Scheme 25 New Booklet PDF
Scheme 25 New Booklet PDF
B) O n l y f or e-Auction:
        Online e-Auction:
        Start Date & time: 26.04.2022 at 11:00 Hrs.            End Date & time: 26.04.2022 at 18:00 Hrs.
        C) Result Opening:
        Result Opening Date & time: 27.04.2022 at 15:00 Hrs.
Step 2: Login with user credentials and Verify OTP sent to registered email id and
mobile number for secure Login.
Step 4: Pay e-Tender cum e-Auction Processing fee of Rs. 1000 + Applicable GST Non-
Refundable through online mode.
Step 5: Pay e-Tender cum e-Auction EMD Amount through online mode.
Bidders can withdraw or withdraw and resubmit their revised “CLOSE BID”. This
functionality is available to the bidders on the Final Submission Page.
Note: Bidders are only allowed to use the withdrawal or withdrawal and resubmission of
Close BID functionality only once. Once it is used, the same functionality won’t be
available again under any circumstances and request for withdrawal of bid and EMD
refund will not be entertained.
Step 7: Conduct of e-Auction/ Online auction:
As per time schedule, bidder shall participate in e-Auction by logging in the website.
Please note that no time extension will be given after closing time. During e-Auction
every bidder can bid in multiple of Rs. 1000-/ per sq mtr only.
b)   The purpose of this BID document is to provide interested parties with information and
     to select the highest bidders for advertised plots through e-Tender cum e-Auction
     process.
c)   CIDCO may in its absolute discretion, but without being under any obligation to do
     so, update, amend or supplement the information, its assessment or assumptions
     contained in this BID document. Such changes shall be intimated to all the Bidders.
     In case additional period for submission, if required due to such amendments, is
     necessitated the same shall be intimated to all the Bidders.
d)   The issue of this BID document does not imply that CIDCO is bound to allot the said
     Plots to the Bidder and it reserves the right to reject all or any of the Bids without
     assigning any reasons in respect thereof.
e)   CIDCO reserves the right not to proceed with the Bidding Process as per time table
     without liability or to reject/cancel any or all plot/Bid(s) without assigning any reasons
     in respectthereof.
f)   The Complete e-Tender cum e-Auction bidding process is online. Bidders shall submit
     CLOSE BID (e-Tender). Then, bidder shall participate in e-Auction/ online bidding as
     per prescribed time schedule.
g)   The payment for e-Tender cum e-Auction processing fee is Rs. 1000 + Applicable
     GST Non-Refundable (One Thousand Plus Applicable GST) & Earnest Money
     Deposit (EMD) shall be paid online separately for every bid.
h)   Allotment of the Plot will be made in accordance with the provision of NMDL (A) R
     2008 and as may be amended from time to time.
i)   Bank Information: Bidder shall submit information of Bank Account Number, Bank
     Name, Branch Name, Bank MICR / IFSC Number and upload scanned copy of
     cancelled cheque. The cancelled cheque and information furnished shall match with
     each other.
j)   Kindly note that, Bidders cannot apply for e-Tender cum e-auction from other’s bank
     account. Also, if it is found that same bank account number is provided by different
     bidders during registration, then both the bids shall be treated as cancelled. NRI
     Account holder cannot apply for E- tender cum E- auction.
k)   The Bidder can bid for one or more Plots advertised by submitting separate bid with
     the amount of requisite processing fee and Earnest Money Deposit (EMD) in the form
     of Online Payment.
4)   The EMD deposited by bidder shall be forfeited by CIDCO, if the bidder decides to
     withdraw at any time after the opening of bid or refuses or otherwise fails to accept the
     allotment or after being allotted the Plot, commits a breach of any of the relevant
     terms and conditions under which the Residential Plot is offered.
5)   The Bid once made shall remain valid for acceptance by the Corporation for period of
     90 days from the last date of receipt of the Bid and it cannot be revoked or varied by
     the bidder. No charge back cases shall be entertained/considered for any
     reason. The EMD will be refunded to un-successful bidders without any interest only
     after the completion of e-Auction activity. EMD refund request made before completion
     of e-Auction will not be considered. The EMD will not be adjusted against any other
     scheme.
6)   In case if number of bids received for any particular Plot is less than three, then
     the final decision on such allotment will be taken by the Corporation and the
     same shall be binding on concerned bidders. These offers may either be
     accepted or rejected and until final decision is taken, the EMD amount of these
     bidders will not be refunded. Corporation reserves the right to cancel, amend,
     revoke, modify the conditions of the scheme at its discretion or reject any or
     all offers/plots without assigning any reasons thereof. In case of cancellationof
     the plot/scheme, bidder will not have any say.
