WS - QHSE - S05 - Wellsite Operations PDF
WS - QHSE - S05 - Wellsite Operations PDF
Private Services,WS,WSSS,Safety,standard,5,five,location,pressur
IPC,Well
pumping, wellsite, r igup, rig, up , rig-up,qhse e
Legal Information
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55
This work contains the confidential and proprietary trade secrets of Schlumberger
and may not be copied or stored in an information retrieval system, transferred,
used, distributed, translated or retransmitted in any form or by any means,
electronic or mechanical, in whole or in part, without the express written
permission of the copyright owner.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 WS QHSE Standard 05: / Document Control
Document Control
Owner: Well Services Operations Support
Reviewer: InTouch
Contact Information
Name: Well Services Operations Support
LDAP Alias: InTouchSupport.com
Revision History
Version Date Description Prepared by
3.0 12-Jul-2011 5.7.11 units of measure correction, LTO Author: John Schneider
specific items throughout, Approved Supplier
lists in Tables 5-3 and 5-5, add Appendix B
LTO, add Appendix C Twin-Path sling
2.7 16-Dec-2010 5.11.5 Wings to the well rigup: Units Author: John Schneider
(cementing) with threads first must use double
wing as first connection so wings are to the
well for the rest of the rigup
2.6 09-Dec-2010 Hybrid added as approved cement head Author: John Schneider
supplier (DNV). Responsibilities for all
employees changed. Added approved
suppliers for coiled-tubing components
purchased and rental components.
2.511 06-Dec-2010 Responsibilities for all employees changed. Author: John Schneider
Added approved suppliers for coiled-tubing
components purchased and rental
components.
2.51 03-Jun-2010 5.13 clarify low pressure test before final Author: John Schneider
pressure test
2.5 24-May-2010 sections 5.7.1 Job Risk Index 5.9.2.1 for Author: John Schneider
orienting a relief valve output, 5.10.3 3-in
suction hose rate, and 5.13 for pressure
testing the bleed-off assembly. Delete PIM
from Appendix
2.4 17-Dec-2009 Drawings 5.1, 5.4, section 5.7.4.1 for persons Author: John Schneider
in high pressure area during testing, 5.9.2
PRVs for energized fluid jobs, 5.9.2.1 for PRV
installation, 5.11.5.2 Bleed line, 5.13 Pressure
test pass criteria, 5.7.10.2, Burst disc table
5.11.1.1 Table 5–3 update approved supplier
lists, 5.11.4 Table 5–4
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 WS QHSE Standard 05: / Foreword
New releases of this document supersede any other version. The most current
version of the document is in InTouchSupport.
If you have a printed copy, check the "Release Date" against the content in
InTouch to be sure you have the most current version.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
vi WS QHSE Standard 05: / List of Figures vi
List of Figures
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
vii WS QHSE Standard 05: / List of Tables vii
List of Tables
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
5-i WS QHSE Standard 05: / Wellsite Operations 5-i
Wellsite Operations
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-ii WS QHSE Standard 05: / Wellsite Operations 5-ii
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-1 WS QHSE Standard 05: / Wellsite Operations 5-1
5.2 Objective
To prevent injury to Schlumberger and third party personnel and damage to
equipment involved with well site operations, as well as ensuring delivery of the
best service quality possible.
5.3 Scope
This standard applies to all Well Services wellsite operations, and is presented
in addition to any applicable Schlumberger QHSE and Well Services standards
and guidelines.
5.4 Exemptions
Any deviation from a Schlumberger or Well Services Standard is by exemption
only, as outlined in the Schlumberger QHSE Standard S010: Management of
Change and Exemptions, InTouch content ID# 3260269, and the Well Services
Appendix to Standard S010, InTouch content ID# 3999148. Exemptions will be
approved only if both of the following conditions are met:
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-2 WS QHSE Standard 05: / Wellsite Operations 5-2
5.5 Responsibilities
• Compliance with this and other relevant Schlumberger and Well Services
standards
• Personnel involved at all levels have received the appropriate training and
are deemed competent for the job
• Personnel have the necessary resources to allow them to comply with this
standard
• Approved exemptions are in place and documented where a deviation is
needed from this standard or other relevant Schlumberger standards
• Appropriate staffing levels for the job requirements
• License to Operate (LTO) requirements are fully met on all Well Services
operations.
• Knowing and understanding this, and all other, relevant Well Services and
Schlumberger standards
• Designing and selling jobs that conform to this, and all other, relevant Well
Services and Schlumberger standards
• Ensuring the client understands that all jobs must be done in compliance to
Schlumberger and Well Services standards.
• Ensuring that all Well Services employees and contractors at the worksite
are in compliance with this, and other, relevant standards
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-3 WS QHSE Standard 05: / Wellsite Operations 5-3
• Recognizing risks associated with the operation, and reducing these risks to
as low as reasonably possible
• Identifying any potential unplanned changes to the job program at the
wellsite, and initiating the district’s Management of Change procedure
• Taking appropriate action, up to and including terminating the job, if
unacceptable risks exist
• Ensuring that all personnel assigned are competent to drive and/or operate
their assigned equipment
• Ensuring that all Schlumberger relevant equipment at the wellsite is fully
compliant with LTO requirements, and that there are no non-compliant items
anywhere on location.
5.6 Definitions
Term Definition
API approved machine The supplier that has a Certificate of Authority to use the Official
shop API Monogram for API Spec 6A. The Certificate of Authority
contains: the license number i.e. 6A-XXXX, name of the company,
that it meets API Spec 6A, and an expiration date
Bleed off The releasing of pressure from the Well Services treating lines with
the wellhead closed or in the case of cementing or miscellaneous
pumping when the casing or tubing is sealed off
Circulation The movement of pumped fluids into and out of the well through
Well Services treating equipment with minimum entry of reservoir
fluids
Energized fluid Any fluid being pumped which contains or has gas of any type
(such as N2, CO2) injected at any concentration up to and
including 100% gas.
Flowback The return of reservoir fluids with the well and reservoir open
Fluids Any liquid which is to be pumped with a mechanical pump
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-4 WS QHSE Standard 05: / Wellsite Operations 5-4
License to Operate
Third-party equipment
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-5 WS QHSE Standard 05: / Wellsite Operations 5-5
Any third-party supplied equipment shall meet the requirements of Well Services
standards except where noted within this and other Well Services standards. In
general, for pressure-containing equipment, a Certificate of Conformity (CoC)
and evidence of current certification is required.
