0% found this document useful (0 votes)
47 views4 pages

SW FF FQP Pump 003

The document is a field quality plan for firefighting pumps outlining quality control procedures for various stages including material receipt and storage, pre-erection, and installation. It lists activities, responsible parties, acceptance criteria, and record keeping methods. The quality plan covers unloading pumps from trucks, verifying specifications, inspecting for damage, moving pumps to storage, checking document and tool availability prior to installation, and ensuring proper pump base preparation and grouting. The plan provides guidance to help ensure pumps are handled, stored, and installed according to specifications.

Uploaded by

Praba Garan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
47 views4 pages

SW FF FQP Pump 003

The document is a field quality plan for firefighting pumps outlining quality control procedures for various stages including material receipt and storage, pre-erection, and installation. It lists activities, responsible parties, acceptance criteria, and record keeping methods. The quality plan covers unloading pumps from trucks, verifying specifications, inspecting for damage, moving pumps to storage, checking document and tool availability prior to installation, and ensuring proper pump base preparation and grouting. The plan provides guidance to help ensure pumps are handled, stored, and installed according to specifications.

Uploaded by

Praba Garan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

SUPPLIER’S NAME AND ADDRESS:

M/s Sterling & Wilson


FIELD QUALITY PLAN
(An Associate of Shapoorji Pallonji ITEM: FIREFIGHTING - FQP NO.: SW-FF-FQP-PUMP-003
& Co. Pvt. Ltd) PUMP REV. NO.: 00 Project : FEATHERLITE THE
SAI SREYAS KRISHNA, 72, ADDRESS@PALLAVARAM
Poonamalle Rd, DATE:25.02.19
Ekkatuthangal, Chennai
PAGE: 1 OF 4

SL. ACTIVITY AND CHARACTERISTICS / CHK BY S&W JLL/BRIGAD REFERENCE ACCEPTANCE FORMAT OF REMARKS
NO OPERATION INSTRUMENTS S&W QUALITY DOCUMENT NORMS RECORD
1. 2. 3. 4. 5. 6. 7. 8. 9. D* 10.
1. Material Receipt & Unloading of pumps
1.1 Method Statement,
Use proper material handling equipment with
Unloading from truck R,M,H R,A R Manufacturer’s
proper safety precautions
Handling manual
1.2 Material must be
carefully unpacked &
Verification of pump model& Material must be carefully unpacked & check lot Store
R,M,H R,A R check lot received with
specification, Identification received with Delivery Challan / Packing list. Register
Delivery Challan /
Packing list.
1.3
Report for
Reporting of damage/ Missing Delivery challan/ Delivery challan/ Packing list Store
R,M,H R,A R insurance
items Packing list Register
Claim
1.4 Specification, Approved Pump shall be free from debris and damages
drawing/ data sheet,
Pump inspection R,M,H R,A W
Packing list
SUPPLIER’S NAME AND ADDRESS:
M/s Sterling & Wilson
FIELD QUALITY PLAN
(An Associate of Shapoorji Pallonji ITEM: FIREFIGHTING - FQP NO.: SW-FF-FQP-PUMP-003
& Co. Pvt. Ltd) PUMP REV. NO.: 00 Project : FEATHERLITE THE
SAI SREYAS KRISHNA, 72, ADDRESS@PALLAVARAM
Poonamalle Rd, DATE:25.02.19
Ekkatuthangal, Chennai
PAGE: 2 OF 4

SL. ACTIVITY AND CHARACTERISTICS / CHK BY S&W JLL/ REFERENCE ACCEPTANCE FORMAT REMARKS
NO OPERATION INSTRUMENTS S&W QUALITY BRIGD DOCUMENT NORMS OF
RECORD
1. 2. 3. 4. 5. 6. 7. 8. 9. D* 10.
2. Storage of pumps
2. R,M,H R,A R Specification, Method Use proper material handling
1 Movement to warehouse Statement, Manufacturer’s equipment as per manufacturer’s
Handling manual installation manual
2. R,M,H R,A R Specification, Method Pipes should be stored outdoor in a
2 Pump Storage Statement, Manufacturer’s clean and dry place at raised
Handling manual platform to avoid water entry and
damages due to mechanical hit
2. Store Handling R,M,H R,A R Specification, Method Store in a way which avoid direct
3 Statement, Manufacturer’s mechanical hit with sharp objects.
Handling manual pipes shall be stored in locations
away from construction activities
SUPPLIER’S NAME AND ADDRESS:
M/s Sterling & Wilson
FIELD QUALITY PLAN
(An Associate of Shapoorji Pallonji ITEM: FIREFIGHTING - FQP NO.: SW-FF-FQP-PUMP-003
& Co. Pvt. Ltd) PUMP REV. NO.: 00 Project : FEATHERLITE THE
SAI SREYAS KRISHNA, 72, ADDRESS@PALLAVARAM
Poonamalle Rd, DATE:25.02.19
Ekkatuthangal, Chennai
PAGE: 3 OF 4

