DOCUMENT NUMBER REVISION
02070-SWC-MEC-DTS-P001AB PAGE 1 OF 9 04
THE PRESENT DOCUMENT OR DRAW ING IS THE PROPERTY OF TECNICAS REUNIDAS AND SHALL NOT, UNDER ANY CIRCUMSTANCES BE TOTALLY OR PARTIALLY, DIRECTLY OR INDIRECTLY, TRANSFERRED,
REPRODUCED, COPIED, DISCLOSED OR USED W ITHOUT ITS PRIOR W RITTEN CONSENT, FOR ANY PURPOSE AND IN ANY W AY OTHER THAN THAT FOR W HICH IT IS SPECIFICALLY FURNISHED OR OUTSIDE THE
EXTENT OF THE AGREED UPON RIGHT OF USE.
PAGE 2 OF 9
JOB NO. 02070 ITEM NO.(S) SWC-P-001-A/B/C/D
REQ / SPEC NO. 020700559 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO. 04 BY P PÉREZ DATE 16/01/17
API 610 10th Ed(ISO 13709) S.I. UNITS
1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
2 FOR PETROPERU S.A. UNIT SEA WATER AND COOLING SYSTEM (SWC)
3
4 SITE PMRT-TALARA, PERU SERVICE SEAWATER PUMPS
4 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
5 DATA SHEETS (6.1.1) REVISIONS
6 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED NO. DATE BY
7 PUMP 04 SWC-P-001-A/B/C/D 1
8 MOTOR 04 SWC-MP-001-A/B/C/D 2
9 GEAR 3
10 TURBINE 4
11 APPLICABLE OVERLAY STANDARD(S): 5
12 OPERATING CONDITIONS (5.1.3) LIQUID (5.1.3)
13 CAPACITY, NORMAL 14110 m3/h RATED 15500 m3/h LIQUID TYPE OR NAME SEA WATER (5)
04 04
14 OTHER HAZARDOUS FLAMMABLE (5.1.5)
15 SUCTION PRESS MAX./NOR. 04 0,98 (VTC) / 0,34 (VTC) kg/cm²(g)
04 MIN. NORMAL MAX.
16 DISCHARGE PRESSURE 8,05 (2) kg/cm²(g) PUMPING TEMP, (°C) 18 20 23
04
17 DIFFERENTIAL PRESSURE
04
9,2 (3) kg/cm² VAP PRESS, kg/cm²(a) 0.028660
04
18 DIFF. HEAD 90,2 (VTC) m NPSHA 12,2 (VTC) m RELATIVE DENSITY (SG): 1.020 1.022
04 04 04
19 PROCESS VARIATIONS (5.1.4) VISCOSITY, (cP) 1.020 1.13
04 04
20 STARTING CONDITIONS (5.1.4) SPECIFIC HEAT, Cp (kJ/kg ºC)
21 SERVICE: CONT. INTERMITTENT (H/Year) CHLORIDE CONCENTRATION (6.5.2.4) 18000 - 22000 PPM
22 PARALLEL OPERATION REQ'D (5.1.13) H2S CONCENTRATION PPM WET(5.2.1.12c)
23 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT Sea Water / Suspended Sand Particles (5.12.1.9)
24 LOCATION: (5.1.30) MATERIALS (5.12.1.1)
25 INDOOR HEATED OUTDOOR UNHEATED ANNEX H CLASS (5.12.1.1) D-2
26 ELECTRICAL AREA CLASSIFICATION (5.1.24 / 6.1.4) MIN DESIGN METAL TEMP (5.12.4.1) 12.8 (°C)
27 ZONE 2 GASGROUP IIC TEMP.CLASS T3 REDUCED HARDNESS MATERIALS REQ'D. (5.12.1.12)