Wellsite
Perform and document formal shift handovers with sign-offs by the job supervisor.
Perform a review of this JRI with the job supervisor and direct line management
(as a minimum, the engineer in charge or field service manager), preferably
prior to leaving for the wellsite.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-6 WS QHSE Standard 05: / Wellsite Operations 5-6
• Review the JRI and relevant contingency plans and, if applicable, perform
a Job Safety Analysis (JSA) to document any additional hazards and risk
control measures
• Reduce or eliminate any risks to an acceptable level and communicate the
remaining risks to all personnel on location
• Review the JRI and JSA with the crew members, client representative and
involved third parties.
If the remaining risks are deemed unacceptable, the job supervisor has the
authority to postpone or cancel the treatment until the risks are addressed.
• equipment failure
• chemical leaks
• line parting
• procedures in case of accident or emergency
• change in pumping schedule
• change in downhole conditions
• calculating the casing lift pressure for surface and conductor jobs, advising
the client if calculations show casing may be lifted, and ensuring that the
client secures the casing, if required. (Refer to Calculations for Casing,
InTouch content ID# 3963989.)
Prepare the job design in accordance to the specific KSQR. Perform and
document a peer review of the job design before handing over to the job
supervisor.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-7 WS QHSE Standard 05: / Wellsite Operations 5-7
• fire retardant uniforms - long-sleeved Nomex, with the sleeves rolled down
(Dale coveralls must NOT be worn by Well Services personnel due to loss of
fire retardant properties after exposure to certain chemicals.)
• lace-up boots are preferred for better ankle support
• hearing protection
• appropriate additional PPE, depending on the types of fluids or chemicals in
use, according to section 8 of the MSDS
• no jewelry that can get hooked on or caught on equipment, e.g. finger rings,
wrist chains, necklaces, wrist watches with metallic bands, etc.
• no contact lens
• When breathing apparatus (SCBA, dust mask) is required, facial hair must be
groomed to allow proper fit and function.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-8 WS QHSE Standard 05: / Wellsite Operations 5-8
• Hard hats and safety glasses can be removed inside protective cabins such
as the CTU control cab or a FracCAT van.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-9 WS QHSE Standard 05: / Wellsite Operations 5-9
• Never start pumping without the direct instructions or approval of the job
supervisor.
• Never perform any welding on treating equipment that could be installed on
the discharge side of a positive displacement pump.
• Never rent or lend treating equipment to the rig or client without an associated
Well Services operation.
Well Services employees must restrict their activities to those that are directly
related to the performance of the specific Well Services portion of the treatment.
For example, Well Services employees shall not help with the installation of
casing or tubing, racking of pipe or troubleshooting, maintenance or repair of
client wellheads.
Never operate equipment that is not owned or rented by Well Services, except
when contractually obligated, and then only operate equipment that falls within
Well Services core competencies and with appropriate certification.
• The client must be present or must provide written permission before Well
Services personnel operate the wellhead valves, remove part of the wellhead
or release wellhead pressure.
• During the Well Services portion of the well treatment, only the Well Services
job supervisor or an assigned, competent person is permitted to operate
Well Services valves.
• There must be a clear understanding of safety procedures and communication
signals between the Well Services job supervisor and the person operating
the high pressure isolation valves. Two-way radios are the preferred method.
• Shut down any radio frequency (RF) sources, when required, during
perforating operations.
• Any leaks from Well Services equipment must be collected and properly
disposed. This requirement indicates the need to use drip pans or some
equivalent form of containment beneath Well Services equipment.
• Smoking or open flames on location are permitted only in areas assigned
by the job supervisor.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-10 WS QHSE Standard 05: / Wellsite Operations 5-10
• All Well Services containers, boxes, and trash must be removed from the
well site after each job is completed.
• The risks associated with being on top of tanks for the purpose of measuring
fluids must be identified. Each operating location is responsible for
establishing, communicating, and implementing procedures to minimize the
risks.
• The pump operator must be able to see the main treating line pressure or
be able to communicate directly with location personnel that can see the
main treating line pressure.
• Adequate lighting must be provided for any operations at night or in poor
visibility.
• Use of cell phones is permitted only in approved, designated areas.
5.7.7 H2S
If H2S gas is present or if there is a risk of H2S, refer to SLB QHSE Standard
S015: H2S, InTouch content ID# 3260280. All employees must receive training in
the hazards of H2S before working on a location with potential exposure to H2S.
Never use standard service treating equipment when pumping or flowing back
fluids containing any level of H2S. For any level of H2S in the fluid above 0,
only use treating equipment that complies with NACE MR0175 for the sulphide
stress-cracking region.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-11 WS QHSE Standard 05: / Wellsite Operations 5-11
Fluid ends
Mark the working pressure in white, 1 in (2.4cm) letters on the front of the fluid
end.
Cement heads
Mark the working pressure and size in white letters with a minimum height of
1 in (2.4cm).
Paint the indicator bars on the bonnet of the valve a different color from the valve
so that it can clearly be determined whether the valve is in the open or closed
position.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-12 WS QHSE Standard 05: / Wellsite Operations 5-12
For further information regarding burst disc valves, including part numbers, etc.,
refer to The Treating Equipment Manual, Version B, Section 10: Fluid Ends,
InTouch content ID# 3013931, available in InTouchSupport.com.
5.7.10.3 Trailers
Do not use utility or "pup" trailers that are towed using a pintle hook or ball hitch.
Trailers that are pulled with a standard king pin/fifth wheel connection, e.g. frac
pump trailer, cement bulk transport, etc. are acceptable.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-13 WS QHSE Standard 05: / Wellsite Operations 5-13
• Ensure that the required personal protective equipment (PPE) is worn by all.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-14 WS QHSE Standard 05: / Wellsite Operations 5-14
Assign responsibilities between two individuals in the same work area to know
the location of their assigned partner upon arriving at the assembly point.
Make sure each person understands his or her job assignment during placement
and connection of the equipment.
Note
A Wellsite Job Checklist must be used on the job site. The checklist can be
developed locally and, to aid in the development process, a sample checklist is
available for reference in InTouch, content ID# 3313681.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-15 WS QHSE Standard 05: / Wellsite Operations 5-15
Review, and amend as needed, all JSAs and the JRI. Cover any applicable
contingency plans.