7)   The Bid must be made by filling complete information prescribed in the Registration form.
     Any bid with incomplete or wrong information, insufficient supporting documents and/or
     insufficient requisite amount of EMD stands rejected.
8)   The Bidders should upload scanned copies of required documents in PDF format for
     verification within the time schedule only. The online application form and uploaded
     documents of bidders will be then scrutinized by CIDCO. Incomplete applications will be
     rejected fore with and no explanation / request will be considered in this matter.
9)   After prescribed period no bid will be accepted / considered for e-tender cum e-
     auction. The decision of the Corporation on approval of bidder for participation shall be
     final and binding.
10) Kindly note that the Corporation reserves the right to extend the date & time for the
     e-tender cum e-auction.
13) The Vice Chairman and Managing Director, CIDCO reserves all rights to reject/cancel
     any or all bids/plots without assigning any reason thereof.
14) All the Notifications, Corrigendum, Information etc and the detailed terms & conditions
     regarding e-tender cum e-Auction hereafter will be published online on website.
15) The Allotment Letter will be issued to successful bidders after approval of Vice
     Chairman and Managing Director.
16) Agreed amount of Sale price of the Plots, after adjusting the Earnest Money Deposit
     (EMD), shall be payable in Two equal installments as prescribed in the Allotment
     letter.
17) Prescribed time limit for payment is the essence of the contract and failure to observe
     the same shall render the allotment liable for cancellation with forfeiture of the Earnest
     Money Deposit in full. In addition to the Earnest Money Deposit, 25% of Installment/sof
     lease premium paid by the Plot allottee shall also stand forfeited to the Corporation and
     the Corporation shall further have the right to claim compensation for damage or loss, if
     any, suffered in consequences of default.
18) The Managing Director may, in deserving cases extend the period determined in the
     Scheme for payment of installments not exceeding 03 months for 1st installment and
     10 months for 2nd installment on receipt of delayed payment charges at the rate as
     may be fixed by the Corporation by a general or specific order. The decision of
     Managing Director in this regard will be final and binding on the allottee. The allottee
     should apply for grant of extension in the time limit before expiry of due date for that
     installment. In the event of default in a payment on due date as per allotment letter
     without written application and subsequent approval of the Managing Director, the
     allotment of Plot shall be deemed to be cancelled. Allottee shall note that unless the
     payment for the first installment is made, the time extension for payment of second
     installment shall not be granted and request applications for the same will not be
     entertained at any cost. The present rates of interest for delayed payment of
     installments is 8.40% per annum. The above rates are subject to change without notice.
19) The No Objection Certificate for obtaining Bank loan will be issued to successful
     bidders after making 1st installment of Lease Premium, as per request application
     for the same from successful bidder.
20) If successful bidder's quoted amount is above Rs. 50.00 lakhs, then the bidder will be
      required to pay applicable rate of TDS to Income Tax Department, Government of
      India.
21)   The possession of the Plot shall be given only on receipt of payments in full in
      accordance with the mode of payment prescribed.
22) All the necessary Permission, Licenses, Sanctions, etc. for carrying out construction of
      the Plot have to be obtained by the allottee himself. It shall be the responsibility of bidder
      to enquire with the concerned Govt./Local authorities for the same.
23) Site inspection: The bidder is advised to visit the site and inspect the status of the
      Plot before making any offer. Allotment of the Plot shall be on "As is where Basis is"
      and possession will be handed over in the same condition.
24) The letter communicating the acceptance of offer by the Corporation in respect of the
    Plot (i.e. allotment letter) shall be mailed on registered e-mailed id of the offeror/
    bidder given in the offer. The letter mailed to the applicants e-mail id must be deemed
    to have been receivedby the offeror / bidder. The offeror / bidder will have no claims
    of any sort for delay/refusal once allotment letter is issued to the offeror/ bidder.
27) Acceptance of offer: The acceptance of a Bid is at the sole discretion of the
      Corporation.
28) Risk Factors: The Corporation reserves the right to amend, revoke, modify the conditions
      of the scheme at its discretion or reject/cancel any or all offers/plots without assigning
      any reasons thereof. In case of cancellation of the scheme, the bidder will not have any
      say.
