0% found this document useful (0 votes)
41 views1 page

Human Resource Title: Disinfection /fumigation Area Details: Annexure-I

The document provides details on the disinfection and fumigation areas of a company. It lists the name of the disinfectant used, the frequency of disinfection as once a month, and the areas that will be disinfected for four departments - Admin, Production, Store, and Engineering. These include security cabins, dining halls, production areas, solvent storage areas, and engineering machine areas.

Uploaded by

GOMTI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Human Resource Title: Disinfection /fumigation Area Details: Annexure-I

The document provides details on the disinfection and fumigation areas of a company. It lists the name of the disinfectant used, the frequency of disinfection as once a month, and the areas that will be disinfected for four departments - Admin, Production, Store, and Engineering. These include security cabins, dining halls, production areas, solvent storage areas, and engineering machine areas.

Uploaded by

GOMTI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

HUMAN RESOURCE Annexure-I

TITLE: DISINFECTION Page No.1 of 1


/FUMIGATION AREA DETAILS

NAME OF DISINFECTANT/FUMIGATION AGENCY:

NAME OF THE PERSON:

FREQUENCY: ONCE IN A MONTH

DISINFECTANT USED: DECO3 (Polyhexametheline, Guandine, Alkeyl Demethyl Ammn-


Chloride & Alkyl with Surfactants)

DATE:
Sl No. Department Area Done by Checked by
Security Cabin, Chang Room, Admin Room,
Pooja Room, Meeting Hall-1, Dining Hall,
1 Admin Pantry, AGM, First Floor Entry Passage, QA
Cabin, VP, GM, COO Cabin & Meeting Hall-2.
A block ground & first floor, B block ground &
2 Production first floor, Centrifuge Area, ETP storage Area,
solvent storage Area and other Production Area.
Store Cabin, Entrance area, all the doors and
3 Store outside the FG area, Solvent storage yard.

Engineering Cabins, All the corners, passage,


4 Engineering Entry points, Around the machine, drainage,
Boiler Area, Chiller Area

You might also like