Trailer and driving lights must be checked and working before leaving the district
or the wellsite.
Ensure that all pump units have pressure gauges, transducers, over-pressure
shutdowns, and emergency “kill” switches. If faulty, these safety devices must be
repaired before the unit can be sent to perform a job.
Table 5-1: Approved PRV Designs lists the various approved PRV designs for
particular job applications:
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-16 WS QHSE Standard 05: / Wellsite Operations 5-16
• Install the relief valve between the triplex pumps and the main treating line
check valve on all jobs other than those with energized fluids.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-17 WS QHSE Standard 05: / Wellsite Operations 5-17
• Position the outlet of the relief valve such that it cannot cause harm to
personnel, equipment or the environment should the valve be actuated.
Where hazardous fluids are being pumped it is preferable to hard pipe the
outlet to a safe controlled area. Where pumping a non-hazardous fluid or
where the effluent would be gas, position the outlet such that it is above
head height. Ensure that at all times all PRVs are adequately anchored to
prevent rotation.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-18 WS QHSE Standard 05: / Wellsite Operations 5-18
• If the discharge of the PRV needs to be piped to another area, do not use
hoses or other non-standard treating iron (See Figure 5-3). The use of
swivels is not permitted in the discharge line, At no time should a valve be
placed at any point in the discharge line of a PRV
Figure 5-3: Relief valve rig up on location treating line or annulus to pit or tank. (Optional)
• Install an isolation valve between the PRV and the main treating line. Control
this valve remotely on energized or sand-laden fluid jobs.
• Ensure that the PRV is installed in a manner which prevents it from rotating
on the line. This can be accomplished by fixing it to a stand, or securing it
firmly to an immovable object.
• Secure treating lines attached to the discharge of a PRV with stakes or other
competent restraint system.
• Locate the relief valve at a distance that allows the operator safe access to
the main control valve.
• Install the correct size and type of relief valve to relieve the pressure at the
rate at which the job will be pumped. Contact Well Services Operations
Support for details for any particular application.
• Test the pressure relief valve at the same pressure as the treating line before
the job is started.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-19 WS QHSE Standard 05: / Wellsite Operations 5-19
• Test spring operated PRVs before use to make sure that the opening
pressure is correct.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-20 WS QHSE Standard 05: / Wellsite Operations 5-20
• suction hose - 28 in of mercury vacuum (1 bar) and 100 psi (700 kPa)
pressure rating.
• discharge hose - 100 psi. (700 kPa) WP with a 5:1 safety factor.
Use only approved nipples and clamps, as shown in the Treating Equipment
Manual, Version B, InTouch content ID# 3013931. Integral crimped-style hose
connections are acceptable for use.
Do not use suction hoses to pneumatically transfer dry bulk materials. Use the
standard discharge hose, as shown in the Treating Equipment Manual, Version
B, InTouch content ID# 3013931.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-21 WS QHSE Standard 05: / Wellsite Operations 5-21
Use hose covers on all discharge hoses when pumping flammable fluids, acid, or
other hazardous materials. Refer to Well Services QHSE Standard 30: Pumping
Combustible and Flammable Fluids for additional information about pumping
flammable fluids.
Never connect a suction or discharge hose to the discharge side of any positive
displacement pump. If the rig must supply mud or water using a positive
displacement pump, use approved treating iron from the rig pump to the Well
Services unit.
For wash-up purposes, use only hose PN 452694000, which must be held in
place with a chain. See section 5.12.1: General principles for pump priming
(p. 5-46)
Never use canvas or fire hoses to transfer liquids or on any centrifugal or positive
displacement pump.
Prior to every use, perform a visual inspection on suction and discharge hoses.
Ensure that there is no erosion or corrosion that has visibly damaged the inside
the end fittings of the hoses. Do not use hoses that show damage to hose ends
and clamps, or cuts or abrasions that expose wire or woven fabric reinforcement.
Regularly grind off damage to wing lugs as indicated in Well Services QHSE
Standard 23: Testing and Inspection of Treating Equipment, Section 23.8.3.
On well stimulation jobs, ensure there are positive shut off valves on both
ends of each discharge hose. Use only positive shutoff valves that meet the
requirements set out in the Treating Equipment Manual, Version B, InTouch
content ID# 3013931.
When transferring liquids from one tank to another tank, or when circulating a
tank, use the fill line on the receiving tank to discharge fluid. If no permanent fill
line is available on the tank, and when discharging fluid through the top of the
tank, rig up a temporary fill line using standard high-pressure treating equipment.
Secure this line to the tank to ensure it does not move. Ensure that the line
extends close to the bottom of the tank.
Reduce the length of the discharge hose(s) as much as possible to minimize the
potential for cavitation.
• The maximum rate for each 4-in discharge hose is 10 bbl/min (1.6 m3/min).
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-22 WS QHSE Standard 05: / Wellsite Operations 5-22
• For blenders with separate suction pumps, such as the S&S blender or the
open tub E231 style blender, the maximum rate for each 4-in suction hose is
8 bbl/min (1.3 m3/min) or 35 bbl/min (5.6 m3/min) for 8-in suction hose.
• For POD blenders, the maximum rate for each 4-in suction hose is 4 bbl/min
(0.65 m3/min) for each 20-ft (6 m) section, or 20 bbl/min (3.2 m3/min) for
8-in hose.
• For cementing operations, the maximum rate for a 3-in suction hose is 4.5
bbl/min.
• If the pump rate is greater than the parameters listed above, or if the delivery
line is longer than one section (20 ft [6 m]), use more than one parallel line.
