MR 000 010 - VDRL
MR 000 010 - VDRL
See Design Work Instructions (014063879) for additional information pertaining to the use of the VDRL
NOTE: the separate XXXXX worksheet provides instructions to the vendor in producing the Vendor Technical Document
Commitment List
Structure
The VDRL spreadsheet has three sets of columns:
1. The VDRL itself: which specified documents and submittal requirements. This is completed by TransCanada or its en
contractors for requisitions and POs.
2. The Vendor Technical Document Commitment List: provides the vendor an area to fill in the document numbers and
documents that will be submitted. The submittal date for each document is automatically calculated based on the PO d
anticipated test and ship dates. Instructions for the vendor on how to accomplish this, along with other document con
requirements, is described in the Vendor Technical Document Submittal Requirements (EDMS No. 007395116) templat
3. Typical Design Team Reviewers (A, B, C, D or X) or DOT reviewers (A, B, C, D): Indicates which disciplines typically rev
documents. The "Design Team" would be the party responsible for detailed review of documents (often delegated to a
engineering contractor), in which case the Company may elect to perform an additional "oversight" review on certain d
based on the criticality of the equipment as defined in Engineering Design Work Instructions (CDN-US-MEX) (01406387
Documents warranting Company review are highlighted by an asterisk (*) in the "Review Locale" column of the VDRL. T
columns are normally hidden and are not intended for use by a vendor.
4. Equipment, Packaged Item or Specialty Item Preselects: Provides a brief and generic description of the document (n
at the time of this issue) along with the preselects for each item. This section should not be edited and is normally hidd
To fill out the VDRL for requisition or order, complete the steps below referring to the notes that follow.
2. Select
Equipment Type
1. Fill in gene
info
Additional Notes:
1. Ref: Step 1. Confirm office location with the technical document controller. Office location indicates where TransCanada o
both) will review the documents. Submittal locations and methods are clarified in the submittal requirements (see Vendor T
Document Submittal Requirements [007395116]).
2. Ref: Step 2. Choose the type of equipment or material being purchased (or one that best represents what is to be purcha
“Select Equipment Type Below” drop-down menu (near upper left corner of worksheet). Based on the choice made, the tec
that are typically required are automatically noted under the “Selection” column.
3. Ref: Step 3. Browse the selected documents and select or deselect items, as needed, under the “Selection” column.
NOTE: Once an item is manually selected or deselected, the underlying auto-population formula will be overwritten.
4. If you wish to add a new item to the list, replace the "[add as needed-submit Feedback on VDRL]" wording with the docum
wish to add multiple items to the same section, copy and insert the whole row. Update the other columns in the row accord
provide Feedback on the VDRL if your update should be added to the master VDRL template.
5. Ref: Step 5. The "No." part of the "TDS-No" can be renumbered to provide a sequenced list. Note that the VDRL Codes fr
versions of the VDRL is included in a normally hidden field if that is useful for mapping to previously tracking protocols.
6. Ref: Step 6. If you do not wish to see a document for review but want it in the final turnover package, select "Final" as the
review.
7. Ref: Step 9 and 10. See Design Work Instructions (014063879) for additional information pertaining the assignment of cri
8. Minimize (hide) the Vendor Technical Document Commitment List columns, the Typical Design Team Reviewers (A, B, C, D
reviewers (A, B, C, D) columns and the equipment selection column. Ensure any greyed-out columns in the template are hid
NOTE: as far as Company records are concerned, the enduring records should be the O&M Manual, Data Book, possibly draw
native drawing files. Information in the Data Book, MTRs for example, should not be stored independently of the Data Book
column for legacy TDS and VDRL codes that should generally be hidden.
8. Minimize (hide) the Vendor Technical Document Commitment List columns, the Typical Design Team Reviewers (A, B, C, D
reviewers (A, B, C, D) columns and the equipment selection column. Ensure any greyed-out columns in the template are hid
NOTE: as far as Company records are concerned, the enduring records should be the O&M Manual, Data Book, possibly draw
native drawing files. Information in the Data Book, MTRs for example, should not be stored independently of the Data Book
column for legacy TDS and VDRL codes that should generally be hidden.
The PDF version of the VDRL is intended to serve as an uneditable contract document as part of the requisition or purchase
C. Creating an Editable Version of the VDRL for the Vendor Technical Document Commitment List (for PO, optional for Req
Follow these steps to create a native copy of the VDRL for the vendor to update:
1. Save the document with a new filename, perhaps including "Vendor Technical Document Commitment List" as part of the
2. Open the VDRL worksheet and expand the Vendor Technical Document Commitment List section (expand the group to th
Include with Shipment column).
