LVDH Operation

This document provides the standard operating procedure for operating the Low Vacuum Dehydrator (LVDH) to dehydrate oil from the Main Oil Tank at Vedanta Limited's Lanjigarh plant. It outlines 12 steps for starting up and operating the LVDH, including ensuring proper connections, opening valves, starting the machine, and shutting it down. It also provides requirements for quality control, occupational health and safety, and maintaining records of the LVDH operations. The document was originally issued in 2015 and recently revised in 2020 to update company logos and add an amendment table.

Uploaded by

Subrahmanyam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
144 views2 pages

LVDH Operation

This document provides the standard operating procedure for operating the Low Vacuum Dehydrator (LVDH) to dehydrate oil from the Main Oil Tank at Vedanta Limited's Lanjigarh plant. It outlines 12 steps for starting up and operating the LVDH, including ensuring proper connections, opening valves, starting the machine, and shutting it down. It also provides requirements for quality control, occupational health and safety, and maintaining records of the LVDH operations. The document was originally issued in 2015 and recently revised in 2020 to update company logos and add an amendment table.

Uploaded by

Subrahmanyam
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

VEDANTA LIMITED, LANJIGARH

Integrated Management System


SOP description: LVDH OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 116 Revision No: 01
Plant 26.12.2020

1. PURPOSE: Oil dehydrating from MOT by running LVDH.


2. SCOPE: All three units
3. RESPONSIBILITY: Desk Engineer
4. DURATION: 5 hr

5. OUTPUT: Oil dehydrating from MOT by running LVDH.

6. PROCEDURE:

6.1 Ensure that there is no PTW on Low Vacuum Dehydrator (LVDH).


6.2 Ensure that the suction and discharge pipes are connected properly to the oil tank.
6.3 Ensure that the oil inlet valves & suction valve to Vacuum Pump are in open condition.
6.4 Ensure that the suction valve of Discharge pump is in open condition.
6.5 Ensure that the valves at condensate pot are closed.
6.6 Open the discharge valve & switch on the MCB to start the machine.
6.7 While switching off the machine at first switch off the MCB.
6.8 Close the suction valve of vacuum pump.
6.9 Release the vacuum by opening the ball valve for manual vacuum release on condensate pot.
6.10 Close the valve after release of vacuum Pressure.
6.11 Check the vacuum pump oil is clear. If it is milky, replace it by ENKLO-150 Or VM-4.
6.12 The machine is meant to run continuously.
6.13 Centrifuge need not be kept in running condition.

7. QUALITY

7.1. All the parameters, activities are maintained as per the manual.
7.2. Any deviation is recorded and corrective action is taken accordingly.

8. ENVIRONMENT: Not applicable

9. OHSAS:

9.1 Persons deployed on the work must use safety helmets, shoes, goggles, dust masks & hand gloves.
9.2 Before starting of any operation, ensure all standard clearance from main control room and
shift in charge.
9.3 Ensure deployment of a group of people (2 or more) while carrying out job in an isolated or deserted place in
night shift.

10. ENERGY:
11. RECORDS: VL/CPP/OPER/FILE/05

Prepared by :Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation :04.05.2015 Approved By: Susheem Behera Date of review :26.12.2020
VEDANTA LIMITED, LANJIGARH
Integrated Management System
SOP description: LVDH OPERATION
Department: Power Revision Date:
Version No: 03 SOP No: VL/2201/OPER/WI- 116 Revision No: 01
Plant 26.12.2020

12. Amendment Table:

Sl No. Description Amendment done Revision date

Document Revision History


VERSION REVISION
DATE CHANGE SUMMARY
NUMBER NUMBER
Version changed:
1. Company name changed(VAL- SSL)
11.09.2013 01 00
2. Indication of Abbreviations, Details of document at the
footer
Version changed:
00
Document format changed.
07.06.2014 02
Content Addition: Equipment safety, Bibliography, Man power
01
required.

Version Changed:
10.05.2015 03 00 1. Company name changed from SSL to Vedanta Limited
2. Company logo changed.

1. Content Addition: Amendment table added.


26.12.2020 03 01
2. Company Logo changed.

Prepared by :Avishek Moitra Revised By : Chaitanya Anand Date of Issue : 10.05.2015


Date of preparation :04.05.2015 Approved By: Susheem Behera Date of review :26.12.2020