0% found this document useful (0 votes)
264 views2 pages

Moment Connection - Design of Steel Strucuture-Subramanian

Solved Example

Uploaded by

MANOJ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
264 views2 pages

Moment Connection - Design of Steel Strucuture-Subramanian

Solved Example

Uploaded by

MANOJ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
gome example 5.23 Design a bolted end plate connection between an ISMB 300 beam sai an ISHB 200 column, to transfer a vertical factored shear of 120 kN and a sored hogging bending moment of 120 kNm. Use HSFG bolts of diameter 20 a: The connection is as shown in Fig. 5.75. 400 mm. forces * ang moment about the centre of the bottom flange 120 10? + 20 x (300/2 ~ 13.1/2) = (2F, + 2F,) x (300 — 13.1) 122869 + 2Fy x 63.45 = (2F;/286.9) [2 x 286.9? + 63.45*] $69 = 1,175.67F, cures n of Steel StU 420, esis s 51KN FoF, = 1045 ie (63.45/286.9)F = 23.11 KN jon at bottom flange as = 1045 + 104.51 + 23.11) — 20 = 444.26 kN ‘A city of beam flange = (fy%mo eee) = (250/1.1) x 13.1 x 140 x 10 = 416.8 gy This is only 6.2% less than F.. Hence the connection is safe. End plate and bolts Conder the portion of end plate above top flange (assume 10-mm fillet Welds to flange and 180-mm wide end plate) Distance from the centre line of the bolt to the toe of the fillet weld 1,= 40-10 = 30 mm Adopted end distance /, = 50 mm Effective length of end plate per bolt = 180/2 = 90 mm Tension capacity of M20 bolt (Table 5.11) = 141 KN Allowable prying load Q = 141 - 104.51 = 36.49kN Moment at the toe of the weld = Tl, — Ql, = 104.51 x 30 - 36.49 x 50 = 1,310.8 Nm Moment capacity of the plate = (f/1.10)(w77/4) = 27 Therefore, Jt car T= Vbb.3108% 10 1.10% 4725090) = 16mm Adopt T = 20 mm Proof stress = 9.Tfyy = 0.7 x 800/100 = 0.56 kN/mm? 2= UPL) IT. ~ yf PAO) = (3012 x 50)] [104.51 — 2 x LS x 0.56 x 90 x 204427 x 50x30] = 0.3(104,5) — 19.91) = 25.38 KN < 36,49 KN ( ssumed) 2 for non-pre-loade . ee d and y= 1.5 for fac combined shear and pate 1.5 for factored load) (Note: f= 141 kN 00 S14 25.38)/1417 = 0.145 + 0,848 = 0.993 =! : i

You might also like