04
28 WINTERIZATION REQ'D TROPICALIZATION REQ'D. BARREL/CASE IMPELLER
29 SITE DATA (5.1.30) CASE/IMPELLER WEAR RINGS
30 ALTITUDE 4.15 m BAROMETER 1.030 kg/cm²(g) SHAFT
31 RANGE OF AMBIENT TEMPS: MIN,/MAX. 12.8 / 36.1 °C DIFFUSERS
32 RELATIVE HUMIDITY: MIN / MAX 80 / 90 %
33 UNUSUAL CONDITIONS: (5.1.30) DUST FUMES PERFORMANCE:
34 OTHER ENVIRONMENTAL CONDITIONS INCLUDE REFINERY, HIGH HUMIDITY, PROPOSAL CURVE NO. RPM
35 MARINE CORROSIVE AND SALTY AIR. IMPELLER DIA. RATED MAX. MIN. mm
36 IMPELLER TYPE
37 DRIVER TYPE RATED POWER (kW) EFFICIENCY (%)
38 INDUCTION MOTOR STEAM TURBINE GEAR MINIMUM CONTINUOUS FLOW:
39 OTHER THERMAL m3/h STABLE m3/h
40 PREFERRED OPER. REGION TO m3/h
41 MOTOR DRIVER (6.1.1 / 6.1.4) ALLOWABLE OPER. REGION TO m3/h
42 MANUFACTURER MAX HEAD @ RATED IMPELLER m
43 (kW) RPM MAX POWER @ RATED IMPELLER kW
44 FRAME ENCLOSURE IP55 NPSHR AT RATED CAPACITY m (5.1.10)
45 HORIZONTAL VERTICAL SERVICE FACTOR MAX SUCTION SPECIFIC SPEED (US Unit) 12000 (5.1.11)
46 VOLTS/PHASE/HERTZ 13200 / 3 / 60 MAX. SOUND PRESS. LEVEL REQ'D 85 @ 1 m (dBA) (5.1.16)
04
47 TYPE Ex nA EST MAX SOUND PRESS. LEVEL (dBA) (5.1.16)
48 MINIMUM STARTING VOLTAGE (6.1.5) 80% EST MAX SOUND POWER LEVEL (dBA) (5.1.16)
49 INSULATION F TEMP. RISE B UTILITY CONDITIONS (5.1.3)
50 FULL LOAD AMPS ELECTRICITY VOLTAGE PHASE HERTZ
51 LOCKED ROTOR AMPS DRIVERS 04 13200 3 60
52 STARTING METHOD DOL / SOFT STARTER 04 HEATING 230 2 04 60
53
54 LUBE
STARTING METHOD OIL SYSTEM VOLTAGE DIP 80% OTHER (6.1.5)
54 BEARINGS (TYPE/NUMBER): STEAM MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.
55 RADIAL SLEEVE / DRIVERS
56 THRUST SLEEVE / HEATING
57 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE
58 UP N DOWN N SUPPLY TEMP. 24 (°C) MAX. RETURN TEMP. 37 (°C)
59 NORM. PRESS. 5.6 kg/cm²(g) DESIGN PRESS. 13.3 kg/cm²(g)
60 MIN. RET. PRESS. 2.5 kg/cm²(g) MAX. ALLOW. D.P. kg/cm²(g)
61 CHLORIDE CONCENTRATION: < 100 (PPM)
PAGE 3 OF 9
JOB NO. 02070 ITEM NO.(S) SWC-P-001-A/B
REQ / SPEC NO. 020700559 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO. 04 BY P PÉREZ DATE 30/12/13
API 610 10th Ed(ISO 13709) S.I. UNITS
1 REMARKS
2 1.- THREE (3) PUMPS OPERATING AND ONE (1) AS SPARE 04
3 2.- DISCHARGE PRESSURE REQUIRED IS GIVEN AT CENTRE LINE OF PUMP DISCHARGE NOZZEL.