29) The sale price offered by the bidder shall be exclusive of the following.
       a. Goods and services tax (GST)
       b. Municipal Taxes
       c. Insurance Premium
      d. Stamp Duty & Registration charges as decided by concerned Dept.
      e. Lease Rent
      f. Charges such as Security Deposit for Electric Meters, license fees, permit Fees
         etc. Any other charges which may be applicable as per Govt./ CIDCO/ Municipal
         Corporation rules. The above mentioned charges will be liability of the successful
         Bidder.
      g. Water distribution betterment charges, Documentation charges, Power supply
         development charges, Fencing charges & other applicable charges.
30)    If any litigation occurs OR pending or new litigation arises OR any previous allotment
       is pointed out after e-auction then, after necessary verification decision will be taken,
       which shall be binding on the bidder.
31)    The bidder shall not take any benefit of grammatical or printing mistakes, which
       may have occurred.
a. The maximum permissible FSI shall be as per the approved Unified Development
 Control & Promotion Regulations for Maharashtra State as approved by the GoM
 dated 02/12/2020.
b. For change of use of the plot, prevailing policy of the corporation and UDCPR is
 applicable.
c. The FSI shall be as specified in Annexure-I.
d. The building shall be constructed for the prescribed use as per the Annexure-I and as
 specified in Unified Development Control & Promotion Regulations forMaharashtra
 State as approved by the GoM dated 02/12/2020.
e. The minimum and maximum percentage of the use shall be as specified in Unified
 Development Control & Promotion Regulations for Maharashtra State as approved
 by the GoM dated 02/12/2020.
f. The allottee shall comply with all provisions as specified in Unified Development
 Control & Promotion Regulations for Maharashtra State as approved by the GoM
 dated 02/12/2020 including the parking standards without seeking relaxation of any
 kind in DCRs.
g. The restriction of height of buildings/ structures shall be observed as per the Ob stacle
 Limitation Surface Map (OLS Map) for Navi Mumbai International Airport as given in
 the sanctioned DCRs of the respective Planning Authority.
h. The NOC of Airport Authority in respect of the Height restrictions will be required to
 be obtained by the successful bidder/allottee before the start of construction as
 applicable.
i. The NOC from Railway Authority for development on the plot, if required, shall be
 obtained before local authority grants permission for Development.
j. The respective DCRs at the time of submission of development proposal to the
 competent authority shall be applicable in addition to the above condition.
k. The allottee/intending lessee shall provide necessary infrastructure including Electric
 Sub-Station for Electric supply as per the requirement of MSEDCL within the plot, if
  necessary.
l. All other terms and condition mention in the allotment letter shall also be part of the
  Lease Agreement.
m.   The successful bidder/ allottee shall be responsible for obtaining all the necessary
  Clearances/NOCs from the respective Local Authorities as required from time to time
  as per the respective DCRs
      In addition to the general terms and condition for disposal of plots of land, the
      allotment is subject to the following development conditions:
.
    Navi Mumbai is now a planned city replete
    with     well-planned     roads,     internal
    expressways, flyovers, multi-structured rail
    corridors, modern railway stations that            Each node is self-sufficient in educational,
    house         commercial         complexes,        health, social, religious, cultural, sports
    state-of-heart IT parks, excellent internet        and recreational facilities. Each node is
    connectivity, super specialty hospitals,           also a self-contained nodal settlement. The
    educational facilities, etc. with proposed         lush green gardens, arterial roads lined
    airport, special economic zone and                 with rows of trees, afforested hills, well laid
    proposed trans-harbour link facilities. Acity      out railway system are some of the salient
    that Two million people call 'home'.               features of the new city. The city is
                                                       connected to Greater Mumbai by bridges
                                                       across Thane Creek and by railway to
                                                       Chhatrapati Shivaji Maharaj Terminus.
    Terms of offer:
                                               5.   Permission for transfer may be
     Under the general terms prescribed for         granted on payment of Transfer
     disposal of Plot by e-Tender cum e-            Charges as may be decided by the
     Auction.                                       Corporation from time to time, only
                                                    after, the allottee has paid entire
    Location of Plots:                             lease premium and taken over
                                                    possession of the Plot by execution of
     The location of Plots for which offers         Agreement to Lease.
     are invited are shown in plans
     enclosed hereto at Annexure-I             6.   The Miscellaneous Charges and
                                                    Payment      of   Stamp    Duty    &
    Description of Plots:                          Registration    charges   are    not
                                                    included in the Lease Premium of the
     Please refer to the Annexure – I for           plots: -
     details. Bidder are advised to visitthe
     site/plot before submitting rates for          The Allottee will bear & pay
     auction & close bid as no                      exclusively the Stamp Duty & the
     communication will be entertained              Registration Charges payable in
     regarding this after submission of             accordance with the Bombay Stamp
     the bid                                        Act 1958 in respect of the Agreement
                                                    to Lease to be executed between the
    Agreement to Lease:                            Corporation of one part and the
                                                    allottee of the other part.