SL. ACTIVITY CHARACTERISTICS / CHK BY S&W JLL/ REFERENCE ACCEPTANCE FORMAT OF REMARKS
NO AND INSTRUMENTS S&W QUALITY BRIGD DOCUMENT NORMS RECORD
OPERATION
1. 2. 3. 4. 5. 6. 7. 8. 9. D* 10.
3. Pre-Erection
3. R,M,H R,A R Specifications, Approved Ensure availability of Approved
1 Document Availability drawings/ layout, Method Drawing/ Layout, Specifications
Statement
3. Availability of Tools, Equipments R,M,H R,A R Specifications, Method Ensure availability of tools &
2 and Accessories Statement equipment materials before
starting of work
3. Pump required pedestal to be R,M,H R,A R Specifications, Approved Approved drawing/ layout,
3 Check drawing/ layout, Method Specifications
Statement
3. Check for pump base and R,M,H R,A A Specifications, Approved Approved drawing/ layout
4 grouting (anchorfastners)route drawing/ layout, Method
correctness & clearance prior to Statement
pump installation
4. Erection
4. Pump installation: Check for R,M,H R,A A Specifications, Approved Approved drawing/ layout
Installatio
1 proper alignment & location drawing/ layout, Method
n Checklist √
Statement
4. Pump inlet and outlet location R,M,H R,A W Specifications, Approved Approved drawing/ layout
Installatio
2 drawing/ layout, Method
n Checklist √
Statement
4. Level, Alignment of Supports & R,M,H R,A W Specifications, Approved Approved drawing/ layout
Installatio
3 Pipes installed drawing/ layout, Method
n Checklist √
Statement
SUPPLIER’S NAME AND ADDRESS:
M/s Sterling & Wilson
FIELD QUALITY PLAN
(An Associate of Shapoorji Pallonji ITEM: FIREFIGHTING - FQP NO.: SW-FF-FQP-PUMP-003
& Co. Pvt. Ltd) PUMP REV. NO.: 00 Project : FEATHERLITE THE
SAI SREYAS KRISHNA, 72, ADDRESS@PALLAVARAM
Poonamalle Rd, DATE:25.02.19
Ekkatuthangal, Chennai
PAGE: 4 OF 4

SL. ACTIVITY CHARACTERISTICS / CHK S&W JLL/ REFERENCE ACCEPTANCE FORMAT OF REMARKS
NO AND INSTRUMENTS BY QUALITY BRIGAD DOCUMENT NORMS RECORD
OPERATIO S&W
N
1. 2. 3. 4. 5. 6. 7. 8. 9. D* 10.
4.4 Check for motor R,M,H R,A W Specifications, Approved drawing/ Approved drawing/ layout Installation
location/orientation layout, Method Statement Checklist √
4.5 Check for model/flow R,M,H R,A R Specifications, Approved drawing/ Approved drawing/ layout Installation
gpm layout, Method Statement Checklist √
4.7 Check for pump rigidly R,M,H R,A A Specifications, Approved drawing/ Approved drawing/ layout Installation
fixed on the base layout, Method Statement Checklist √
4.8 Protect inlet and outlet R,M,H R,A R Specifications, Approved drawing/ Approved drawing/ layout
Installation
of pump till pipe layout, Method Statement
Checklist √
connection
4.9 Earthing of pump R,M,H R,A R Specifications, Approved drawing/ Approved drawing/ layout Installation √
motor checking layout, Method Statement Checklist
4.10 Testing and R,M,H R,A A Specifications, Approved drawing/ Approved drawing/ layout Installation √
commissioning of layout, Method Statement Checklist
pump/motor
4.11 Checking of motor R,M,H R,A R Specifications, Approved drawing/ Approved drawing/ layout Installation √
direction layout, Method Statement Checklist

INSPECTION POINT (LEGEND) - H: HOLD: (MANDATORY ,DON'T PROCEED WITHOUT PRESENCE OF INSPECTOR)
W: WITNESS: R: REVIEW; M: MONITER A: APPROVE & NA: NOT APPLICABLE