Sanitary-Plumbing Checklist (For Building Permit)

This document is a checklist used to evaluate sanitation plans for building projects in Baguio City, Philippines. It contains over 50 criteria across several categories that must be met for compliance, including requirements for sewer lines, water lines, storm drainage, waste disposal, sanitary facilities, and more. Plans must include details like complete connections, proper discharge points, ventilation/riser diagrams, tank/structure details and locations. They must also include scales, readable fonts, standard legends, notes, water demand computations, and signatures of the owner and sanitary engineer.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
271 views2 pages

Sanitary-Plumbing Checklist (For Building Permit)

This document is a checklist used to evaluate sanitation plans for building projects in Baguio City, Philippines. It contains over 50 criteria across several categories that must be met for compliance, including requirements for sewer lines, water lines, storm drainage, waste disposal, sanitary facilities, and more. Plans must include details like complete connections, proper discharge points, ventilation/riser diagrams, tank/structure details and locations. They must also include scales, readable fonts, standard legends, notes, water demand computations, and signatures of the owner and sanitary engineer.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Republic of the Philippines

BUILDINGS AND ARCHITECTURE OFFICE


City Government of Baguio
Tel.No. (074)442-2503 Fax No. (074)443-9239 Website: http//www.baguio.gov.ph
Sanitary/Plumbing: Evaluation Checklist
[ ] Residential
[ ] Commercial, Institutional, Industrial, Recreational
Project Title: ____________________________________Name of Evaluator: _________________________
Project Location ____________________________________Date and Time Received: _________________________
Owner/Authorized ____________________________________
Representative:
Date Time Forwarded to
1st routing:
2nd routing:
3rd routing:
Yes – Complied 4th routing:
5th routing:
No – Not Complied

Building Permit : RULE 3 SECTION 302.9 of PD 1096, Civil Code,


Remarks
Sanitation Code of the Phil., and Environmental Code
Yes No On Sanitary Plans and Technical Specifications
[ ] [ ] Scale 1:100m
[ ] [ ] Readable Fonts and Texts
[ ] [ ] Standard Legends and symbols
[ ] [ ] General Notes and/or Specifications
Sewer line Layout
[ ] [ ] Complete sewer line connections
[ ] [ ] Proper discharge point/area
[ ] [ ] Isometric diagram
[ ] [ ] Ventilation system
Waterline Layout
[ ] [ ] Complete cold waterline connection
[ ] [ ] Complete hot waterline connection, if applicable
[ ] [ ] Riser Diagram
[ ] [ ] Isometric diagram
[ ] [ ] Source of water supply
[ ] [ ] Water tank details and location
Storm/Drainage Line
[ ] [ ] Adequate storm drainage plan
[ ] [ ] Manhole/Junction/Catch Basin Location and Details
[ ] [ ] Proper discharge point/area
Waste Disposal System
[ ] [ ] To Utilize Septic Tank
[ ] [ ] Minimum of three chambers septic tank
[ ] [ ] Adequate construction of septic tank
[ ] [ ] Septic Tank Location and Details
[ ] [ ] To Connect to City Sewerage System, if applicable
[ ] [ ] To Provide Sewage Treatment Plan (STP)
[ ] [ ] STP Details and Location
Sanitary Facilities ( commercial, institutional, industrial, recreational )
[ ] [ ] To provide Materials Recovery Facility (MRF)
[ ] [ ] Required number of cubicles, minimum of 3
[ ] [ ] MRF Location and details
[ ] [ ] To provide rainwater harvesting facility
[ ] [ ] Location and Details
Comfort Rooms/Toilet Facilities/Washing Areas
[ ] [ ] Required number of fixtures (as to PD 856 Reqt.)
Other requirements:
[ ] [ ] Oil/Grease Separator Chamber Details and Location
[ ] [ ] Grease Trap
[ ] [ ] Material Size and Type
[ ] [ ] Water Demand computation
[ ] [ ] Wastewater Generation Computation
[ ] [ ] Signature and seal by the Sanitary Engineer
Master Plumber valid for 20 units max. only
[ ] [ ] Signature of owner to all Sanitary/Plumbing plans and forms
[ ] [ ] other requirements refer to PD 1096 (specify)