1.    Lease of the Plots will be as per Navi
     Mumbai       Disposal      of    Lands         a. Applicable Water Deposit & Water
     (Amendment) Regulations 2008.                     charges are payable to CIDCO/
                                                       NMMC/PMC directly.
2.   The allottee shall execute, sign all
     necessary      documents,     forms,           b. All other statutory charges levied
     declarations,    etc  required    for             from time to time shall be
     registering the Plot.                             applicable and binding on allottee.
3.   On payment of entire lease premium        7.   The possession of the Plot must be
     and miscellaneous charges, the                 taken over within 30 days after
     Agreement to Lease shall be                    completing all the payment.
     executed and possession of the Plot
     will be granted.                               Important: Offerer shall visit and
                                                    inspect the physical condition of the
4.   The allottee shall not be permitted to         Plot for which he/she intends to offer
     transfer or assign the rights and
     interest in or benefits derived under     8.   Breach of any of the conditions will
     the Agreement executed between                 render the allotment liable for
     him/her and the Corporation in                 termination with forfeiture of the
     respect of the Plot without the prior          Earnest Money Deposit.
     permission of the Corporation.
9.    CIDCO reserves the rights to
      insert or impose any special               11.  In the matter of dispute as
      condition which will be binding on         regards interpretation of any of
      the allottee.                              the conditions or of anything
                                                 related to the Scheme, the
10.   CIDCO reserves the right to                decision    of   the   Managing
      amend, revoke any or all the               Director (MD) of CIDCO or Officer
      above condition or to cancel the           authorized by MD shall befinal and
      scheme/plot at any time at its             binding upon all the concerned.
      sole discretion. The right to
      reject/cancel     any     or   all   12.   GST: The allottee shall pay the
      offers/plots without assigningany          applicable GST and other taxes.
      reason whatsoever is reserved with
      the Corporation.
                                                 ii.   The No Objection Certificate
                                                       shall enable the allottee to
1. Schedule of payment of agreed                       mortgage the said Plot to
   Lease Premium                                       financial institutions only after
                                                       the payment of entire Lease
   Agreed     Lease   Premium,     after               Premium and other charges
   adjusting the Earnest Money Deposit                 and     after    execution     of
   (EMD), shall be payable in two equal                Agreement to lease.
   installments in the manner as
   prescribed in the Acceptance /             5. Consequences of nonpayment of
   Allotment letter.                             any of the installment of lease
                                                 premium on due date
2. Grant of extension of time for
   making payment of installments             a. If the allottee fails to pay the entire
                                                  amount of first installment within
 3. The Managing       Director    of   the       its prescribed time schedule or
    Corporation may extend the time               within the extendable period as
    prescribed for making the payment of          per condition number 5, the
    installment not exceeding 03 months           Agreement        concluded       shall
    for 1st installment and not exceeding         stand      terminated      and    the
    10 months for 2nd installments. This
                                                  Earnest Money Deposit along
    extension is grantable upon payment
    of interest at the rate as may be             with 25% of the installment/s paid
    prescribed by the Corporation from            by the allottee shall standforfeited
    time to time. The allottee should apply       to the Corporation.
    for extension before the due date for
    payments. The present rates of            b. On payment of first installment or
    interest 8.40% per annum.                    part thereof, if the allottee fails to
    The above rate is subject to change          pay the balance amount of First
    without notice.                              installment     and     amount      of
                                                 subsequent installment within the
4. The Corporation may grant "No                 prescribed     period     or   within
   Objection Certificate" to enable the          permissible extendable time as
   allottee to mortgage the plots to obtain      the case may be, the allotment
   loan. Such No Objection Certificate           shall be liable to be terminated by
   shall be granted subject to the               the Corporation. The earnest
   following conditions:                         Money Deposit along with the
                                                 25% of the installment/s paid shall
   i. The allottee shall apply to the
                                                 stand forfeited to the Corporation
      Corporation along with a letter from
                                                 and the balance amount will be
      the Financial Institution granting
                                                 refunded without any interest.
      the loan.
                                                 The Corporation also reserves
                                                 the right to recover
      compensation    for   loss    or          10. Power connection
      damage, if any, suffered in
                                                   Power      connection,    consumption
      consequences of such default.
