0% found this document useful (0 votes)
108 views4 pages

Specification MTE-F3-20.20-400S-cl.0.05

This document provides the technical specifications for a 3-phase stationary meter test equipment (MTE-F3-20.20-400S-cl.0.05) that can test up to 20 CT operated or whole current electricity meters. Key capabilities include voltage and current outputs with multiple ranges, adjustable phase angle and frequency, and an efficiency of over 85%. It also includes a high accuracy reference standard, mechanical features like 20 meter positions and scanning heads, and software for automated and manual testing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views4 pages

Specification MTE-F3-20.20-400S-cl.0.05

This document provides the technical specifications for a 3-phase stationary meter test equipment (MTE-F3-20.20-400S-cl.0.05) that can test up to 20 CT operated or whole current electricity meters. Key capabilities include voltage and current outputs with multiple ranges, adjustable phase angle and frequency, and an efficiency of over 85%. It also includes a high accuracy reference standard, mechanical features like 20 meter positions and scanning heads, and software for automated and manual testing.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Specification

MTE Meter Test Equipment AG


P.O. Box 7550
Distribution
CH-6302 Zug / Switzerland

Domicile:
Landis + Gyr-Strasse 1
CH-6300 Zug / Switzerland

Phone +41 41 508 39 39


Date Author Phone direct / E-Mail
October 2022 Horst Adams MTE +41 41 508 39 34
[email protected]

Specification 3-phase Stationary


Meter Test Equipment MTE-F3-20.20-400S-cl.0.05

Application
Three phase stationary test system should be designed for testing up to 20 CT operated or whole
current electricity meters.
Technical specification

Power source
Test voltage output 3 x 30 V … 300 V with at least 3 internal ranges
(Phase – Neutral)
Power of the voltage output 3 x 600 VA available at each range
Resolution for voltage 0.01 %
Stability for voltage Better 0.005 % (integration time 150 s)
Resistive load in voltage circuit 0.1 capacitive … 1 … 0 inductive
Voltage deviation from 0 – max. 0.01 %
load
Setting accuracy of the voltage Better 0.05 % related to the range
Distortion factor of the voltage Better 0.5 %; also in case of nonlinear load with crest factor
up to 2
Test current output 3 x 1 mA … 120 A with at least 6 internal ranges
Power of the current output 3 x 600 VA
Resolution for current 0.01 %
Stability for current Better 0.005 % (integration time 150 s)
Resistive load in current circuit 1 … 0.1 inductive
Current deviation from 0 – max. 0.01 %
load
Phase angle 0 … 360
Resolution of the phase angle 0.01
Setting accuracy for phase angle 0.1
Test frequency range 45 Hz … 65 Hz
Resolution of the frequency 0.01 Hz
Page 2 / 4

October 2022
Specification MTE-F3-20.20-400S-cl.0.05

Efficiency of the amplifier to Better 85 %


avoid unnecessary heat
generation

Reference standard
Voltage range 30 V … 300 V
Error for voltage Better 0.05 % (related to the measured value)
Current range 0.003 A … 120 A
Error for current Better 0.05 % (related to the measured value)
Test frequency 45 … 65 Hz
Error for active power/energy Better 0.05 % related to apparent power
Error for reactive power/energy Better 0.05 % related to apparent power
Error for apparent power/energy Better 0.05 %
Error for power factor Better 0.05 % at the final end of range
Nominal frequency of the power More than 20 kHz to avoid any waiting time
proportional output
Measurement modes 4 wire active
4 wire reactive true/cross connected
3 wire active
3 wire reactive true/cross connected 60 / 90
2 wire active/reactive

Mechanics
Material Aluminium profile to avoid corrosion
Number of meter positions Suspension on front and rear side;
10 positions in one row / 20 positions totally
Quick acting connectors For single and three phase meters; (CT operated and whole
current)
+ Continuous current 100 A
+ Max. current for 5 min 120 A
+ Distance between pins should Yes
be variable
+ Connector depth variable Yes
Number of scanning heads 20
Scanning heads Able to detect marks from electromechanical meters and LED`s
from electronic meters
Wave length of LED´s 500 nm … 950 nm
Modulated light up to 8 kHz yes
Scanning head adjustment In height and depth head by head and in depth all together
Type of error display OLED
Number of error displays 20
Resolution of the error displays X.X %, X.XX % or X.XXX % (selectable by software)
Page 3 / 4

October 2022
Specification MTE-F3-20.20-400S-cl.0.05

Showing pulses of reference yes


standard and unit under test

Operation
Personal computer State of the art
Software Automatic test runs in the areas of meter verification,
acceptance and certification
Semi-automatic adjustment test runs.
Archiving and data processing routine
Control and communication programme, working together with
the power source, reference standard and meter error
evaluation system
Customized software configuration, means the operator only
sees, what he needs
Comprehensive, but simple Test Report Mask Generator with
user defined format
Definition of user access rights with defined color profiles
Test Report generator for independent reporting in certification
and sample measurements.
Printouts in pdf, html-, csv-, rtf-Format
Archiving and data processing routine
Data export routines to other applications, e.g. WINDOWS
EXCEL
Routines for saving measurement data, measurement
programmes and report masks in SQL data base with huge
searching functionalities
Control of energy register and maximum demand indicators
Energy register tests for minimum of eight electronic or
mechanical tariffs with different measuring modes
Maximum demand tests for minimum of eight electronic or
mechanical tariffs with different measuring modes
The resulting additional error should be also recorded on the
test certificate.
Start and no-load measurements in both energy directions in
form of an attribute test, pass (+), fail (-)
Meters with identical circuit connection and rating, but differing
constants should be calibrated and tested together.
Manual operation mode
Actual values can be displayed on 2nd monitor
Actual value display showing - Test voltage U1, U2, U3
following values: - Test voltage U12, U23, U31
- 3 test current I1, I2, I3
- Individual active, reactive, apparent power per phase
- Total active, reactive, apparent power of the system
- Frequency
- Phase angle between voltage/current in degrees
Page 4 / 4

October 2022
Specification MTE-F3-20.20-400S-cl.0.05

Accessories/Options
Voltage leads 60 voltage leads with omega clamps
Wireless hand terminal to put in Yes
meter data (Option)
Barcode reader for wireless hand Yes
terminal (Option)
Multi-secondary voltage Yes
transformer MSVT for testing 20
x 1phase meters with closed
links
(Option)
MSVT ratio primary : secondary 1:1
MSVT nominal voltage 220 … 240 V
MSVT accuracy Better 0.1 %
MSVT phase displacement Better 2 min
MSVT output power per winding Min. 20 VA
Isolation current transformer ICT Yes
for testing 20 x 3 phase meters
with closed links (Option)
ICT current range 0.025 … 120 A
ICT ratio primary : secondary 1:1
ICT accuracy Better 0.05 % (0.1…120 A)
ICT phase displacement Better 0.8 min (0.1…120 A)
ICT secondary output power at Min. 60 VA
120 A
ICT gives status information, if Yes
secondary circuit is open or close
by LED and relay output
Generation of type test signals Yes
(such as harmonics, voltage dip,
voltage interruptions, voltage
interruption one cycle, phase
fired waveform, period packets,
etc.) for tests reg. IEC 62052-11
and IEC 62053-11, 21, - 23
Tariff device communication acc. Yes
to IEC 62056-21 Mode C
standard
Incl. 10 IR optical communication
heads
2 pulse inputs for slow and fast Yes
pulses for testing of modern
meters as well as other working
standards

You might also like