4 3.- INDICATED PRESSURE OPERATION FIGURES ARE REFERED AT DISCHARGE FLANGE. VENDOR SHALL DETERMINE TOTAL DIFFERENTIAL HEAD AND DIFFERENTIAL PRESSURE,
5 BASED ON SPECIFIED DISCHARGE AND SUCTION PRESSURE, DIFFERENTIAL LIQUID LEVEL PLUS THE VENDOR'S DROP COLUMN AND DISCHARGE HEAD LOSS. BOWL
6 PERFORMANCE CURVES SHALL BE FURNISHED WITH THE CORRECTION INDICATED
7 4.- MINIMUM SUBMERGENCE TO BE DEFINE BY VENDOR
8 5.- SEA WATER TYPICAL COMPOSITION:
9 PARAMETER UNIT MAXIMUM MINIMUM
10 Conductivity µS/cm 52000 48000
11 Iron ppm Fe 0.4 0.2
12 Copper ppm Cu 0.2 0.05
13 Sodium ppm CaCO3 26000 22000
14 Silica ppm SiO2 2 1
15 Chlorides ppm Cl 22000 18000
16 M-Alkalinity ppm CaCO3 150 10
17
18 6.- NPSHA AT 1ST STAGE IMPELLER SHALL BE CALCULATED BY VENDOR ACCORDING TO THE FINAL PUMP SUMERGENCE AND LLL SET POINT. NPSHR AT 126% OF THE RATED
19 CAPACITY SHALL NOT EXCEED THE NPSHA AT THAT CAPACITY
20 7.- MAXIMUM SHUT-OFF PRESSURE IS 12,6 kg/cm2g.
04
21 GENERAL NOTES:
22 1. OPERATING CONDITIONS
23 - VENDOR TO ADVISE MINIMUM CONTINUOUS CAPACITY.
24 2. SITE DATA / UTILITY CONDITIONS
25 - ENVIRONMENTAL CONDITIONS INCLUDE REFINERY, HIGH HUMIDITY AND SALTY AIR.
26 - PUMP SHALL BE DESIGNED TO OPERATE IN A TOTALLY UNPROTECTED, OUTDOOR ENVIRONMENT.
27 3. MATERIALS
28 - MAXIMUM TEMPERATURE FOR MATERIAL SELECTION: 60 ºC
29 - VENDOR TO CONFIRM BEST MATERIAL SELECTION
30 4. PUMP PERFORMANCE
31 - HEAD RISE TO SHUT-OFF SHALL NOT EXCEED 126% OF SPECIFIED DIFFERENTIAL HEAD AT RATED FLOW WITH BASIN LEVEL AT 9,6M
04
32 - STABLE HEAD/CAPACITY CURVES ARE REQUIRED WITH CONTINUOUSLY RISE TO SHUT OFF.
33 5. ELECTRIC MOTOR REQUIREMENTS
34 - SPACE HEATERS ARE FORESEEN FOR MOTOR POWERS EQUAL OR GREATER THAN 75kW. SPACE HEATER LEADS SHALL BE BROUGHT TO A SEPARATE TERMINAL BOX
35 - SIX WINDING TEMPERATURE DETECTORS (2 PER PHASE) ARE FORESEEN FOR MOTOR POWERS GREATER THA 150 kW. ALL DETECTOR LEADS SHALL BE 3 METALLIC
36 04 ARMORED WIRES AND BROUGHT TO SEPARATE TERMINAL BOX
37 - ONE RDT, DUPLEX TYPE, PER BEARING SHALL BE PROVIDED, TERMINATED IN TEMPERATURE JUNCTION BOXES
38 - ONE THERMOMETER, DIAL TYPE, PER BEARING
39 - TWO SHAFT VIBRATIONS PROBES AND PROXIMITORS EACH RADIAL BEARING SHALL BE PROVIDED, TERMINATED IN VIBRATION JUNCTION BOXES.
40 - ONE KEYPHASOR SHALL BE PROVIDED, TERMINATED IN VIBRATION JUNCTION BOXES.
41 6. PUMP CONSTRUCTION
42 - COUPLING SHALL BE OF THE SPACER, FLEXIBLE TYPE
43 - COUPLING SHALL BE NON-LUB WITH STEEL HUBS. MIN SPACER LENGTH SHALL BE 125 mm.