                                                   deposits and other charges will be
6. Payment of Miscellaneous charges                paid directly by the allottee to the
                                                   Maharashtra       State      Electricity
      In addition to the lease premium and         Distribution Co. Ltd. (MSEDCL) from
      the applicable taxes, the allottee will      time to time. The allottee will apply
      have to bear the Miscellaneous               directly to the MSEDCL for power
      Charges      comprising    of    water       connection by completing all the
      distribution charges, documentation          necessary formalities. For permanent
      charges, PSIDC, service charges etc.         power connection the NOC will be
      as applicable.                               given after allottee owner has
                                                   executed the Agreement to Lease with
7. Mode of payment                                 the Corporation and all the dues of the
                                                   Corporation have been paid.
     The payment of installment of Lease
     Premium, water distribution betterment     11. Water supply
     charges, documentation charges and            Water supply will be made
     lease rent etc shall be paid separately       available   on     payment     of
     through online process.                       necessary water connection and
                                                   water consumption charges to the
8.    Payment of taxes / service charges
                                                   Corporation or the concerned
      All Services Charges and Taxes as            Municipal Authority from time to
      applicable, are payable to the               time by completing formalities of
      Corporation/Government.                      concerned authority in       this
                                                   regard.
9.    Transfer or assignment of rights
                                                12. Payment of land revenue
      The allottee can transfer or assign his      The allottee shall     pay     land
      rights, interests or benefits which may      revenue and ceases, assessed or
      accrue to him from the Agreement with        which may be assessed on the
      the prior written permission of the          land agreed to be leased to him.
      Corporation and on payment of such
                                                13. Nuisance
      Transfer     Charges      as   may   be
      prescribed by the Corporation from          The allottee shall not at any time
      time to time. Such permission can           do, cause or permit any nuisance
      however be granted only after the           in or upon the said land agreed to
      agreed Lease Premium and any other          be leased.
      amount has been paid in full and after
                                                14. Recovery of any sum due
      execution of agreement to Lease.
                                                    to the corporation
      Before the agreement for Lease, the
      allottee shall not transfer the rights,      Where any sum payable to the
      benefits and interests, he/she derives       Corporation by the allottee under
      in the Plot allotted to him/her.
   the Agreement to Lease is not
   paid, the Corporation shall be        16. Format of Agreement to lease
   entitled to recover such sum as
                                            Format of Agreement to Lease
   arrears of land revenue.
                                            will be made available for
15. Execution of agreement                  inspection only after payment of
                                            Lease premium and all other
   Immediately within 30 days of            requisites      mentioned      in
   the payment of agreed Lease              allotment letter and any other if
   Premium and Miscellaneous                demanded timely, in the office of
   Charges in full, the allottee shall      the      Manager       Marketing
   execute the Agreement to Lease           (Commercial) on the 3rd Floor,
   with the Corporation and shall           Raigad Bhavan, CBD-Belapur,
   obtain the possession of the Plot.       Navi Mumbai, 400 614.
   In case the allottee fails to
   execute the Agreement to lease           Note: The rights to reject any or
   within a period of 30 days from          all the bidder without assigning
   making the payment of total              any reason are reserved by the
   Lease Premium, the agreement             Corporation.
   so concluded shall be liable for
                                           The bidder shall not take benefit
   termination and the EMD along
                                           of any grammatical or printing
   with 25% of the installments/s
                                           mistake   which     may     have
   paid shall be forfeited without
                                           occurred
   prejudice to the rights of the
   corporation,       to      recover    17. For further details please contact:
   compensation       for   loss   or
   damage if any suffered in                Manager     Marketing
   consequence of such default.             (Commercial)
   However, the Managing Director           CIDCO Ltd., 3rd Floor,
   on request of the licensee can           Raigad Bhavan,
                                            CBD Belapur,
   forgo period for up to 90 days on
                                            Navi Mumbai - 400 614.
   recovery of watch & ward
   charges at the rate of Rs.5 per         Tel.: 022 67121178/1080
   sqm per month.
                                         Annexure-I
                                                Area
Sr.               Sector                                      Base
       Node                   Plot No.        in(Sqm)   Use           Base Rate      EMD
No.                No.                                        F.S.I
                                              Approx.