It is not possible to tell the difference between a 602 and a 1502 female (thread)
by visual inspection. Before connecting to an unknown 2-in thread half, a use a
Go/No-Go gauge ring to check the OD of the threads (female sub) and therefore
identify quickly if it is a 2-in Fig 602 or a 2-in Fig 1502. The ring will go over the
2-in Fig 602 threads but it will not pass over the 2-in 1502 threads. The FMC part
number is P511389, GO/NO-GO GAUGE: UNION, 2" FIG 602 FEMALE SUB
GO, 2" FIG 1502 FEMALE SUB NO-GO. The Schlumberger part number is
477990000.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-23 WS QHSE Standard 05: / Wellsite Operations 5-23
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-24 WS QHSE Standard 05: / Wellsite Operations 5-24
Description Requirements
Stamp to the body Inlet flange size, pressure rating and ring gasket number (For example
4-1/16” 10,000 PSI BX155)
Outlet flange size, pressure rating and ring gasket number
Product PSL-3
Specification Level
Temperature P+U [-20 degF (-29 degC) to +250 degF (+121 degC)] for non-Arctic
Classification service
L+U [-50 degF (-46 degC) to +250 degF (+121 degC)] for Arctic service
Material Class EE
Pressure testing As per API 6A PSL-3 requirements
Only use high-pressure treating equipment that has been inspected according to
Well Services QHSE Standard 23, InTouch content ID# 3313701.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-25 WS QHSE Standard 05: / Wellsite Operations 5-25
Specialty connections and adapters TOT, FMC FloTREAT, SPM, Wood Machine, Wood
(such as Greyloc or API hub-type Group Jebel Ali, PPC, or NOV ASEP ELMAR, or
connections) contact InTouch.2
Flanged gate valves FMC, WOM, or PPC
Coiled-Tubing Treating Equipment Supplier
Flanged plug valves FMC, SPM, or MSI Dexie Work
1
Equipment manufactured prior to June 2011 by NOV ASEP ELMAR subsidy companies such as KEA and
ASEP may or may not meet the requirements of LTO. To confirm the status, submit the details of the equipment
and available CoC and Material Traceability to InTouch.
2
InTouch must be contacted prior to placing any order with any other supplier. InTouch will provide documented
requirements for a supplier to meet to be considered for approval. Any approved supplier is approved on an
item by item basis, and just because they built an approved item does not make them an approved supplier.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-26 WS QHSE Standard 05: / Wellsite Operations 5-26
A connection that has the unions attached using the NPST method as described
in Section 4, Figure 4-5 of the Treating Equipment Manual, Version B, InTouch
content ID# 3013931.
Threaded connections
The only application where threaded connections are allowed are in standard
pressure cement heads and cement pump truck manifolds manufactured before
the integral manifolds were introduced.
Threaded couplings
The information that follows lists the type of union configurations that are
approved for use in Well Services.
• FMC or SPM 1-in, 1.5-in, 2-in, 3-in, and 4-in 1502 working pressure = 15,000
psi
• FMC or SPM 4-in 1002 working pressure = 10,000 psi
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-27 WS QHSE Standard 05: / Wellsite Operations 5-27
Welded connections
The only approved welded connections are treating components, such as risers
for coiled tubing, flange by flange change-overs, or fabricated standard pressure
cement heads that may have welds made during the manufacturing process.
This manufacturing technique is acceptable if the component can meet the
requirements of Well Services QHSE Standard 23.
Never install an SPM swivel elbow into an FMC triple step elbow – the SPM
male matches up with the FMC female but the load is not sufficiently supported
in all three ball races.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-28 WS QHSE Standard 05: / Wellsite Operations 5-28
As per API Section 10.4.2.4, use a new ring gasket when connecting flanges.
Ensure the ring gasket groove is clean and undamaged before installing the ring
gasket. Never apply grease or oil to a ring gasket. Destroy all used ring gaskets.
Ensure stud, bolt, and nut threads are clean and undamaged. Before connecting
together, apply a small amount of thread lubricant to the threads.
Make up the studs or bolts using an impact wrench and then torque up to the
manufacturer’s specifications using a torque wrench. Combination impact torque
wrenches can be used. Do not use hammer wrenches.
Make up and torque studs, bolts, and nuts in a star pattern, tightening opposite
sides to ensure even load distribution.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-29 WS QHSE Standard 05: / Wellsite Operations 5-29
• All parts are manufactured as per section 22.10.1 of Well Services QHSE
Standard 22: Coiled-Tubing Operations, InTouch content ID# 3313710.
• All parts are marked with the name of the manufacturer.
• All parts are serialized with a unique number that is permanently attached.
• All part must have traceability for the material used in its construction.
• All parts must have current documentation that verifies inspection and
pressure testing to the working pressure. The inspection and testing must
be within the past 12 months. Well Services QHSE Standard 23, InTouch
content ID# 3313701, should be used as a reference when evaluating the
inspection process of the supplier.
In both cases above, the line must have a verifiable working pressure (WP)
rating, e.g. an engineering drawing or a documented pressure test in the last
12 months to the rated WP.
For integral casing, tubing, or drillpipe adapters, never exceed the working
pressure rating of the casing, tubing, or drillpipe thread, as defined by the
manufacturer of the adapter. When pumping CO2, N2, energized, or flammable
fluids, do not exceed 80% of the rated working pressure. Implement additional
mitigation measures when using these types of adapters, such as, torquing up
to the manufacturers specifications, frequent thread verification by a qualified
thread inspection company, etc.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-30 WS QHSE Standard 05: / Wellsite Operations 5-30
Limit any line pipe or 11 ½ V thread to 5,000 psi or the rated working pressure,
whichever is lower. Adequately support these connections to avoid fatigue
failure. Never use these connections for CO2, N2, energized, or flammable fluids.
The Coflexip high pressure hose is used as a substitute for high pressure treating
iron from the pump to the wellhead on all types of jobs.
The Parker Hannifin Black Eagle / Phalcon hose is used as a substitute for
high-pressure treating iron from the pump unit to the connection on the well
(See Figure 5-5).
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-31 WS QHSE Standard 05: / Wellsite Operations 5-31
Do not lay the hose over the edge of the platform or sharp corners (See Figure
5-6). Use conventional iron when going over edges or sharp corners, suspend
the hose, or use some other protective material, such as, a piece of tire.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-32 WS QHSE Standard 05: / Wellsite Operations 5-32
Never impart torque on the hose. Use 3-way swivel joints in the rig up to allow
the hose to rotate freely as shown in Figure 5-7.
Secure each end of the hose to the treating line by attaching the hose
containment grip to an SPM clamp (See Figure 5-8 (p. 5-32)).
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-33 WS QHSE Standard 05: / Wellsite Operations 5-33
In all applications of pressure pumping through a hose, both ends of the hose
must be connected before pumping can start.