44 - COUPLING SHALL BE RATED IN ACCORDANCE WITH GP 10-11-01
45 - PUMP VENDOR SHALL HAVE UNIT RESPONSABILITY FOR THE COORDINATION OF DESIGN AND SATISFACTORY MECHANICAL OPERATION OF THE
46 PUMP/ELECTRIC MOTOR TRAIN.
47 - ANY AUXILIARY CONNECTION SHALL BE FLANGED AND VALVED
48 7. SURFACE PREPARATION AND PAINT
49 - THE FINAL COLOUR OF THE EQUIPMENT WILL BE IN ACCORDANCE WITH PLANT STANDARDISED COLOURS AS PER PROJECT SPECIFICATIONS
50 8. MECHANICAL SEAL
51 - MECHANICAL SEAL SHALL BE CONTACTING WET TYPE.
52 - THE FINAL SELECTION OF SEAL SYSTEM AND GUARANTEE OF SEAL PERFORMANCE SHALL BE RESPONSIBILITY OF PUMP/SEAL SUPPLIERS IN
53 ACCORDANCE WITH PURCHASER REQUIREMENTS.
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
PAGE 4 OF 9
JOB NO. 02070 ITEM NO.(S) SWC-P-001-A/B
REQ / SPEC NO. 020700559 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO 04 BY P PÉREZ DATE 30/12/13
API 610 10th Ed(ISO 13709) S.I. UNITS
1 CONSTRUCTION SURFACE PREPARATION AND PAINT
2 ROTATION: (VIEWED FROM COUPLING END) CW CCW MANUFACTURER'S STANDARD OTHER (SEE BELOW)
3 PUMP TYPE: (4.1) SPECIFICATION NO. GP 19-01-01 (SEE NOTE 1)
4 VS1 VS2 VS3 VS4 VS5 VS6 VS7 PUMP:
5 CASING MOUNTING: SUMP COVER PLATE PRIMER
6 INLINE SEPARATE MOUNTING PLATE (8.3.8.3.1) FINISH COAT
7 SEPARATE SOLE PLATE (8.3.8.3.3) BASEPLATE: (6.3.17)
8 CASING SPLIT: PRIMER
9 AXIAL RADIAL FINISH COAT
10 CASING TYPE: DETAILS OF LIFTING DEVICES(6.3.20)
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER SHIPMENT: (7.4.1)
