0% found this document useful (0 votes)
102 views

MIL02 - Site 44: Datacenter Italy Caleppio Di Settala Strada Prov. 415

Uploaded by

Gino Filosa
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views

MIL02 - Site 44: Datacenter Italy Caleppio Di Settala Strada Prov. 415

Uploaded by

Gino Filosa
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

GENERAL NOTES Jacobs Italia S.p.A.

Via Alessandro Volta, 16


20093 Cologno Monzese (MI) - Italy
T: +39 (02) 250981
®
A. SEE DRAWING E-A-01-0 FOR LEGENDS, NOTES, AND ABBREVIATIONS.
B. SEE SET OF E-U- DRAWINGS FOR UNDERGROUND ROUTINGS DETAILS.
COORDINATE FINAL SCOPE WITH OWNER AND PER SITE CONDITIONS.
C. SEE SET OF E-H- DRAWINGS FOR SIZE OF UNDERGROUND CONDUITS AND
ADDITIONAL INFORMATION. SPARE CONDUITS SHOWN IN DUCTBANK SECTION
CUTS ON E-U SERIES DRAWINGS.
D. CONTRACTOR SHALL NOT SCALE FROM THESE DRAWINGS.
E. CONTRACTOR SHALL BE RESPONSIBLE FOR CHECKING/VERIFYING ALL
DIMENSIONS ON SITE.
F. CONTRACTOR SHALL NOT CONSTRUCT OR FABRICATE DIRECTLY FROM THIS
DRAWING.
G. CONTRACTOR SHALL PRODUCE THEIR OWN COORDINATED WORKING
DRAWINGS FOR THE PURPOSES OF CONSTRUCTION.
H. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH THE SERVICES
SPECIFICATIONS, ALL APPLICABLE LOCAL CODES, STANDARDS AND
REGULATIONS.
I. THIS DRAWING SHALL BE READ IN CONJUNCTION WITH 26.05.43
UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS.
J. ALL DUCTS SHALL BE SEALED AS PER 16.05.43 UNDERGROUND DUCTS AND
RACEWAYS FOR ELECTRICAL SYSTEMS.
K. REFER TO ARCHITECTS AND STRUCTURAL ENGINEERS DRAWINGS FOR
EXACT LOCATIONS OF COLUMNS, PILES AND PILE CAPS WITH REGARDS TO
COORDINATION OF SERVICES BELOW BUILDINGS AND PLANT.
L. CABLE DUCTS/CABLES SHALL BE LOWERED LOCALLY TO AVOID OTHER
SERVICES.
M. DUCT ENTRIES INTO CABLE TURNING PITS TO INCORPORATE BELL MOUTHS.
N. ALL CABLE DUCTS SHALL BE TO CEI EN STANDARDS.
O. AFTER INSTALLATION, ALL DUCTS, PIPES AND CABLE TRENCHES SHALL BE
CLEARED OF SOIL, DEBRIS AND RUBBISH AND ALL ENDS SEALED TO
PREVENT THE INGRESS OF FOREIGN MATTER PRIOR TO THE INSTALLATION
OF SERVICES.
P. COORDINATE LOCATION OF CONDUIT PENETRATIONS AT BUILDING
FOUNDATION STEM WALL WITH UNDERGROUND UTILITIES AND SITE POWER
AND CONTROL REQUIREMENTS.
Q. COORDINATE UNDERGROUND CONDUITS WITH OTHER TRADES PRIOR THE
INSTALLATION.
R. COORDINATE VAULT QUANTITY AND LOCATIONS WITH CABLING AND PULL.

MIL02 - Site 44
UNDERGROUND LOW VOLTAGE ROUTING UNDERGROUND MEDIUM
CONDUIT COLOUR CODING Datacenter Italy
N.8 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) VOLTAGE ROUTING FOR BALLARD UNDERGROUND LOW VOLTAGE ROUTING
N.6 MV PIPES ∅200mm N.8 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) UNDERGROUND LOW VOLTAGE ROUTING
N.6 LV PIPES ∅160mm, UNLESS NOTED OTHERWISE
Caleppio di Settala
Strada Prov. 415
UNDERGROUND LOW VOLTAGE ROUTING
UNDERGROUND MEDIUM VOLTAGE ROUTING
N.2 LV PIPES ∅125mm (LOW VOLTAGE SERVICE) N.4 MV PIPES ∅200mm, UNLESS NOTED OTHERWISE

NON-TYPICAL LOW VOLTAGE PIT 1500X1500X2500mm UNDERGROUND LOW VOLTAGE ROUTING


N.8 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) UNDERGROUND MEDIUM VOLTAGE ROUTING FOR RDD, Design Team
RUN A
Jacobs Italia S.p.A.
N.1 MV PIPES ∅200mm
Design
MIN. DISTANCE FROM RUN B 1800mm MARCO VESCOVI