1       Airoli      7           11B            399.46   R     1.1        40600    1621808
2       Airoli     2B           87             68.25    R     1.1        36350    248089
3       Airoli     2B           106            58.89    R     1.1        36350    214065
4       Airoli     2B           113            61.14    R     1.1        45437    277802
5       Airoli     2B           115            60.92    R     1.1        45437    276802
6       Airoli     2E           158            41.54    R     1.1        45437    188745
7       Airoli     2E           201            41.71    R     1.1        45437    189518
8       Airoli     2E           206            42.43    R     1.1        45437    192789
9       Airoli     2E         156+157          42.59    R     1.1        36350    154815
10      Airoli     2E         202+203           50.3    R     1.1        36350    182841
11      Airoli     4A           103            64.89    R     1.1        45437    294841
12      Airoli     4A           10A            57.75    R     1.1        45437    262399
13      Airoli     4R           209            100.86   R     1.1        36350    366626
14      Airoli     4T           223            75.16    R     1.1        36349    273199
15      Airoli     4T         224+225          75.38    R     1.1        36350    274006
16      Airoli     4T         226+227           71      R     1.1        36350    258085
17      Airoli     4U        132B+132C         97.51    R     1.1        45437    443056
18    Ghansoli      1         355+356          67.31    R     1.1        39394    265161
19    Ghansoli      1         362+363          68.01    R     1.1        39394    267919
20    Ghansoli      1         364+365           67.6    R     1.1        34500    233220
21    Ghansoli      1       369+370+371        100.54   R     1.1        39394    396067
22    Ghansoli      4         275+276          65.49    R     1.1        30800    201709
23    Ghansoli      4         287+288          65.86    R     1.1        35813    235864
24    Ghansoli      4         289+290          65.98    R     1.1        30800    203218
25    Ghansoli      4         291+292          66.04    R     1.1        35813    236509
26    Ghansoli      4         509+510          67.33    R     1.1        39394    265240
27    Ghansoli      4       512+513+514        100.92   R     1.1        39394    397564
28    Ghansoli      5         217+218          79.82    R     1.1        41900    334446
29    Ghansoli      6          73+74           66.32    R     1.1        39394    261261
30    Ghansoli      6          75+76           66.34    R     1.1        35500    235507
31    Ghansoli      6          77+78            66.4    R     1.1        39394    261576
32     Nerul       18A          84             40.19    R     1.1        63100    253599
33    Kalamboli    12           A-1            130.19   R     1.1        35373    460521
34    Kalamboli    12      A-10 /28+29+30      115.25   R     1.1        32753    377478
35    Kalamboli    12      A-10 31+32+33       122.91   R     1.1        32753    402567
36    Kalamboli    12      A-13/ 28+29+30      137.04   R     1.1        32753    448847
37    Kalamboli    12      A-13/ 31+32+33      129.93   R     1.1        32753    425560
38    Kalamboli    12      A-14/ 28+29+30      132.94   R     1.1        32753    435418
39   Kalamboli   12   A-14/ 31+32+33   144.34   R   1.1   32753   472757
40   Kalamboli   12   A-15/ 28+29+30   147.21   R   1.1   32753   482157
41   Kalamboli   12   A-15/ 31+32+33   116.81   R   1.1   32753   382588
42   Kalamboli   12        A-3         131.97   R   1.1   30200   398549
43   Kalamboli   12   A-9/ 28+29+30    126.7    R   1.1   32753   414981
44   Kalamboli   12   A-9/ 31+32+33    115.25   R   1.1   32753   377478
45   Kalamboli   12   B-1 / 31+32+33   115.53   R   1.1   32753   378395
46   Kalamboli   12   B-1/ 28+29+30    121.51   R   1.1   32753   397982
47   Kalamboli   12       B16A         279.17   R   1.1   32753   914366
48   Kalamboli   12   B-2/ 28+29+30    122.79   R   1.1   32753   402174
49   Kalamboli   12   B-2/ 31+32+33    121.28   R   1.1   32753   397228
50   Kalamboli   12       B-20         65.21    R   1.1   30200   196934