12 CASE PRESSURE RATING: DOMESTIC EXPORT EXPORT BOXING REQUIRED
13 OUTDOOR STORAGE MORE THAN 6 MONTHS
14 MAX ALLOWABLE WORKING PRESSURE kg/cm²(g) SPARE ROTOR ASSEMBLY PACKAGED FOR:
15 @ 60 (°C) HORIZONTAL STORAGE VERTICAL STORAGE
16 HYDROTEST PRESSURE kg/cm²(g) TYPE OF SHIPPING PREPARATION
17 NOZZLE CONNECTIONS: (5.4.2)
18 SIZE FLANGE FAC'G POSITION
19 RATING
20 SUCTION HEATING AND COOLING
21 DISCHARGE HEATING JACKET REQ'D. (5.8.9)
22 BALANCE DRUM COOLING REQ'D.
23 PRESSURE CASING AUX. CONNECTIONS: (5.4.3) COOLING WATER PIPING PLAN (6.5.3.1)
24 NO. SIZE (NPS) TYPE C.W. PIPING:
25 DRAIN PIPE TUBING; FITTINGS
26 VENT C.W. PIPING MATERIALS:
27 WARM-UP S. STEEL C. STEEL GALVANIZED
28 BALANCE/LEAK-OFF COOLING WATER REQUIREMENTS:
29 MACHINED AND STUDDED CONNECTIONS (5.4.3.8) BEARING HOUSING m3/h @ kg/cm²(g)
30 CYLINDRICAL THREADS REQUIRED (5.4.3.3) HEAT EXCHANGER m3/h @ kg/cm²(g)
31 ROTOR: TOTAL COOOLING WATER m3/h @ kg/cm²(g)
32 COMPONENT BALANCE TO ISO 1940 G1.0 (5.9.4.4)
33 SHRINK FIT -LIMITED MOVEMENT IMPELLERS (8.2.2.3) STEAM PIPING TUBING PIPE
34 COUPLINGS:(6.2.2)
35 MANUFACTURER MODEL BEARINGS AND LUBRICATION
36 RATING kW/100 RPM BEARING (TYPE/NUMBER):
37 SPACER LENGTH >125 mm SERVICE FACT. RADIAL /
38 RIGID THRUST /
39 THROUGH COUPLINGS: LUBRICATION (5.11.3, 5.11.4):
40 MANUFACTURER MODEL GREASE FLOOD PURGE OIL MIST
41 RATING (kW/100 RPM) LUBE FLINGER PURE OIL MIST
42 SPACER LENGTH (mm) SERVICE FACTOR CONSTANT LEVEL OILER PREFERENCE (5.10.2.2):
43 RIGID OIL VISC. ISO GRADE
44 COUPLING BALANCED TO ISO 1940-1 G6.3 (6.2.3) REVIEW AND APPROVE THRUST BEARING SIZE
45 COUPLING WITH PROPRIETARY CLAMPING DEVICE (6.2.11) OIL HEATER REQUIRED: STEAM ELECTRIC
46 COUPLING PER ISO 14691(6.2.4)
47 COUPLING PER ISO 10441(6.2.4)
48 COUPLING PER API 671(6.2.4) ASME B15.1
49 NON SPARK COUPLING GUARD (6.2.14.c)
50 COUPLING GUARD STANDARD PER (6.2.14a) INSTRUMENTATION
51 BASEPLATES: ACCELEROMETER (6.4.2.1) 2 ON BEARING HOUSING
52 API BASEPLATE NUMBER (ANNEX D) PROVISION FOR MOUNTING ONLY (5.10.2.11)
53 NON-GROUT CONSTRUCTION (6.3.13) FLAT SURFACE REQ'D (5.10.2.12)
54 OTHER TEMP. GAUGES (WITH THERMOWELLS) (8.1.3.6)
55 MECHANICAL SEAL:(5.8.1) PRESSURE GAUGE TYPE
56 SEE ATTACHED ISO 21049/API 682 DATA SHEET RTD DUPLEX TYPE 1 ON THRUST BEARING
57
58 NOTES: REMARKS:
59 1.- FINAL TOP COLOUR SHALL BE AS FOLLOWS:
60 - PUMPS: GREEN RAL 6019 WEIGHTS
61 - MOTORS: BLUE RAL 5015 WEIGHT OF PUMP/GEARBOX kg
62 - MOUNTING PLATE: GREY RAL 7040 WEIGHT OF BASEPLATE kg
63 WEIGHT OF DRIVER kg
64 TOTAL WEIGHT kg
PAGE 5 OF 9
JOB NO. 02070 ITEM NO.(S) SWC-P-001-A/B
REQ / SPEC NO. 020700559 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO. 04 BY P PÉREZ DATE 30/12/13
API 610 10th Ed(ISO 13709) S.I. UNITS
1 SPARE PARTS (TABLE 18) QA INSPECTION AND TESTING (NOTE 1)
2 START-UP NORMAL MAINTENANCE SHOP INSPECTION (7.1.4) PERFORMANCE CURVE APPROVAL
3 SPECIFY TEST WITH SUBSTITUTE SEAL (7.3.3.2)