Do not pump perforation ball sealers through Parker Hannifin hoses. These
hoses must not be used in conjunction with the dropping of balls, pumping of
diverting agents, or similar diverting operations.
The Parker Hannifin Black Eagle or Phalcon hose is approved for the following
services or fluids.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-34 WS QHSE Standard 05: / Wellsite Operations 5-34
Cementing services
Acid services:
28% HCl and lower concentrations toluene
acetic acid xylene
ethylene mud acid (12-3)
glycol U-66
methanol U-100
Nitrogen or energized fluids can be pumped through this hose only under an
approved exemption.
When transporting the hose, position it on the truck such that the road vibration
will not cause wear to the outer cover.
Return the Parker Hannifin hose to the approved supplier to perform any hose
repair.
The Only approved supplier for the CemSTREAK high-pressure Parker Hannifin
Coalmaster/Ironclad (previously Dayco) hose is Fluid Specialties/Aberdeen
Dynamics.
Cementing services
Acid services:
28% HCl and lower concentrations regular mud acid
A166, A261, and A264 corrosion inhibitors U66 solvent up to 5%
U100 solvent up to 3%
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-35 WS QHSE Standard 05: / Wellsite Operations 5-35
STEM 1
All Parker Hannifin hoses are to be visually inspected after every treatment
• If the polyurethane cover of the hose is damaged and any wire braid is
showing, the hose is to be removed from service immediately. The hose can
be returned to the supplier for repair.
• If the hose body is deformed, flattened, or bent beyond the minimum bend
radius, the hose shall be destroyed or returned to the supplier for repair.
• Inspect the "Containment Grips" on each end of the hose.
If the grips can no longer function to restrict the movement of the hose in the
event an adapter connection were to break, remove the hose from service.
• If there is any bubbling of the polyethylene outer covering, the hose can no
longer be used on any treatments, and must be replaced. This indicates
that the inner liner has been compromised and fluid is being forced through
the wire braiding.
STEM 2
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-36 WS QHSE Standard 05: / Wellsite Operations 5-36
If these rates are exceeded, the treating iron will wear at a faster rate and will
require more frequent inspection to prevent line failure. These rates are based
on a maximum velocity of 45 ft/s (14 m/s).
Refer to Well Services QHSE Standard 09, InTouch content ID# 3313683,
and Well Services QHSE Standard 11, InTouch content ID# 3313684, for the
maximum rates to pump pure N2 and CO2 .
Make sure that treating lines are flexible and can move during the treatment.
Install swivel joints to make a bridge that allows the line to move without stiffness.
Any change in elevation requires a 3-swivel joint configuration using, as a
minimum, one three-way and two two-way swivel joints, as shown in Figure 5-10.
Any change in direction requires a double swivel-joint configuration (bridge)
using, as a minimum, either two two-way swivel joints or one two-way and one
three-way swivel joint, as shown in Figure 5-11. Refer to Figure 5-17 and Figure
5-18 for specifics to rigging up with loops.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-37 WS QHSE Standard 05: / Wellsite Operations 5-37
All treating lines must be supported and stabilized. Do not configure treating
iron in a manner where it cannot be supported. Do not impart side loading or
bending to the treating iron
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-38 WS QHSE Standard 05: / Wellsite Operations 5-38
Although rigging up from a frac pump to a frac manifold usually involves two
elevation changes, this line can be rigged up using at least four swivel joints in
the following configuration: frac pump, 3-way swivel joint, small straight joint,
2-way swivel joint, small straight joint on the ground, 2-way swivel joint, small
straight joint (if necessary to gain height), 2-way swivel joint, frac manifold.
Figure 5-12: Rig up from pumps to common treating line or missile manifold
Use the flapper-type check valve (made by Wood Machine, FMC, or SPM) when
pumping slurries and/or solids.
Use a dart-type check valve when pumping fluids that are free of solids or on all
N2 or CO2 lines.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-39 WS QHSE Standard 05: / Wellsite Operations 5-39
Install a bleed-off assembly in the main treating line on all jobs except
non-foamed cement jobs. Install the bleed-off assembly downstream of the
check valve and as close to the wellhead as possible.
The bleed-off line must have two 2-in x 1-in or 2-in x 2-in valves, followed by a
fixed choke followed by a minimum of at least one joint of standard 1502 straight
pipe that is 4 feet or longer. The 2-in x 1-in valves are preferred as they are
easier to open under pressure. See Figure 5-14.
Do not use an adjustable choke; instead, use only a positive choke nipple. Do
not use anything larger than a 0.5-in (12.7 mm) choke for water-based fluids, and
a 0.25-in (6.4 mm) choke for energized fluids or gases.
Ball injectors must be remote-actuated for all jobs and installed downstream of
the check valve.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-40 WS QHSE Standard 05: / Wellsite Operations 5-40
Never use swivel joints downstream from a choke. If a turn must be made in the
line use a Tee (or lateral) and a blanking plug. The end of the bleed line must
be open-ended.
Figure 5-15: Bleed-off line hookup using Tees, not swivel joints
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-41 WS QHSE Standard 05: / Wellsite Operations 5-41
If the potential exists to return ball sealers to the surface, a ball catcher shall be
installed between the control valve and the choke on the bleed line.
An alternate method to trap ball sealers is to use an additional tee and 2-in x 2-in
valve. If ball sealers equal to or larger than 7/8-in (0.875-in) are used, then 2-in x
2-in valves must be used as the master valve and control valve of the bleed line.
On the downstream diversion side of the ball catcher, there should be a joint of
treating iron (minimum 4 feet) and a valve installed to act as a reservoir to collect
ball sealers. Refer to Section 4: Treating Adapters of the Treating Equipment
Manual, Version B, InTouch, content ID# 3013931, for details on the ball catcher.
Before installing a valve or other treating connections, the job supervisor must
check the working pressure rating of the wellhead valves and fittings or the
drillpipe or tubing connection. If the rating is not marked on the equipment, the
job supervisor must get the information from the client before proceeding. Stop
the rigup and advise the client if the pressure rating of the wellhead is lower
than the expected treating pressure.
Never exceed the working pressure of the wellhead unless a treesaver is used.
Never attempt to make a connection to the top of a wellhead if the master valve
is leaking.
The pressure on the wellhead above the Christmas tree master valve must be
released by the client prior to rig up.