51   Kalamboli   12   B-3/ 28+29+30    130.44   R   1.1   32753   427230
52   Kalamboli   12   B-3/ 31+32+33    133.88   R   1.1   32753   438497
53   Kalamboli   13    24/ 31+32+33    103.56   R   1.1   32753   339190
54   Kalamboli   13       108A         148.24   R   1.1   32753   485530
55   Kalamboli   13   18/ 28+29+30     88.02    R   1.1   32753   288292
56   Kalamboli   13   18/ 31+32+33     101.53   R   1.1   32753   332541
57   Kalamboli   13   19/ 28+29+30     99.58    R   1.1   32753   326154
58   Kalamboli   13   19/ 31+32+33     98.76    R   1.1   32753   323469
59   Kalamboli   13   20/ 28+29+30     120.07   R   1.1   32753   393265
60   Kalamboli   13   20/ 31+32+33      92.3    R   1.1   32753   302310
61   Kalamboli   13   21/ 28+29+30     109.49   R   1.1   32753   358613
62   Kalamboli   13   21/ 31+32+33     102.21   R   1.1   32753   334768
63   Kalamboli   13   22/ 28+29+30     95.88    R   1.1   32753   314036
64   Kalamboli   13   22/ 31+32+33     101.98   R   1.1   32753   334015
65   Kalamboli   13   23/ 28+29+30     107.83   R   1.1   32753   353176
66   Kalamboli   13   25/ 28+29+30     86.95    R   1.1   32753   284787
67   Kalamboli   13       A-54         268.11   R   1.1   35373   948386
68   Kalamboli   13    B(108+109)      116.38   R   1.1   26202   304939
69   Kalamboli   13    B(110+111)      117.08   R   1.1   26202   306773
70   Kalamboli   13    B(112+113)      115.29   R   1.1   26202   302083
71   Kalamboli   13    B(114+115)      114.01   R   1.1   26202   298729
72   Kalamboli   13    B(116+117)      113.37   R   1.1   26202   297052
73   Kalamboli   13    B(118+119)      112.69   R   1.1   26202   295270
74   Kalamboli   13    B(120+121)      111.95   R   1.1   26202   293331
75   Kalamboli   13    B(122+123)      111.22   R   1.1   26202   291419
76   Kalamboli   13    B(124+125)      123.47   R   1.1   32753   404401
77   Kalamboli   13    B(126+127)      123.47   R   1.1   26202   323516
78   Kalamboli   13    B(128+129)      123.47   R   1.1   26202   323516
79   Kalamboli   13    B(132+133)      119.64   R   1.1   26202   313481
80   Kalamboli   14   A-1/31+32+33     109.46   R   1.1   32753   358514
81   Kalamboli   14   A-5/28+29+30     101.1    R   1.1   32753   331133
82   Kalamboli   14   A-5/31+32+33     103.07   R   1.1   32753   337585
83    Kalamboli     14     A-7/31+32+33     91.85    R   1.1   32753   300836
84    Kalamboli     14     A-8/31+32+33     117.22   R   1.1   32753   383931
85    Kalamboli     14       B/140+141      127.66   R   1.1   31800   405959
86    Kalamboli     14       B/142+143      129.78   R   1.1   31800   412700
87    Kalamboli     14        B-107A        100.22   R   1.1   32753   328251
88    Kalamboli     14     B-2/28+29+30     84.86    R   1.1   32753   277942
89    Kalamboli     14     B-2/31+32+33     91.15    R   1.1   32753   298544
90    Kalamboli     14     B-4/28+29+30      89.1    R   1.1   32753   291829
91    Kalamboli     14     B-4/31+32+33     102.8    R   1.1   32753   336701
92    Kalamboli     14     B-5/28+29+30     98.63    R   1.1   32753   323043
93    Kalamboli     14     B-5/31+32+33     94.63    R   1.1   32753   309942
94    Kalamboli     14     B-54/31+32+33     91.7    R   1.1   32753   300345
95    Kalamboli     14     B-55/28+29+30    110.79   R   1.1   32753   362870
96    Kalamboli     14     B-55/31+32+33     94.4    R   1.1   32753   309188
97    Kalamboli     14     C-23/28+29+30    105.28   R   1.1   32753   344824
98    Kalamboli     14     C-24/28+29+30    99.15    R   1.1   32753   324746
99    Kalamboli     14     C-24/31+32+33    104.43   R   1.1   32753   342040
100   Kalamboli     14     C-25/28+29+30    102.09   R   1.1   32753   334375
101   Kalamboli     14     C-26/28+29+30    103.99   R   1.1   32753   340598
102   Kalamboli     14     C-26/31+32+33    88.85    R   1.1   32753   291010
103   Kalamboli     14     C-27/28+29+30    106.83   R   1.1   32753   349900
104   Kalamboli     14     C-27/31+32+33    97.77    R   1.1   32753   320226
105   Kalamboli     14     C-50/31+32+33    110.94   R   1.1   32753   363362
106   Kalamboli     14     C-51/28+29+30    88.67    R   1.1   32753   290421