3. Enter the anticipated purchase order date, test date and ship date. Appropriate submittal dates will then automatically ca
Next Submittal Date column.
4. Convert the formulae in the Commitment Log worksheet into values as follows:
a. Select the entire worksheet, right-click in the selected area and click Copy from the ribbon.
b. Select Paste special, then select Values.
5. Click the Selection drop-down menu and filter the cells to display only the values that are blank.
6. Delete all blank document rows (select the rows, right-click and select Delete Rows from the popup menu).
7. Click the Selection drop-down menu and click Select All.
8. Expand all condensed fields and delete all greyed-out columns (including selection drop-down column, equipment pre-se
"Typical Design Team Reviewers [A, B, C, D or X] or DOT reviewers [A, B, C, D]" columns)
9. Ensure the Vendor Technical Document Commitment List section is showing.
10. Read the next two steps, then delete this worksheet.
11. Resave the spreadsheet
12. Ensure a softcopy (native file) of the new commitment list spreadsheet is:
a) incorporated into the material purchase package to be used as part of the purchase order
b) forwarded to the project document controller to facilitate tracking.
ItemID: 14127282 Rev:01
the VDRL
at follow.
1. Fill in general
info
7. Check "Review Locale"
8. Select if required
with proposal
e appropriate
ating
selections for
nd design
w and update
Selection” column.
ll be overwritten.
up menu).
Civil/Structural Engineering
3. The VDRL Code consists of a TransCanada Deliverable Specification (TDS) number followed by an item number. Units (SI, US): SI Dates
Mechanical Engineering
Language: English PO:
Commercial Operations
Regulatory Compliance
Materials Engineering
Electrical Engineering
Test:
Process Engineering
Material Coordinator
Drafting Coordinator
Cathodic Protection
Telecommunication
Ship:
Project Manager
Selection VDRL Document With First Issue for Review Review As-Built Include Include Include with Shipment Vendor Document No. Vendor Document Title Next Submittal Item Generic Description Legacy Air Control Valve Valve Building Contoure Compress Crane Diesel Elec. End Indirect Induction Fittings Flange Mech. Repair Saddle STD. Non-STD. Motor Pipe Spool Pressure Pressure Pressure Process Pump Turbine Exhaust Tank - Tank - Tank - Valve
Stress Analysis
System Design
Geotechnical
Code Proposal Locale Req'd in Data in O&M Date TDS Compre Valve with Actuator - Actuator- Package d Insert or Engine Equipment Closure Fired Wtr Bends Equipment Sleeve Instrument Instrument Regulator Relief Vessel Skid Stack Shop Fab Field Undergro
Construction
Operations
(TDS-No.) Book Manual and ssor/Dr Actuator Electric Gas, Fitting Bath Htr Valve Erected und
Inspection
Welding
VDRL yer Pkg Pneu, Oil Storage
SCADA
Quality
Code
NDE
XX A FINAL SUBMISSIONS A
X A05 ---- O&M Manual Test +3 2C,S O* X B Information and details required to operate and maintain the A001 X X X X X X X X X X X X X X X X X X X X X X X X
X A10 ---- Data Book Test +3 2C,S O* X B B equipment
Drawings, materials, tests, traceability information and certificates A002 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X A15 ---- Shipment Dossier Ship 0 2C,S R as a quality required
Information record ofat
the manufacture
shipment of the installation,
to facilitate equipment or material A003
start-up X X X X X X X X X X X X X X X X X X X X X X X X X X
XX and operation.