Drawn

UNDERGROUND LOW VOLTAGE ROUTING UNDERGROUND MEDIUM VOLTAGE ROUTING FOR RDD, CARLO ANDREONI
UNDERGROUND LOW VOLTAGE ROUTING RUN B Checked
N.8 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) N.5 LV PIPES ∅160mm (LOW VOLTAGE SERVICE)
N.1 MV PIPES ∅200mm
GIUSEPPE LACERENZA

Approved
MIN. DISTANCE FROM RUN A 1800mm
27th JANUARY 2022
Date
BUILDING
BUILDINGID
ID UNDERGROUND AUXILIARY ROUTING MLK78104
SEE INFORMATION DETAIL AND DESCRIPTION FOR Company Project No.
NUMBER AND SECTION OF THE PIPES P.17224
M.S. Project No.

UNDERGROUND LOW VOLTAGE ROUTING


N.16 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) Approvals

COLO 1

ADMIN
CUSTOMER Date
MEDIUM VOLTAGE PIT FOR MICROSOFT
BALLARD 1700x1700x2000mm LOW VOLTAGE PIT
TYPICAL FOR ENTIRE RUN 1500x1500x1500mm
GREG LYNCH
TYPICAL FOR ENTIRE RUN Microsoft Mechanical Engineer Date
UNDERGROUND LOW VOLTAGE ROUTING CATHAL O'SULLIVAN
N.8 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) Microsoft Cable Engineer
ALAN KELLETT
UNDERGROUND MEDIUM Microsoft Electrical Engineer

VOLTAGE SUPPLY ROUTING VICTORIA MARSHALL

N.6 MV PIPES ∅200mm


Design Manager
MICHAEL O'DONNELL
LIGHTSPEED BATTERY LIMIT Security Manager
SHARENDRA NAIDU; LAOISE MAHER
CSA

PROJECT MANAGEMENT

UNDERGROUND MEDIUM
VOLTAGE SUPPLY ROUTING LEONARDO DI RIENZO

N.2 MV PIPES ∅200mm Project Manager


GIUSEPPE LACERENZA
LIGHTSPEED BATTERY LIMIT Design Manager
DARIO FRANCESCATTI
UNDERGROUND LOW VOLTAGE ROUTING Program Manager
N.4 LV PIPES ∅160mm (LOW VOLTAGE SERVICE) CARLO ANDREONI
Quality Control Reviewer

UNDERGROUND MEDIUM VOLTAGE


ROUTING FOR BALLARD
N.4 MV PIPES ∅200mm

UNDERGROUND LOW VOLTAGE ROUTING


N.4 LV PIPES ∅160mm (LOW VOLTAGE SERVICE)
MEDIUM VOLTAGE PIT FOR RDD Revisions
UNDERGROUND LOW VOLTAGE ROUTING 1200x1200x1200mm No. Date Description

TYPICAL FOR ENTIRE RUN


N.9 LV PIPES ∅160mm (LOW VOLTAGE SERVICE)

UNDERGROUND LOW VOLTAGE ROUTING


N.12 LV PIPES ∅160mm (LOW VOLTAGE SERVICE)

UNDERGROUND MEDIUM VOLTAGE ROUTING FOR RDD


N.2 MV PIPES ∅200mm
MIN. 1800mm DISTANCE BETWEEN RUNS UNDERGROUND LOW VOLTAGE ROUTING
N.12 LV PIPES ∅160mm (LOW VOLTAGE SERVICE)

UNDERGROUND LOW VOLTAGE ROUTING


N.12 LV PIPES ∅160mm (LOW VOLTAGE SERVICE)

H 08/04/2022 GC Site Coordination - LV cable size of PNL01


G 28/01/2022 IFC DRB1 – AUA CHANGES
F 28/05/2021 Final IFC including DCN10
E 29/04/2021 Final IFC including
DCN03-DCN04-DCN06-DCN07-DCN09
D 19/03/2021 FINAL IFC
C 26/02/2021 IFC
B 12/02/2021 90% DESIGN REVIEW
A 15/01/2021 60% DESIGN REVIEW

Registration

Key Plan

TRUE NORTH

COLO1

3 1

ADMIN
4 2

Bar Code

Sheet Title/Number

ELECTRICAL OVERALL
SITE ROUTING PLAN

MIL02-E-C-01-0
0 12500 25000 37500 50000 mm

SCALE 1 : 500

ALL VERTICAL DIMENSIONS ARE RELATIVE TO ASSOCIATED BUILDING SLAB LEVEL.