A1 2.50 0.086 0.01 7.2
433A A2 1.50 0.090 0.01 7.1
440 A1 2.50 0.090 0.02 7.0
440 A2 2.50 0.086 0.02 7.2
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 60 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-1: FIELD BORE LOG CHART BR-361 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 61 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-2: FIELD BORE LOG CHART BR-361 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 62 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-3: FIELD BORE LOG CHART BR-361 (BH-P2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 63 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-4: FIELD BORE LOG CHART BR-361 (BH-P2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 64 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-5: FIELD BORE LOG CHART BR-373A (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 65 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-6: FIELD BORE LOG CHART BR-373 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 66 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-7: FIELD BORE LOG CHART BR-373A (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 67 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-8: FIELD BORE LOG CHART BR-373A (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 68 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-9: FIELD BORE LOG CHART BR-375 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 69 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-10: FIELD BORE LOG CHART BR-375 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 70 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-11: FIELD BORE LOG CHART BR-375 (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 71 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-12: FIELD BORE LOG CHART BR-375 (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 72 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-13: FIELD BORE LOG CHART BR-433A (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 73 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-14: FIELD BORE LOG CHART BR-433A (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 74 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-15: FIELD BORE LOG CHART BR-433A (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 75 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-16: FIELD BORE LOG CHART BR-433A (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 76 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-17: FIELD BORE LOG CHART BR-440 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 77 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-18: FIELD BORE LOG CHART BR-440 (BH-A1)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 78 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-19: FIELD BORE LOG CHART BR-440 (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 79 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-C
CHART-20: FIELD BORE LOG CHART BR-440 (BH-A2)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 80 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-D
PLOT-1: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 81 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-D
PLOT-2: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 82 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX-D
PLOT-3: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 83 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-4: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 84 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-5: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 85 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-6: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 86 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-7: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 87 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-8: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 88 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-9: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 89 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-Pt.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Geotechnical Investigation for proposed major bridges for doubling of Sohawal - Barabanki
under Lucknow division of Northern Railway.
APPENDIX D
PLOT-10: LITHOLOGICAL PLOT
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 90 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 91 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 92 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
A2_BR-375 A2_BR-375
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 93 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 94 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 95 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 96 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 97 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 98 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 99 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
1.20 1.40
1.20
1.00
0.80
0.80
0.60
0.60
0.40
0.40
0.20 0.20
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00
Normal Stress (kg/cm²) Normal Stress (kg/cm²)
1.20
0.80
Shear Stress (kg/cm²)
1.00
0.60 0.80
0.60
0.40
0.40
0.20
0.20
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 0.00 0.50 1.00 1.50 2.00
Normal Stress (kg/cm²)
2.50 3.00
Normal Stress (kg/cm²)
1.20
1.00
Shear Stress (kg/cm²)
Shear Stress (kg/cm²)
1.00
0.80
0.80
0.60
0.60
0.40
0.40
0.20 0.20
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00
Normal Stress (kg/cm²) Normal Stress (kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 100 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
1.20
1.00
Shear Stress (kg/cm²)
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00
Normal Stress (kg/cm²) Normal Stress (kg/cm²)
1.20 1.20
Shear Stress (kg/cm²)
1.00 1.00
0.80 0.80
0.60 0.60
0.40 0.40
0.20 0.20
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00
Normal Stress (kg/cm²) Normal Stress (kg/cm²)
1.00 1.00
Shear Stress (kg/cm²)
0.80 0.80
0.60 0.60
0.40 0.40
0.20 0.20
0.00 0.00
0.00 0.50 1.00 1.50 2.00
Normal Stress (kg/cm²)
2.50 3.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00
Normal Stress (kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 101 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
1.00
0.80
0.80
0.60
0.60
0.40
0.40
0.20 0.20
0.00 0.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00
Normal Stress (kg/cm²) Normal Stress (kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 102 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4
Normal Stress(kg/cm²)
=4.6
BR-373A, BH-A1, DEPTH-2.50 M C= 0.62 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
=8.50
BR-373A, BH-A1, DEPTH-5.00 M
C= 0.97 (kg/cm²)
2
1.8
Shear Stress (kg/cm²)
1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 103 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
=6.8
BR-433A, BH-A1, DEPTH-5.50 M,
C= 0.67 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4
Normal Stress(kg/cm²)
=6.40
BR-433A, BH-A1, DEPTH-8.00 M,TRIAXIAL GRAPH
C= 0.87 (kg/cm²)
1.6
1.4
Shear Stress (kg/cm²)
1.2
1
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4 4.5
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 104 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
=7.7
BR-440, BH-A1, DEPTH-25.0 M
C= 0.012 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5
Normal Stress(kg/cm²)
=7.7
BR-373A, BH-A2, DEPTH-2.50 M C= 0.51 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 105 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
1
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4
Normal Stress(kg/cm²)
=5.9
BR-375, BH-A2, DEPTH-2.50 M C= 0.01 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6 1.8 2
Normal Stress(kg/cm²)
=3.1
BR-433A, BH-A2, DEPTH-2.50 M
C= 0.39 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 106 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3
Normal Stress(kg/cm²)
=7.7
BR-433A, BH-A2, DEPTH-8.00 M
C= 0.52 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
=3.7
BR-433A, BH-A2, DEPTH-11.00 M C= 0.56 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 107 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5
Normal Stress(kg/cm²)
=7.3
BR-440, BH-A2, DEPTH-2.50 M
C= 0.75 (kg/cm²)
1
Shear Stress (kg/cm²)
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4
Normal Stress(kg/cm²)
=7.3
BR-440, BH-A2, DEPTH-2.50 M
C= 0.75 (kg/cm²)
1.4
1.2
Shear Stress (kg/cm²)
1
0.8
0.6
0.4
0.2
0
0 0.5 1 1.5 2 2.5 3 3.5 4
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 108 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
1.6
1.4
1.2
1
0.8
0.6
0.4
0.2
0
0 1 2 3 4 5 6
Normal Stress(kg/cm²)
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 109 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
PHOTO-1: Recovering of UDS at BR-373A, BH-A2, PHOTO-2: Recovering of UDS at BR-373A, BH-A2,
Depth-2.50m Depth-2.50m
PHOTO-3: Recovering of UDS at BR-375, BH-A2, Depth- PHOTO-4: Conducting SPT at BR-375, BH-A2, Depth-
2.50m 3.00m
Branch office: 131, Patparganj Industrial Area, Delhi- 110 092Phone: 011-43519098 Page 110 of 111
TECHPROENGINEERS PVT LTD . . 1737-NR-PT.III_LALLCO.
(AN ISO 9001: 2008 Certified Company)
Revision-R0 Section 3
END OF REPORT