XX B GENERAL DOCUMENTS B
XX B05 Project Documents
X B05 -01 VDRL Acknowledgment or Update Request X S O - X B013 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
X B05 -02 Vendor Doc Commitment List (based on VDRL) PO +2 S O X X X X Log consisting of all the technical documents supplied by the B001 X X X X X X X X
Vendor along with their VDRL Code, and next submittal dates X X X X X X X X X X X X X X X X X X
X B05 -03 Project Execution Plan PO +2 S O A B002
X B05 -04 Quality Plan PO +4 S O X X X X K001 X X X X X X X X X X X X X X
X B05 -05 Master Document Index PO +2 S O X X X X List of all the drawings within the drawing package, with their B003 X X X X X X X X X X X X X X X
X B05 -06 Production and Delivery Schedule X PO +2 S O* X B X drawings number, and revision number B004 X X X X X X X X X X X X X X X X X X X X X X X X X X
XX
XX B10 Sub-vendor and Supplier Information
X B10 -01 List of Local Service Agents PO +2 S O X Jan 13, 1900 X B014 X
X B10 -01 List of Sub-Vendors and materials (only package) X PO +4 S O X X X B006 X X X X X X X X X X X
XX
XX C PROCEDURES C
XX C05 Manufacturing Procedures
X C05 -01 Manufacturing/Fabrication Procedure PO +4 S O X Jan 27, 1900 A A A A Includes: Fit-up, preheat requirements, NDE, heat treatment, fitting C001 X X X X X X X X X X X
X C05 -02 Weld Procedure Specification (WPS) PO +4 S O* X Jan 27, 1900 X B B B B and socket
Includes: welds,
Weld supports,
process, flange alignment
preparation checks,ofhydrostatic
angle, direction weld , filler, G002 X X X X X X X X X X X X X X X X
X C05 -03 Project Qualified Welding Procedure List / Pressure Weld Procedures PO +4 S O X X X X X test, and special
shielding requirements
gas, purge gas, material, thickness, diameter, preheat G005 X X X
Jan 27, 1900 temperature, and pass locations X X X X X X X X X X X
X C05 -04 Test Procedure (Hydrostatic & Pneumatic) PO +4 S O* X Jan 27, 1900 X B B X C006 X X X X X X X X X X X X
X C05 -05 Painting / Coating Procedure PO +4 S O X Jan 27, 1900 A A A A A C007 X
XX
XX C10 Inspection and Testing Procedures
X C10 -01 Inspection and Test Plan X PO +4 S O* X C X C X X X X X K002 X
X C10 -02 NDE Procedure PO +4 S O* Jan 27, 1900 X B B A X C002 X X X X X
X C10 -03 Leak Test Procedure (only for valves) PO +4 S O Jan 27, 1900 X X C003 X X X X X
X C10 -04 Performance Test Procedure PO +4 S O* X X X B B C011
X C10 -05 Charpy Impact Test Procedure (only for valves) PO +4 S O Jan 27, 1900 A A A X C014
X C10 -06 Custom Feature Test Procedure PO +4 S O X X X Jan 27, 1900 X X X J006 X
X C10 -07 System Test Procedure (FATs, SATs) PO +4 S O* X Jan 27, 1900 X B X B B B C009 X X X
XX
XX C15 Shipping and Installation Procedures
XX NOT APPLICABLE
XX K15 Inspection and Compliance - Regulatory
XX NOT APPLICABLE
Civil/Structural Engineering
Vendor Technical Document Requirements List (VDRL) Form
Mechanical Engineering
Commercial Operations
Regulatory Compliance
Materials Engineering
Electrical Engineering
Process Engineering
Material Coordinator
Drafting Coordinator
Cathodic Protection
Telecommunication
Project Manager
Selection VDRL Document With First Issue for Review Review As-Built Include Include Include with Shipment Vendor Document No. Vendor Document Title Next Submittal Item Generic Description Legacy Air Control Valve Valve Building Contoure Compress Crane Diesel Elec. End Indirect Induction Fittings Flange Mech. Repair Saddle STD. Non-STD. Motor Pipe Spool Pressure Pressure Pressure Process Pump Turbine Exhaust Tank - Tank - Tank - Valve
Stress Analysis
System Design
Geotechnical
Code Proposal Locale Req'd in Data in O&M Date TDS Compre Valve with Actuator - Actuator- Package d Insert or Engine Equipment Closure Fired Wtr Bends Equipment Sleeve Instrument Instrument Regulator Relief Vessel Skid Stack Shop Fab Field Undergro
Construction
Operations
(TDS-No.) Book Manual and ssor/Dr Actuator Electric Gas, Fitting Bath Htr Valve Erected und
Inspection
Welding
VDRL yer Pkg Pneu, Oil Storage
SCADA
Quality
Code
NDE
Requirements for Operations & Maintenance (O&M) Manuals
The O&M Manual describes installation, maintenance, operation, calibration, spare parts and requirements for preservation for future use.
The Data Book contains technical information and records of activities performed by the Supplier. Included documents are evidence of certification;
registration; material composition, integrity and performance tests; and compliance to project, statutory and regulatory requirements.
Spare parts lists identify equipment components and part numbers required for ordering replacement parts in support of safe and reliable operation of the
equipment.