All personnel in the area must be advised that the wellhead or casing is about to
be bled down before the operation is started. All noninvolved personnel must
gather at the muster area during the operation.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-42 WS QHSE Standard 05: / Wellsite Operations 5-42
In the event that gas lift pressure is on the casing side and the client is requiring
Well Services to bleed down and fill the casing with fluid, follow the procedure
defined in WS Standard 05 G01: Procedure to Bleed Gas Lift Pressure, an
attached file to WS QHSE Standard 05, InTouch content ID#3313681.
Well Services personnel can install treating adapters and flanges on the wellhead
without the client on location, if the client wellhead valves are closed and there is
prior authorization from the client to proceed.
Before making the connection to the well head ensure that all threads, ring joint
grooves, and ring joint seal rings are clean and in a usable condition.
There must be a master valve on the well before connecting any other Well
Services equipment. The master valve can be provided either by Well Services
or the client.
<10K psi
One wellhead + SLB ground
Water-based fluid [69,000 kPa]
>10K psi
Two wellhead + SLB ground
[69,000 kPa]
<5K psi
One wellhead + SLB ground
Energized/flammable fluid [34,500 kPa]
>5K psi
Two wellhead + SLB ground
[34,500 kPa]
The master valve on the wellhead is not capable of acting as a pressure control
barrier when a tree saver is in use. Under these conditions, the number of
valves on top of the tree saver is designated by the preceding table. For all
jobs over 10,000 psi (69,000 kPa) using a tree saver, one master valve must
be remote-controlled.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-43 WS QHSE Standard 05: / Wellsite Operations 5-43
Figure 5-16: Wellhead connection for a <10,000 psi water based fluid job
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-44 WS QHSE Standard 05: / Wellsite Operations 5-44
Use an additional swivel joint at the lead off swivel joint if extra flexibility is
required for planned pipe movement (reciprocating, moving drill pipe during
BOP testing, etc).
Figure 5-18: Drilling-rig treating-line rig up with loops and extra swivel
Use the air hoist to lift and support the weight of the treating iron when more
than two loops are suspended from the cement head or drill pipe connection.
The air hoist cable should be attached in a position that takes the weight off the
lead swivel joint but still allows flexibility in the iron rig-up during pipe movement.
Refer to Figure 5-19.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-45 WS QHSE Standard 05: / Wellsite Operations 5-45
Figure 5-19: Drilling-rig treating-line rig up with loops and air hoist
Attach the cement head (or first connection on pumping jobs) to the elevators
with a safety sling as shown in 5.22: Appendix C: Twin-Path brand cement-head
safety sling (p. 5-62). Figure 5-20 below shows the correct method for securing
the cement head and connecting treating pipe.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-46 WS QHSE Standard 05: / Wellsite Operations 5-46
If the client uses a cement head other than a Well Services-provided head,
the responsibility for Well Services for high-pressure connections ends at the
connection to the client-supplied head. Make the client aware of this before Well
Services arrives on location.
Even if the rig crew helps make up the wellhead connection, the Well Services
job supervisor is still responsible for ensuring this is performed correctly.
• Before priming the pumps, make sure that all equipment is connected,
including all monitoring equipment.
• The Well Services job supervisor is the only person who can authorize pump
engines to be started or pumps to be engaged.
• The job supervisor or a designated employee must operate all valves.
• Personnel not required for priming pumps must leave the area near the
high-pressure pumps and treating lines.
• Use radio communication between the pump operators; valve operators, and
supervisors. The only exception is when using pumps with high-pressure
manifolds such as combos and cement pumpers.
• The wellhead master valve must be closed.
• Use water-based fluids to prime the pumps.
• On jobs where oil-base fluids are used, the crude oil or diesel can be used
to prime pumps. If a pump is primed again during the job, the treating fluid
must be used.
• Set the overpressure shutdowns to 1,000 psi (6,900 kPa) after ensuring
that they function correctly.
• Always start the priming in the highest gear and with the engine at idle speed.
• Prime each pump separately, until a steady stream of fluid is observed.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-47 WS QHSE Standard 05: / Wellsite Operations 5-47
Each pump must have a prime up return line. This line can flow to a tank, the
blender, or a pit. Use treating iron or a 2-in 2,500-psi (17,500-kPa) Well Services
hose, Part Number 452694. Never install a valve on the end of the hose. If the
hose enters a tank, the end of the hose must be fastened in position.
If the fluid must circulate back to a frac tank through a line with a butterfly valve,
the valve handle must be secured in the open position. All personnel are to be
made aware that this butterfly valve is not to be closed without the Supervisor’s
permission. Lockout/tagout procedures must be used.
Always perform a low pressure test at 300 psi to 2,000 psi (2,000 kPa to 13,800
kPa) before continuing on to the final test pressure. Take this opportunity to
check for visible leaks.
Never enter the high-pressure area while pumps are in gear. When required to
enter, ensure the pumps are shut down and the pressure has stabilized. Ensure
all personnel are clear of the high-pressure area prior to re-engaging the pumps.
In order to ensure that all components of the treating line (including the bleed-off
assembly) are adequately tested, the following procedure should be followed:
• With the control valve closed and the master valve open, perform a low
pressure test against the control valve, ensure no leaks in the line
• Increase the pressure to the desired test pressure and hold for 1 minute,
observe for any bleed off of pressure (2.5% in 1 minute is acceptable)
• Close the master valve and open the control valve and hold for a further 1
minute, observe for any bleed off of pressure (2.5% in 1 minute is acceptable)
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-48 WS QHSE Standard 05: / Wellsite Operations 5-48
• Close the control valve, open the master valve and bleed off pressure in
controlled manner.
Consider the pressure test successful if one of the following conditions is met:
• The pressure is stabilized and holds steady within +/- 2.5% of the agreed
test pressure, for at least 1 minute.
• The client’s wellsite representative accepts the pressure test results
Use water for pressure tests, except for the following conditions.
• For CO2 or N2 jobs, follow the requirements of Well Services QHSE Standard
09, InTouch content ID# 3313683, and Well Services QHSE Standard 11,
InTouch content ID# 3313684,.
• For oil-based frac jobs, diesel fuel or the frac fluid can be used.
• For drilling rigs with only oil-based mud available, pressure testing can be
done with oil based mud.
Make sure that the pump(s) are primed and all the air is removed from the
system before pressure testing.