4 OTHER PURCHASER REQUIREMENTS TEST (7.3.1.2) NON-WIT WIT OBSERVE
5 COORDINATION MEETING REQUIRED (9.1.3) HYDROSTATIC TEST OF BOWLS
6 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) AND COLUMN (8.3.13.2)
7 MAX RELATIVE DENSITY HYDROSTATIC (7.3.2)
8 MAX DIA. IMPELLERS AND/OR NO OF STAGES PERFORMANCE (7.3.3)(NOTE 3)
9 OPERATION TO TRIP SPEED RETEST ON SEAL LEAKAGE (7.3.3.2d)
10 CONNECTION DESIGN APPROVAL (5.12.3.4) NPSH (7.3.4.2) (NOTE 2)
11 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) COMPLETE UNIT TEST (7.3.4.3)
12 TORSIONAL ANALYSIS REPORT (5.9.2.6) SOUND LEVEL TEST (7.3.4.4)
13 PROGRESS REPORTS (9.3.3) CLEANLINESS PRIOR TO
14 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.3.5) FINAL ASSEMBLY (7.2.2.2)
15 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) NOZZLE LOAD TEST (6.3.6)
16 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) 4 HR. MECHANICAL RUN TEST(7.3.4.7.1)
17 VENT VENT COOLING WATER MECHANICAL RUN UNTIL OIL
18 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) TEMP. STABLE (7.3.4.7.1)
19 FLANGES REQUIRED IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) 4 HR. MECHANICAL RUN AFTER
20 CONNECTION BOLTING PTFE COATING SS OIL TEMP. STABLE (7.3.4.7.3)
21 PAINTED ASTM A153 GALVANIZED TRUE PEAK VELOCITY
22 INSTALLATION LIST IN PROPOSAL (9.2.3L) DATA (7.3.3.4.d)
23 VERTICAL PUMPS RESONANCE TEST (8.3.9.2)
24 PUMP THRUST: (+) UP (-) DOWN PUMP STRUCTURAL RESONANCE TEST (8.3.9.2)
25 AT MIN. FLOW (N) (N) AUXILIARY EQUIPMENT
26 AT RATED FLOW (N) (N) TEST (7.3.4.5)
27 AT MAX. FLOW (N) (N) CHARPY TEST (EN 13445/ASME VIII)
28 MAX THRUST (N) (N) VENDOR KEEP REPAIR AND HT RECORDS (7.2.1.1c)
29 SOLEPLATE REQ'D. (8.3.8.3.3) (m) X (m) VENDOR SUBMIT TEST PROCEDURES (7.3.1.2 / 9.2.5)
30 MOUNTING PLATE REQUIRED (8.3.8.3.1) VENDOR SUBMIT TEST DATA WITHIN 24 HOURS (7.3.3.3e)
31 SOLEPLATE THICKNESS (mm) INCLUDE PLOTTED VIBRATION SPECTRA (5.9.3.3)
32 COLUMN PIPE: FLANGED THREADED RECORD FINAL ASSEMBLY RUNNING CLEARANCES
33 DIAMETER (mm) LENGTH (m) COMPLETION OF INSPECTION CHECK LIST (7.1.6)
34 GUIDE BUSHINGS MATERIAL CERTIFICATION REQUIRED (5.12.1.8)
35 NUMBER CASING IMPELLER SHAFT
36 LINE SHAFT BEARING SPACING (mm) OTHER
37 GUIDE BUSHINGS LUBE: CASTING REPAIR PROCEDURE APPROVAL REQ'D (5.12.2.5)
38 WATER OIL INSPECTION REQUIRED FOR CONNECTION
39 GREASE PUMPAGE WELDS (5.12.3.4) (5.12.1.5)
40 LINESHAFT: OPEN ENCLOSED MAG PARTICLE LIQUID PENETRANT
41 LINE SHAFT DIAMETER: (mm) RADIOGRAPHIC ULTRASONIC
42 TUBE DIAMETER: (mm) INSPECTION REQUIRED FOR CASTINGS (7.2.1.3) (5.12.1.5)
43 LINESHAFT COUPLING: MAG PARTICLE LIQUID PENETRANT
44 LINE SHAFT DIAMETER: SLEEVE & KEY THREADED RADIOGRAPHIC ULTRASONIC
45 SUCTION CAN THICKNESS (mm) HARDNESS TEST REQUIRED (7.2.2.3)
46 LENGTH (m) ADDITIONAL SUBSURFACE EXAMINATION (7.2.1.3)
47 DIAMETER (m) FOR
48 SUCTION STRAINER TYPE METHOD
49 FLOAT & ROD FLOAT SWITCH
50 IMPELLER COLLETS ACCEPTABLE (5.6.3)
51
