5806 - 110 P & M Doc For Effluent Disposal Pump REv 02
5806 - 110 P & M Doc For Effluent Disposal Pump REv 02
03
OWNER : M/s. THDC INDIA LIMITED
CONSULTANT 1 : M/s NTPC LIMITED
CONSULTANT 2 : ENGINEERING PROJECTS (INDIA) LTD
CONTRACTOR :- M/s GAJA ENGINEERING PRIVATE LIMITED,
PROJECT: - KHURJA SUPER THERMAL POWER PROJECT (2 x 660 MW)
PACKAGE : WATER TREATMENT PLANT & MISCELLANEOUS PACKAGE
SUB PACKAGE : DEMINERALISATION PLANT (UF-RO BASED)
NOTE:
80
70
60
HEAD (M)
50
40
30
20
10
0
0 20 40 60 80 100 120
CAPACITY (M³/Hr.)
25
20
BKW (KW)
15
10
0
0 20 40 60 80 100 120
CAPACITY (M³/Hr.)
90
80
70
Efficiency %
60
50
40
30
20
10
0
0 20 40 60 80 100 120
CAPACITY (M³/Hr.)
9
8
7
6
NPSHR (M)
5
4
3
2
1
0
0 20 40 60 80 100 120
CAPACITY (M³/Hr.)
Project : KHURJA SUPER THERMAL POWER PROJECT ( 2 x 660 MW) WO NO SALE 22085806 - 110
Package : Water Treatment Plant & Miscellaneous Package OWNER : THDC India Limited Contractor:- Gaja Engineering Pvt. Ltd.
Consultant 1 : NTPC Ltd. / Consultant 2 : Engineering Projects (India) Ltd Sub Package Demmineralisation Plant (UF-RO Series)
Model 5623 (S.O) 80 x 50
Description : Effluent Disposal Pump Pump Input w Water : 16.67 Kw
Capacity 75.0 M³/Hr. Pump Input w Liquid :17.51 Kw (S.G 1.05)
Head 60.0 Mtrs NPSHR 1.6 Mtr
SOH 66.8 Mtrs Speed 2945 rpm
Efficiency 73.5 % Motor Rating 22 KW
FLANGE DETAIL AS PER ANSI B16.5, 150 LBS,
75 500 500 75
SUCTION:------ 80 N.B. DISCHARGE:---- 50 N.B.
FLANGE O.D.:--- 190.5 FLANGE O.D.:--- 152.4
P.C.D.:--------- 152.4 P.C.D.:--------- 120.7
NO. OF. HOLES:- 4 NO. OF. HOLES:- 4
DISCH.C
L DIA OF BOLTS:- M16 DIA OF BOLTS:- M16
175
SUCT.CL
(TOP) FOUNDATION PLAN CD CASING DRAIN 1/2" B.S.P.
GD GLAND DRAIN 1/2" B.S.P.
350
CG COMPOUND GAUGE 3/8" B.S.P.
PG PRESSURE GAUGE 3/8" B.S.P.
35 `X'
6 NOS.~FOUNDATION BOLT
`L' TYPE SIZE:-M16-2Px250 Long
35
485 100 700
Vent Conn.
Pipe with Valve POCKET
75 SQ.
250
100
PG DISCHARGE
FLEX. SPACER
TYPE COUPLING
24
19
DETAIL-`X'
200
'M'
CG
SUCTION
180
160
Casing Drain
Pipe with Valve
82
GD
50
100
'M'
TO BE GROUTED
1150 AFTER, LEVELING
400
& FASTENING
OF SKID BASE VIEW `M'-`M'
NOTE:-
2 CHANGE AS PER COMMENTS SUNIL 01.02.2023
1. DIMENSIONS ARE IN MM. UNLESS OTHERWISE SPECIFIED. 1 CHANGE AS MARKS SUNIL 22.11.2022
2. DIRECTION OF PUMP ROTATION:- COUNTER CLOCK WISE, WHEN LOOKING FROM DRIVING END. Rev.No. REVISION SIGN DATE
3. STATIC LOAD (PUMP SET WITH MOTOR) = 360 Kgs. (Approx). JOB NAME :- EFFLUENT (PS 1).,
4. DYNAMIC LOAD (PUMP SET WITH MOTOR) = 450 Kgs. (Approx). OWNER :- M/s. THDC INDIA LIMITED
CONSULTANT 1:- M/s NTPC LIMITED
MOTOR PARTICULARS PUMP PARTICULARS (QTY.:- 03 Nos.) CONSULTANT 2:- ENGINEERING PROJECTS (INDIA) LTD
CONTRACTOR :- M/s GAJA ENGINEERING PRIVATE LIMITED,
MAKE FIG.
-- LHP -- 5623 (S.O.) PROJECT :- KHURJA SUPER THERMAL POWER PROJECT (2x660 MW)
FRAME SIZE
-- 180M -- 80x50 (3"x2") PACKAGE :- WATER TREATMENT PLANT & MISCELLANEOUS PACKAGE
STAGE -- SINGLE SUB PACKAGE :- DEMINERALISATION PLANT (UF-RO BASED)
POWER -- 22K.W. ORDER NO. :- Later On., DT.:-22.08.2022
SPEED -- 2945 R.P.M.
SPEED -- 2945 R.P.M. GENERAL ARRANGEMENT DRAWING NAME DATE
CAPACITY -- 75 (Cu. M /Hr.) DRN. SUNIL 13.09.2022
HEAD -- 60 Mtr. FOR SCALE CHD. D.K.S. 13.09.2022
PHASES -- THREE PUMP INPUT -- 17.51 K.W. HORIZONTAL END SUCTION PUMP N.T.S. APPD. P.K.S. 13.09.2022
FREQUENCY -- 50 Hz.+3%-5% (Sp. Gr. 1.05) FLOWMORE LIMITED
DRAWING NO. REV.
1 Space Heaters (Applicable for 30KW & above motor ) (Nos/power in watts/ suply voltage) NA
700
F
U
500
L
L Current Speed at 80% Voltage
L
O
A 400
D
T
O
R
Q 300
U
E
MOTOR Wt. APPROX. ( kg ) T-N at 100% Voltage T-N at 110% Voltage
&
200
C
U
R
R
E
N 100
T
T-N at 80% Voltage
VARIABLE TORQUE
0
0 10 20 30 40 50 60 70 80 90 100
% SYNCHRONOUS SPEED
1.5/2.0
100.00 1.00
0
95.00
90.00 0.90
85.00
EFFICIENCY
80.00 0.80
75.00
% EFFICIENCY
70.00 0.70
POWER FACTOR
P.F.P.U.
65.00
60.00 0.60
55.00
50.00 0.50
45.00
40.00 0.40
35.00
30.00 0.30
25.00
20.00 0.20
15.00
10.00 0.10
5.00
0.00 0.00
0 10 20 30 40 50 60 70 80 90 100
% LOAD
100 1.5/2.0
0
10
THERMAL WITHSTAND
1
Istg (time) at 100%V
0.1
0 100 200 300 400 500 600 700
% FULL LOAD CURRENT
TWT-COLD
TWT-HOT 100% V
TWT-COLD 100% V
TWT-HOT 110% V
TWT-COLD 110% V
1000
100
39
TIME IN SECS.
22
18
18
10
10
8
0
0 100 200 300 400 500 600 700 800 900
% CURRENT
700
600
500
WIT.TIME (SECS)
WITHSTAND TIME(SECS)
400
300
200
100
0
0 5 10 15 20 25 30 35 40 45
% UNBALANCE CURRENT