F01
Activity/Task Sitting-up of Air Condition System (Copper Piping And Drain Piping), Start-up / Commissioning
Date July 11, 2022 Company MDC Project UNIQLO Location Sta Rosa, Laguna
Complete the JHA Questionnaire
If a hazardous substances / chemicalis to be used, do you have the MSDS available? NO YES
Equipment & Tools to be used:
Does the task require a permit or other document approval? NO YES Indicate which
Logical Steps in Task Hazard / Unwanted Event What controls are required to manage the hazard?
(What could go wrong,) (Consider Hierarchy of Controls)
Deployment of manpower at work site •Biological hazard (highly contagious COVID-19 disease) • Accomplishing of Health and Travel Declaration Form (HTDF) daily;
• Checking of workers origin (HTDF) against the list of identified COVID-
19 High-Risk areas;
• Ensure that each worker is provided with face mask, vaccination card
shall always with them ready for inspection to health authorities;
• During the trip, only point to point is allowed, no stopping at any point to
prevent from exposure from anybody;
Transporting of contractors personnel using its authorized vehicle to • Biological hazard (highly contagious COVID-19 disease) • Service vehicle should be in good running condition with necessary
the project site and Materials delivery (Contractor Supplied • Transportation accident while traveling to the workplace. common trouble shooting tool kits;
Materials & Local Supplier) •Only authorized driver/personnel shall operate / drive the service vehicle,
with appropriate driver's license;
•Authorized driver is free from any alcohol or prohibited drug intake and
in good mental, health and physical condition;
Document Number – Title Owner Date Approved Revision Status Next Review Date
EHS-PR-12.F01 JHA Form EHS dd/mm/yyyy Rev 00 dd/mm/yyyy
Document Number – Title Owner Date Approved Revision Status Next Review Date
EHS-PR-12.F01 JHA Form EHS dd/mm/yyyy Rev 00 dd/mm/yyyy
Brazing (overhead/above ceiling, side walls) of each copper tubing’s • Falling embers or melted copper parts (Fire, burns, damage of • Wear appropriate PPE’s
up to the required length ready for tapping to outdoor and indoor air- property); • Portable fire suppression equipment (Fire extinguisher) is always
con units; • Electric Shock (burns, death, damage of property); available at hot work area;
• Leak test and flushing of connected copper pipe lines (using • Fall hazard while using ladder and or scaffolds; • Observance of SOP’s in using ladder and or scaffolds:
Nitrogen Gas)
Tapping of Condensate Drain, and Gravity Testing for longer run • Exposure or accidental contact with energized conductors • Awareness of energized conductors, de-energized all possible electrical
(Electrocutions, damage of power tools); system or device/s that will be affected or may affect in the course of
• Fall hazard while using ladder and or scaffolds. operation;
• Observance of SOP’s in the use of ladder and scaffolds.
- Before Commencing task; and
Orientation and sign off by all persons involved in work under this JHA is Mandatory
- If additional hazards and controls have been identified
Name: Signature: Date: Name: Signature: Date:
Document Number – Title Owner Date Approved Revision Status Next Review Date
EHS-PR-12.F01 JHA Form EHS dd/mm/yyyy Rev 00 dd/mm/yyyy