52 HARDENED SLEEVES UNDER BEARINGS (8.3.10.5)
53 SUMP ARRANGEMENT
54
55 Key
56 1 grade
57 2 low liquid level
58 3 height of discharge termination flange
59 l1 sump depth
60 l2 pump length
61 l3 centreline discharge height
62 l4 height of grade above low liquid level
63 l5 datum elevation, first-stage impeller
64 l6 submergence required
65 φd sump diameter
66 Refer to Hydraulic Institute standards for definitions
67 l1 12.6 m l2 Vendor to define m
68 φd m l6 Vendor to define m
69 l4 8.75 m l3 Vendor to define m
70 l5 Vendor to define m
71
PAGE 6 OF 9
JOB NO. 02070 ITEM NO.(S) SWC-P-001-A/B
REQ / SPEC NO. 020700559 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO. 04 BY P PÉREZ DATE 30/12/13
API 610 10th Ed(ISO 13709) S.I. UNITS
1 NOTES
2 1. REFER TO GP 18-03-04
3 2. If the NPSH required by the pump differs from the specified available NPSH by 3 ft (1.0 m) or less, an NPSH test and witnessed performance
4 test is required.
5 3. Each pump receiving a witnessed performance test shall be dismantled by Manufacturer for inspection by Inspector following the final
6 performance test, inspection shall include bearings and housings
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
PAGE 7 OF 9
JOB NO. 02070 ITEM NO.(S) SWC-P-001-A/B
REQ / SPEC NO. 020700559 /
PURCH ORDER NO. DATE
CENTRIFUGAL PROCESS PUMP DATA SHEET REVISION NO 04 BY P PÉREZ DATE 30/12/13
API 610 10th Ed(ISO 13709) S.I. UNITS
1 APPLICABLE TO: PROPOSALS PURCHASE AS BUILT
2 FOR PETROPERU S.A. UNIT SEA WATER AND COOLING SYSTEM (SWC)
3 SITE PMRT-TALARA, PERU SERVICE SEAWATER PUMPS
4 NOTES: INFORMATION BELOW TO BE COMPLETED: BY PURCHASER BY MANUFACTURER BY MANUFACTURER OR PURCHASER
5 PRESSURE VESSEL DESIGN CODE REFERENCES.
6 THESE REFERENCES MUST BE LISTED BY THE MANUFACTURER
7 CASTING FACTORS USED IN DESIGN( 5.3.4)(TABLE 3)
8 SOURCE OF MATERIAL PROPERTIES
10 WELDING AND REPAIRS (5.12.3)
11 THESE REFERENCES MUST BE LISTED BY THE PURCHASER. (DEFAULT TO TABLE 10 IF NO PURCHASER PREFERENCE IS STATED)
12 ALTERNATE WELDING CODES AND STANDARDS (5.12.3.1)
13 Welding Requirement (Applicable Code or Standard) Purchaser defined Default per Table 10
14 Welder/operator qualification
15 Welding procedure qualification
16 Non-pressure retaining structural welding such as baseplates or supports
17 Magnetic particle or liquid penetrant examination of the plate edges
18 Postweld heat treatment
19 Postweld heat treatment of casing fabrication welds
20
21 MATERIAL INSPECTION (7.2.2.1) (7.2.1.3)
22 THESE REFERENCES MUST BE LISTED BY THE PURCHASER (DEFAULT TO TABLE 13 IF NO PURCHASER PREFERENCE IS STATED)
23 ALTERNATIVE MATERIAL INSPECTIONS AND ACCEPTANCE CRITERIA (SEE TABLE 13)
24 Type of inspection Methods For fabrications Castings
25 Radiography
26 Ultrasonic inspection
27 Magnetic particle inspection
28 Liquid penetrant inspection
29 Hardness inspection
30 REMARKS
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59