Always test the wellhead and client master valve. This test checks the final
connection of the Well Services equipment to the client equipment. If the client
valve does not hold the internal pressure, the client must give approval before
continuing with the treatment. The client approval must be recorded on the
Treatment Report. Never start any treatment if there is an external leak on the
wellhead or connections.
5.14 Shutdown
At the expected end of the pumping operation, slowly reduce the pump rate by
reducing the engine RPM and bringing the pumps to neutral position. Once all
the pumps are stopped, close off the tanks.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-49 WS QHSE Standard 05: / Wellsite Operations 5-49
Note
Do not use the overpressure shut down or emergency kill to stop the units.
Never stand directly over the valves or lines when bleed off operations are taking
place. The bleed off valves must be pointed away from personnel and equipment.
Never leave the valve bar in the valve during the pumping operation.
Use the following procedure to release pressure from the treating line through
the bleed line:
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-50 WS QHSE Standard 05: / Wellsite Operations 5-50
Note
Do not use anything larger than a 1/2-in (12.7 mm) choke for water-based
fluids, and a 1/4-inch (6.4 mm) choke when energized fluids or gases.
• When the pressure is released from the treating line, close the “control
valve,” and then close the “master” valve.
• Open the “control” valve again to release the pressure between the valves.
To prevent well fluids or gases from being accidentally returned to Well Services
equipment when equipment is left rigged up to a client’s well, after the pressure
has been bled off, close the Well Services master valve. Then close all the
discharge valves on the units.
The client is responsible for the control and flowback of reservoir fluids through
their surface production equipment.
Do not flow, circulate, or let any reservoir fluid return from the well into any Well
Services tanks. The only exception is when using the gravel collection vessel.
The operating procedure for the gravel collection vessel is described in section
5.16.3: Use of a gravel collection vessel.
Never perform well testing and flaring with Well Services treating line. Any well
testing or flaring must be done according to testing standards through proper
testing manifolds and surface equipment.
• Flowback through any Well Services line should be limited to surging balls,
forced closure, or release of well pressure after a screen out. Follow the rig
up as per section 5.11.5.2: Main treating line rig up (p. 5-38).
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-51 WS QHSE Standard 05: / Wellsite Operations 5-51
• Limited flow testing of the well immediately after an offshore well stimulation
treatment.
• Limited flow during coiled tubing treatments, in clean out and lifting
operations.
Use standard treating equipment between the wellhead and the tanks or choke.
Follow the requirements in section 5.16.4: Flowback treating iron for any treating
iron installed downstream of a choke.
Follow the same rig-up requirements as for the main treating line, in section
5.11.5: Pump to wellhead rig-up (p. 5-36).
A degasser or the open top of the vessel allows any gas to release into the
atmosphere. The vessel must be connected downwind from any ignition sources.
If other Well Services equipment is installed within 60 feet (20 meters) of the
vessel, install a combustible gas meter on the Well Services pumping unit.
Districts that use a gravel collection vessel must write additional safe operating
procedures for their specific locations.
The flowback treating iron is limited to straight joints, Tees, solid plugs, fixed
chokes, and laterals.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-52 WS QHSE Standard 05: / Wellsite Operations 5-52
The flowback treating iron must comply with section 5.11.1.1: Standard approved
treating equipment (p. 5-23), and be approved and inspected according to Well
Services QHSE Standard 23. A visual inspection must be done after each job.
Paint all flowback treating iron yellow. Use flowback treating iron only for
flowback services. This treating iron can be reused as standard non-flowback
treating iron if it passes Well Services QHSE Standard 23 inspection and is
repainted standard Schlumberger blue.
Store the flowback treating iron in a separate area away from all other treating
iron.
Before performing any work on the treating line, make sure all pressure is
released. All transducers and pressure gauges should show zero pressure and
all OPSDs must be reset to zero.
Before disassembly, flush all treating lines with water to remove corrosive
materials and flammable or combustible fluids. If water is not available, take the
necessary steps to minimize the risks to personnel and the environment.
• Notice the presence of guy lines, stakes, flow lines, and other items
• Inspect the area where you plan to install the equipment. Make sure that the
area is free of equipment, crude oil, flammable, or combustible materials,
other equipment, and other company employees. Check for holes or
obstructions in the area where the equipment will be assembled.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-53 WS QHSE Standard 05: / Wellsite Operations 5-53
• The condition of ladders on the tanks (Make sure the tops of the tanks are
safe and have handrails. Make sure there is no oil, ice, or holes on top of
the tanks.)
• The condition of the cat line, hoisting ropes, cables, and hooks
• Hazards caused by flow lines and tanks
• Any open fires or ignition sources, when combustibles or flammable fluids
are present
• The well cellar, tanks, etc., for the presence of H2S
• Any hazards when moving trucks (Use a land guide when moving any trucks.)
• The wellhead for loose connections or connections not approved by
Schlumberger (Make sure that the working pressure is marked on the
wellhead or can be determined by the client.)
• Any possible risks when you install equipment in the derrick or the wellhead
• The wind direction
• Other supplier’s nitrogen or CO2 equipment and connections
• All unions that are not owned or rented by Schlumberger using the union
thread gauge
• Cranes in the area where Schlumberger equipment or personnel are present
(Never stand under any equipment that is lifted by a crane or hoist)
• The position of electric lines around the rig and across the roads to the
location. Make sure that all personnel know the location of electric lines
in their area
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-54 WS QHSE Standard 05: / Wellsite Operations 5-54
– The ladders and steps on the rig are tight and in good condition.
– The working area and the rig floor is clear and clean.
– There is somewhere to connect the fall protection equipment if
Schlumberger personnel are working at a height above 6 feet (2 meters).
– The rig crew and their work does not create hazards for Schlumberger
personnel.
– Whether or not Schlumberger must move equipment across flow lines
at the location.
– You have procedures ready to fill oilers or fuel equipment during pumping.
– Vehicles are not parked near the rigs. Tubing that falls from the rig can
damage these vehicles. If possible, do not park any Schlumberger
equipment in this area.
– There are no galvanized fittings in any line in which any Schlumberger
equipment is connected. Make sure that other threaded connections are
correct for the pressure in the line.
• Do not use or connect to any equipment that is not rented or owned by Well
Services.
• Review any hazards when working under the rig floor.
