0% found this document useful (0 votes)
68 views2 pages

Mod - RBA-2022-23 Under CAPEX

Uploaded by

Vikas Goel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

Mod - RBA-2022-23 Under CAPEX

Uploaded by

Vikas Goel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
HEADQUARTERS OFFICE /aur4 era BARODA HOUSE /xrher ero } No.44-B/44-16/Genl at fine Deity, Poreidates: 07.03.2023 CAO/C/x.Gate/DLt Sub: Modified Revised Budget Allotment for 2022-23 under Capital Segment of Demand No. 85. Ref: This office letter of even no. dated 16.01.2023, 19.01.2023, 20.01.2023,13.02.2023 & 24.92.2023 In reference to this office letter mentioned above. The following modifications have been carried out i= Revised Budget Allotment for 2022-23 under Capital Segment of Demand No.85 issued vide this office letter under reference cited above (Figures in thousands of Rupees) Execatve | PH] PB | Nomendature | Allocation | RBA-22- | Variation | Modified | Remarks ‘Agency Nos 2 (ote) | 84-22-23 i No. CAOIEIK. | 30] PB | Dii-Palwar ROB I/O | SF 200,00] 19533 | T | RELDy CE Gate/Out | Wo. | Lc no 579-8 | cssemn 400 | | | s cottce TROVE | 30} PS | TKD Paiwal- ca 120000 | 195,99 | 13.99.39" fie no. Ma- Gate/Du No. | Subways 1/0 LC No | ‘SSBCOENG 402 | 567,569,570,571,5 G(eurys 72 (5 Nos) [202 CAOIEIK | 30 | PB | Faizabad-varanas- | SF 75,0000 | -3,00,00 | 12,0000 | Ret-Dy CE Gate/Ou No. | ROB 1/0 LC NO 16 PRION 423 | Ne Babatpur | es eomce CAO/EIK. | 30 | PB | Jenghai - Varanasi-| SF 700,00) 3,00,00| 400,50" fe no. Gates No. | 2lane road. over LKocoeNes 437 | broge ‘at level gma crossing No.24/SpI = TAOTEIK | 30 | PB] ALD-Phaphamau. —|—RRSK | 10,161] 50,00} S6i,1 | Rer-Dy.Cey Gate/Dut No, | 2lane ROB 1/0 e 351 | level crossing No. TUNRLKO" 76-4 near Prayag 's eottice CAOIEIR. | 30 | PB | Rudauli Yard -Road | — RASK EAT | S000 | T,16A7) fe no.n- | Gate/our No. | over bridge in lew LxOCDERS | 382 | of level crossing no. 2maY 143-8 a2 TAOIEIK | 30 | PB | Delhi - Ambala 4] — RASK 298,00) 25000] 4800 Gete/DU No, | lane road over | 457 | bridge in lieu of level crossing No. | 61 at kim 99/23-25 at Konand(pes512/*2 | I (018-19/NR) [COTE |-30|P6| Dein - snatinds | SF 100,00 | “i,00,00 | | Gate/our No. | Road over bridge in | ome | | 883 | fou ievel costing stone No.i0 at km NRCS | | | Bes at —=_= Jind(PB#512/2018- Soe - | 19/NR)_ a CAOIEIR. | 30} 76] Dein: Ambala | SF 7,00,00 | =1,00,00 ] Neuonye Gate/our Wo. | Road over bridge in 450 | teu of level crossing no. 36 Splat km 58/15-17 | ear | Ganaur(P@#512/20 | 16-19/0R) | CAOTEIK | 30 | PB] DLI-UMB Road | RRSK 50,00 | 1,50,00 | 200,00 Gate/Our Wo. | over bridge in tiew 349 | of level crossing | No.49 near Diana 1 (Figures in thousands of Rupees) Executive | PH] PB | Nomendature | Allocation | RBA-22- | Variation [ Modified J” Remarks Agency Now 23 (Voted) | RBA-22-23, iB No, : Fenorere | 30 | PB | Delhi-Ambala - ROB | RRSK 97,00 | 1,00,00 | 1,87,00 Gate/BLI No. | at Babarpur 365 | Kachroli in lieu of level crossing No.58, TROIEIK. | 30 | 1B] Construction of 2 | SF 7,50,00 | 1,00,00 | ~2,90,00 Gate/BLI No. | lanes ROB in lieu of Ref:Dy.CE/ 148 | level crossing No. C/NR/CSB” 44 at km. 73/13-15 ’s eoffice (on Deihi-Ambala file n0.NR- ‘Section near CSBCOENG Samalkha. 4(BUDP)/2 CAOIEIK. | 30 | LB | Construction of 2| SF 7,00,00| 1,00,00| 300,00] /2023 Gate/OLI No. | lanes ROB in lieu of 150 | level crossing No. 47 at km. 79/1-3 ‘on Delhi-Ambala Section near Diwana. CAO/EIK. | 15 | PB | Barabanki-Maihaur- | EBR(IF) | 65,00,00 | -30,00,00 |” 35,00,00 | Ref:Dy.Cé/ Gate/DUI No. | 3rd & 4th line ZHQ/LKO/N 56_| (32.84 km) Rs eoffice CAO/CIK, | 15 | PB | Barabanki-Akbarpur | EBR(IF) | 130,00,00 |~ 30,00,00 |” 160,00,00 | file no.WR- Gate/DLI No. | (161 km) LKOCOENG SL 4/1/2023 CAOIEK. | 16 | PB | Chan Arorian- | DF(3) 37,49 | -3,00,00 T7A8 | ReF-Dy.CEy Gate/DLt No. | Goods _ handl.ine c 112 | with covered goods T/NR/LKO" shed and cement seoffice handling facility file n0.NR- CAOIEIK. | 16 | PB | Prayag Ghat | _DF(3) T] 3,000 | 3,00,01 | LKOCOENG Gate/DU No. | Upgradation as 2(MISC)/ ‘90_| coaching terminal 10/2023 ‘ther consequential changes may be carried out at your end please. gue (DEEPTHI.L) (DY.FA/B8B) FOR FA&CAO/B8B No.44-8/44-16/Genl. Copy to: FA&CAO/C/K.Gate/OLI, 1 Re=ftiNewDelhi, Peatwidated: 07.03.2023 Copyto: Dy.CE/P&D, Sr.AFA/X, AFA/FR, Appr.A/Cs, X, Books & Director Audit. qu (OrePTHILL) (0v.FA/B88) FOR FA&CAO/B8B

You might also like