107   Kalamboli     14     C-51/31+32+33    115.28   R   1.1   32753   377577
108   Kalamboli     14     C52/28+29+30     107.57   R   1.1   32753   352324
109   Kalamboli     14     C53/28+29+30     96.86    R   1.1   32753   317246
110   Kalamboli     14     C-53/31+32+33    96.64    R   1.1   32753   316525
111   Kalamboli     14     C-54/28+29+30     93.2    R   1.1   32753   305258
112   Kalamboli     14     C-54/31+32+33    96.37    R   1.1   32753   315641
113    Kharghar     12     A43-32+33+34     87.71    R   1.1   46800   410483
114    Kharghar     12          D41         172.26   R   1.1   50275   866037
115    Kharghar     12     E121- 30+31+32   93.04    R   1.1   46800   435427
116    Kharghar     12      E121-33+34      92.92    R   1.1   46800   434866
117    Kharghar     21          166         199.9    R   1.1   45600   911544
118   New Panvel   6 (E)        22A         103.94   R   1.1   39200   407445
119   New Panvel   6 (E)    A1-33+34+35     100.24   R   1.1   43004   431072
120   New Panvel   6 (E)     A2-30+31       124.54   R   1.1   43004   535572
121   New Panvel   6 (E)    A3-33+34+35     93.24    R   1.1   43004   400969
122   New Panvel   6 (E)    A4-30+31+32     97.77    R   1.1   43004   420450
123   New Panvel   6 (E)     A4-33+34       98.86    R   1.1   43004   425138
124   New Panvel   6 (E)   A45-30+31+32     82.87    R   1.1   43004   356374
125   New Panvel   6 (E)   A46- 30+31+32    107.97   R   1.1   43004   464314
     126   New Panvel   6 (E)   A46- 33+34+35   99.38    R   1.1      43004       427374
     127   New Panvel   6 (E)   A47- 33+34+35   130.25   R   1.1      39200       510580
     128   New Panvel   6 (E)    A48-31+32      104.81   R   1.1      39200       410855
     129   New Panvel   6 (E)   A5- 30+31+32    99.12    R   1.1      43004       426256
     130   New Panvel   6 (E)   A5- 33+34+35     98.5    R   1.1      43004       423589
     131   New Panvel   6 (E)   B1-33+34+35     108.33   R   1.1      43004       465862
     132   New Panvel   6 (E)   B2-33+34+35     105.59   R   1.1      43004       454079
     133   New Panvel   6 (E)   B42-30+31+32    105.1    R   1.1      43004       451972
     134   New Panvel   6 (E)   B43-30+31+32    97.98    R   1.1      43004       421353
     135   New Panvel   6 (E)   B43-33+34+35    101.28   R   1.1      43004       435545
     136   New Panvel   6 (E)   B44-30+31+ 32   103.67   R   1.1      43004       445822
     137   New Panvel   6 (E)   B44-33+ 34+35    95.9    R   1.1      43004       412408
     138   New Panvel   6 (E)   C17-30+31+32    87.86    R   1.1      43004       377833
     139   New Panvel   6 (E)   C18-33+34+35     85.3    R   1.1      43004       366824
     140   New Panvel   6 (E)   C3- 30+31+32     98.6    R   1.1      43004       424019
     141   New Panvel   6 (E)   C3- 33+34+35    99.29    R   1.1      43004       426987
     142   New Panvel   6 (E)   C4- 30+31+32    94.12    R   1.1      43004       404754
     143   New Panvel   6 (E)   C4- 33+34+35    98.77    R   1.1      43004       424751
     144   New Panvel   6 (E)    C5-30+31       98.77    R   1.1      39200       387178
     145   New Panvel   6 (E)   C6-30+31+32     97.16    R   1.1      43004       417827
     146   New Panvel   6 (E)   C6-33+34+35     99.74    R   1.1      43004       428922
     147   New Panvel   6 (E)   D33-30+31+32    79.76    R   1.1      43004       343000
     148   New Panvel   6 (E)   D34-32+33+34    82.07    R   1.1      43004       352934
     149   New Panvel   6 (E)   D35-32+33+34    87.21    R   1.1      43004       375038
     150   New Panvel   6 (E)   D36-30+31+32    57.67    R   1.1      43004       248004
     151   New Panvel   9 (E)        20         231.08   R   1.1      39200       905834
     152   Panvel (E)    6          22C         201.27   R   1.1      43004       865542
     153   Panvel (E)    12          20         207.08   R   1.1      39200       811754
   The Base FSI shall be as mentioned above and the maximum permissible FSI shall be
    as per approved Unified Development Control & Promotion Regulations (UDCPR) for
    Maharashtra State as approved by the GoM shall be applicable.