• Stop any engines or motors that are not needed for the job.
5.19 References
Table 5-7: Recommended Make-Up Torque for Short Casing Threads
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-55 WS QHSE Standard 05: / Wellsite Operations 5-55
Figure 5-21: Casing threads, Part A. Correct and incorrect installation of a treating adapter if the
casing collar or box end has thread relief. (See the next picture for clarification of thread relief.)
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-56 WS QHSE Standard 05: / Wellsite Operations 5-56
Note
API BRD casing collars will have the thread relief cut on the ID. As a result, thread engagement
will be as shown in Figure 5-22.
If the frac valve has thread relief (picture on the left) there will be no threads left
showing if the wellhead adapter is properly torqued.
If the frac valve does not have thread relief (picture on the right) there will be 5/8
inch of threads showing if the wellhead adapter is properly torqued.
Apdx C 5.22: Appendix C: Twin-Path brand cement-head safety sling (p. 5-62)
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-57 WS QHSE Standard 05: / Wellsite Operations 5-57
The following steps must be taken to reduce the number of iron failures due
to vibration on fracturing operations.
• Maximum rate of 10 bbl/min for each 20-ft section of 4-in discharge hose.
The discharge hose(s) from the blender to the pumps should be as short
as possible. Use additional hoses if the pump rate is greater than the
parameters listed, or if the delivery line is more than 20 ft (6 m)in length.
• Pulsation dampeners:
Monitor the pressure on the suction of the triplex pump. During prime up
it should be 80 psi.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-58 WS QHSE Standard 05: / Wellsite Operations 5-58
Part Number
Choke Part Number
Rate Range (ground
Bore (Missile Trailer)
manifold)
4.5 bbl/min – 10
1.00-in 603360090 597084090
bbl/min
6.25 bbl/min –
1.1-in 100040431 100011560
14 bbl/min
8.5 bbl/min – 20
1.38-in 606004090 601467090
bbl/min
Make sure that treating lines are flexible and can move during the treatment.
Install swivel joints to make a bridge that allows the line to move without
stiffness. Any change in elevation requires a 3 swivel-joint configuration (See
Figure 5-12 (p. 5-38) and Figure 5-16 (p. 5-43). Any change in direction
requires a 2 swivel-joint configuration (bridge).
For high rate jobs, a 4 swivel-joint configuration can be used with this order
of make up.
Personnel that are not required for priming pumps must leave the area near
the high-pressure pumps and treating lines.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-59 WS QHSE Standard 05: / Wellsite Operations 5-59
7. Job Execution
a. Mark the “danger zone” and keep all personnel out of this area while
pumping.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-60 WS QHSE Standard 05: / Wellsite Operations 5-60
• BOPs
• Strippers
• Risers
• Crossovers
• Other equipment used for the containment of pressure on the wellhead
• Cement heads
• Quick couplings
• Swedges
• Pump in subs
• Crossovers
• Other equipment used for the containment of pressure on the wellhead
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-61 WS QHSE Standard 05: / Wellsite Operations 5-61
• Treesavers
• Frac heads
• Pump in subs
• Other equipment used for the containment of pressure on the wellhead
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-62 WS QHSE Standard 05: / Wellsite Operations 5-62
The physical inventory at the location must match exactly the RIMS accounting
for those sources out of the location on jobs or on loan to other locations.
The sling and hook or shackle should be cleaned and inspected before and after
each use. After each use, place it in the bag (Bishop PN: NSSB241018).
Do not allow the sling to be stretched over sharp corners or between the treating
iron and the elevator where it can be damaged.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-63 WS QHSE Standard 05: / Wellsite Operations 5-63
In the event that a cement head comes out of the casing and the sling breaks
the fall, the sling must Not be returned to service without performing a integrity
check through the use of the optical line and checking the mechanical tattle-tale.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-64 WS QHSE Standard 05: / Wellsite Operations 5-64
1. Wrap the Twin Path sling around the cement head between the manifold
nipples as shown in the left side of Figure 5-23
2. Pass the sling through itself, forming a choker.
3. Wrap the free end of the sling around the bail until snug, and then secure
it back to the sling between the head and bail using the special Crosby
hook or shackle.
4. For an alternate solution, take the loose end of the sling to the upper eye of
the elevator bail to take up the slack. Pass the end through the eye and
then hook back to the sling as in step 3. This is shown on the right side of
Figure 5-23.
Figure 5-23: Sling positions on a cement head.. Left: loose end wraps around the
bail, Right: loose end passes through the upper eye of the bail.
5. Clean, inspect and properly store the sling after each use. It is recommended
that the sling be cleaned with soap and water before inspection. A
high-pressure washer may be used. A carrying case is provided with each
sling for storage.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-65 WS QHSE Standard 05: / Wellsite Operations 5-65
1. Inspect the position of the yellow tell-tails. The tell-tails should extend to or
past the black line marked across the sling. If both tell-tails are retracted past
the line or are not visible then remove the sling from service. If the tell-tails
show signs of chemical degradation, then remove the sling from service.
2. Inspect the outer cover for evidence of cutting, tearing, or abrasion. If any
white core yams are exposed, then remove the sling from service. If there are
any cuts on the inner red jacket, then remove the sling for service. Damage to
the cover can indicate load core damage.
3. Inspect the slings for evidence of heat damage. Using the sling in
temperatures beyond -40 degC [-40 degF] to 80 degC [180 degF] requires
manufacturer approval.
4. Evaluate both fiber-optic lights for core integrity. Shine a light into one end of
the fiber and observe the light at the other end. If either fiber fails to transmit
light, then remove the sling from service.
5. Examine the sling for fitting distortion. If there is any distortion, remove the
sling from service.
6. After cleaning and inspection, store the sling in the bag provided by the
manufacturer. Make sure the sling is dry before storing it.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.
Well Services Operations Support\Well Services HSE Manager\InTouch content ID# 3313681\3.0\Release Date:13-Jul-2011\EDMS UID: 1650293660\Produced: 13-Jul-2011 18:30:55 5-66 WS QHSE Standard 05: / Wellsite Operations 5-66
Any sling that is removed from service may be sent back to the manufacturer
for evaluation and possible repair. Any sling that the manufacturer deems is
unrepairable shall not be returned to service.
Private
Copyright © 2011 Schlumberger, Unpublished Work. All rights reserved.