Gypsum Ceiling

This checklist is for inspecting gypsum ceiling and wall installation. It contains 18 items to check including: 1) Verifying pre-execution of electrical, HVAC, and other works; 2) Ensuring channel and ceiling support designs are proper; 3) Checking tools and materials are available; 4) Examining joint filling and tape application during execution; and 5) Post-execution checks for alignment, undulations, and clearances. The inspector marks Yes, No, or NA columns and notes any observations.

Uploaded by

Quality Control
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
79 views

Gypsum Ceiling

This checklist is for inspecting gypsum ceiling and wall installation. It contains 18 items to check including: 1) Verifying pre-execution of electrical, HVAC, and other works; 2) Ensuring channel and ceiling support designs are proper; 3) Checking tools and materials are available; 4) Examining joint filling and tape application during execution; and 5) Post-execution checks for alignment, undulations, and clearances. The inspector marks Yes, No, or NA columns and notes any observations.

Uploaded by

Quality Control
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CHECKLIST FOR ON-SITE INSPECTION

ACTIVITY: GYPSUM CEILING AND WALL


Doc.No : QC/CIV/SCG/001
Project name
Date/Time
Dwg Ref.No Rev
Floor Signature
S. No Description Yes No NA Remarks

1 Name, date and number of the drawing [ ] [ ] [ ]

PRE-EXECUTION CHECKS

Check for completion of plastering of walls and the above ceiling services
works

A. Electrical

B. HVAC

C. Sprinkler

D. Fire Alarm

E. Public Address

F. Access Control & CCTV

G. Light Fixture Supports (if any)

2 Is the design of the channels plumb and horizontal? [ ] [ ] [ ]

3 In case of ceilings, are sufficient supports in place? [ ] [ ] [ ]

4 Are the openings for doors and windows perfect ? [ ] [ ] [ ]

5 Has proper scaffolding arrangement done with safety measures? [ ] [ ] [ ]

Are the electrical, a/c ducts, fire alarm and access control works
6 [ ] [ ] [ ]
complete?

7 No undulations on the gypsum board [ ] [ ] [ ]

8 Are the required tools available on-site? [ ] [ ] [ ]

9 Are there any specific requirements of the client? [ ] [ ] [ ]

CHECKS DURING EXECUTION

10 Is the fibre tape being fixed during the joint filling ? [ ] [ ] [ ]

11 Is the distance between channels exactly 2 feet ? [ ] [ ] [ ]

12 Is the distance between ceiling supports less than 4 feet? [ ] [ ] [ ]

13 Are the joints between the boards perfect? [ ] [ ] [ ]

14 Is the work being carried out by trained personnel ? [ ] [ ] [ ]

POST-EXECUTION CHECKS

15 Is the alignment perfect ? [ ] [ ] [ ]

16 Are the wall and ceiling surfaces at right angles? [ ] [ ] [ ]

17 Check for undulations [ ] [ ] [ ]

18 Is the distance between the floor and ceiling perfect ? [ ] [ ] [ ]

Observations if any :

Note : The clearance obtained from services works is attached for reference

Contractor/Vendor CG Site Engineer CG QC Engineer

Signature : Signature : Signature :

Name : Name : Name :

Date : Date : Date :