Application of Proprietary Cementitious Fireproofing Minimum Requirement ITP Template - Rev 001

Uploaded by

Adam Farhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Wheatstone Project

LNG Plant
Application of Proprietary Cementitious
Fireproofing
Minimum Requirements ITP Template

0 6-Oct-11 Issue for Construction RP VP KH

A 5-Jul-2011 Issued for Review RP JK KH


REV DATE DESCRIPTION ORIG CHK APPR

IP Security Public Total number of Pages (including Cover sheet): 4


Contractor
For Contract No Contractor Document No Rev.
Contractor
Documents CW695483 25657-000-GFV-GCE-00006 001

COMPANY Project Area Discipline Type Originator Package Sequence-Sht Revision


DOCUMENT
CONTROL NO. WS1 0000 CNS FRM BEC 000 00006-000 0

© Chevron Australia Pty Ltd


APPLICATION OF PROPRIETARY CEMENTITIOUS FIREPROOFING
SUBCONTRACTOR MINIMUM REQUIREMENTS
INSPECTION AND TEST PLAN (ITP)

References

Document Number Title


WS1-0000-FGS-SPC-BEC-000-00102-000
(3PS-NF00-F0002) Specification For Proprietary Cementitious Fireproofing
DISCIPLINE: Civil/Mechanical DESCRIPTION: Describes the proper installation and test procedures for the application of Proprietary Cementitious
Fireproofing

Inspection/Test Reference Method of Verification (see


Documentation/Acceptance Legend) Demonstrated Evidence
Activity Activity
Requirements Criteria Report / Checklist
No. Description Stage / Sub BEC CVX
Test or Inspection Performed Reference No.:
Frequency Code / Spec

1.0 Pre-Work Inspections


1.1 Material Verify material (Pryocrete, lath, mesh, tie In process WS1-0000-FGS-SPC-BEC- H,R S - Material Certifications
wire, studs, pins, caulking) meets project 000-00102-000 Sec 1.3.1, 4.0 Design Approvals
specification.
1.2 Mock-Up Verify Mock-Up. Per Spec WS1-0000-FGS-SPC-BEC- H,I H,I W Mock up
000-00102-000 Sec 5.0
2.0 Pre-Application Inspections
2.1 Surface Preparation Verify anchor touch-up and surface is In Process WS1-0000-FGS-SPC-BEC- I S - Proprietary Cementitious
cleaned free from oil or grease. 000-00102-000, Sec 6.1 & Fireproofing Inspection Report
Verify block-outs for temporary supports 6.3
are correct
Verify all fasteners are correctly tightened
Verify coating/galvanizing of fasteners has
been performed as applicable
Verify dimensional requirements for the
structure are in accordance with drawing.
2.2 Fireproofing Detail Verify proper detail per in process Per Drawing WS1-0000-FGS-SPC-BEC- I S - Proprietary Cementitious
standard drawings 000-00102-000 Sec 3.4 Fireproofing Inspection Report

2.3 Installation of Reinforcement Verify studs or pins properly attached. Random WS1-0000-FGS-SPC-BEC- W,I I - Proprietary Cementitious
Verify lath or mesh is installed properly. In Process 000-00102-000, Sec 4.2.2, Fireproofing Inspection Report
6.3 and 6.4 (10%)
Manufacturer’s Instructions
3.0 Proprietary Cementitious Fireproofing
Application
3.1 Apply Proprietary Cementitious Proprietary Cementitious Fireproofing In Process WS1-0000-FGS-SPC-BEC- H,I W,I - Proprietary Cementitious
Fireproofing applied properly and per the design 000-00102-000, Sec’s 4.0, Fireproofing Inspection Report
drawing. 6.5, 6.8
Verify temperature and humidity are within Manufacturer’s Instructions
tolerance for fireproofing application
3.2 Sampling and Testing Verify 3rd party tester is on site for testing In Process Manufacturer’s Instructions T,I S S 3rd Party Test Report
of Proprietary Cementitious Fireproofing ASTM E 605 Proprietary Cementitious
Verify wet thickness of fireproofing WS1-0000-FGS-SPC-BEC- Fireproofing Inspection Report
Verify density 000-00102-000, Sect. 8.3
ASTM E 605
4.0 Post-Application Inspection
Inspection/Test Reference Method of Verification (see
Documentation/Acceptance Legend) Demonstrated Evidence
Activity Activity
Requirements Criteria Report / Checklist
No. Description Stage / Sub BEC CVX
Test or Inspection Performed Reference No.:
Frequency Code / Spec

4.1 Final Inspection, repairs, and clean-up Inspection for defects and any required In Process WS1-0000-FGS-SPC-BEC- I W,I - Proprietary Cementitious
clean-up. 000-00102-000, Sec 6.8, 8.1, Fireproofing Inspection Report
Verify proper repair and clean-up. 8.3
Verify caulking is properly installed
Verify fireproofing is properly cure
4.2 Concrete Breaks Verify that core samples meet project Per Spec  WS1-0000-FGS-SPC-BEC- R R - 3rd Party Break Report
specifications. 000-00102-000 Sec 4.8, 7.3.2
4.3 Apply Topcoat (if required) Verify seal coat is properly applied In Process Manufacturer’s Instructions W,I S - Proprietary Cementitious
Verify topcoat applied properly. WS1-0000-FGS-SPC-BEC- Fireproofing Inspection Report
000-00102-000 Sec 4.4
4.4 Cementitious Fireproofing Inspection Maintain a Proprietary Cementitious In Process WS1-0000-FGS-SPC-BEC- I R R Proprietary Cementitious
Report Log Fireproofing Inspection Report Log that 000-00102-000 Sec 3.4 Fireproofing Inspection Report
identifies all shotcrete activities and
placements.
Verify documentation is completed as
required.

Legend : I – Inspection; T – Test; W - Witness Inspection Point; H - Mandatory Hold Point For Inspection; R - Document Review; S - Surveillance