0% found this document useful (0 votes)
2K views1 page

Pneumatic Press Maintenance Record

This document is a preventive maintenance record for a pneumatic press machine that lists monthly and six-monthly maintenance check points. It includes oiling different parts, greasing, inspecting electrical connections, and ensuring screws and clamps are properly tightened. The record tracks maintenance tasks from April 2021 through March 2022 so the machine's performance and safety can be monitored over time.

Uploaded by

Virendra Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views1 page

Pneumatic Press Maintenance Record

This document is a preventive maintenance record for a pneumatic press machine that lists monthly and six-monthly maintenance check points. It includes oiling different parts, greasing, inspecting electrical connections, and ensuring screws and clamps are properly tightened. The record tracks maintenance tasks from April 2021 through March 2022 so the machine's performance and safety can be monitored over time.

Uploaded by

Virendra Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
  • Maintenance Record

METAL TRIM

Preventive Maintenance Record


Machine: Pneumatic Press Machine Maintenance
card No.:
M/C. No. Date:
Monthly Maintenance checks list (Date to be recorded)
No. Maintenance check points Equipments/Material Apr May Jun Jul- Aug- Sep- Oct Nov Dec- Jan Feb- Mar Remarks
required -21 -21 -21 21 21 21 -21 -21 21 -22 22 -22
1 Oiling diff parts Oil
2 Electric connection Manually
3 Clamping Tools Manually
4 Greasing Grease
5 Locking Screw Manually

Six monthly maintenance checks list (Date to be recorded)


No. Maintenance check points Equipments/Material Apr May Jun Jul- Aug- Sep- Oct Nov Dec- Jan Feb- Mar Remarks
required -21 -21 -21 21 21 21 -21 -21 21 -22 22 -22
1 Slider Inspection Manually
2 Checking of all electrical Tester
connection

QF/MAINT/03/00/01.04.2021 Page 01 of
02

You might also like