0% found this document useful (0 votes)
179 views11 pages

Komatsu: Checkout Procedure

The document provides a checkout procedure for an Interface Module (IM) installation on various Komatsu models. It includes necessary equipment, installing application code, checking for fault codes, testing IM inputs and outputs by shorting wires or actuating switches to check for state changes being detected by the IM correctly. The 31 step procedure tests things like hydraulic tank level, steering pressure switches, starter operation, transmission position, navigation switch operation and more.

Uploaded by

Jose Zorrilla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
179 views11 pages

Komatsu: Checkout Procedure

The document provides a checkout procedure for an Interface Module (IM) installation on various Komatsu models. It includes necessary equipment, installing application code, checking for fault codes, testing IM inputs and outputs by shorting wires or actuating switches to check for state changes being detected by the IM correctly. The 31 step procedure tests things like hydraulic tank level, steering pressure switches, starter operation, transmission position, navigation switch operation and more.

Uploaded by

Jose Zorrilla
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 11

KOMATSU CHECKOUT PROCEDURE 58D-06-01960

Page 1 of 11

NAME: MACHINE & MODEL:


IM Checkout 830E-5, 930E-5, 730E-10, 930E-5SE
WRITTEN BY: DATE:
J. Robinson 1/22/19

CHECKED BY: DATE:


C. Otten 1/22/19
1 UPDATED U TRUCK PRODUCTION NAMES 9/19/19 0015725 DWS CAO
APPROVED BY: DATE: 0 NEW RELEASE 1/22/19 JAR CAO
DASH DESCRIPTION OF CHANGE DATE ECN BY CK’D
C. Otten 1/22/19
A SIZE MICROFILM

Purpose:
This procedure is used to checkout the IM installation.

Necessary Equipment:
1. This checkout procedure and vehicle wiring schematic.
2. Laptop computer to connect to GE’s WebPTU.
3. Laptop computer with IM Realtime Data Monitor Software installed. This
software can be found on the Komatsu America Extranet:
https://www.komatsuamerica.net/northamerica/.
4. RS232 serial cable with a male DB9 connector on one end and a female
connector on the other end.
5. 3/8-inch nut driver, voltmeter, 3-inch (or longer) jumper wire, 300 to 332-ohm
resistor
6. Connector back-probes.
7. Small flat screw driver. Use the screw driver to gently push in the orange wire
release buttons when removing a wire from a terminal board.

INSTALL THE APPLICATION CODE


Before the Interface Module can be put to work, the application code must be installed.
Application code must be matched to the truck model that the Interface Module is
installed on.

Go to the Komatsu America Extranet: https://www.komatsuamerica.net/northamerica/


to get the necessary files and instructions.

How to use the IM Realtime Data Monitor software:


58D-06-01960

58E-06-08950.doc Page 1 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 2 of 11

Connect a DB9 straight through cable from the serial port on the laptop to the IM Diagnostic
connector in the cab or auxiliary cabinet. The IM must be powered to communicate with the
laptop.

Double click the shortcut to IM Realtime Monitor on the Desktop screen. After the program
runs, a blank window shows up. On the menu select “Select Serial Port” to pick the serial
port used and then select “Start/Stop” to view the data.

CHECK FOR FAULT CODES ASSOCIATED WITH THE INTERFACE


MODULE

Key on, then run the IM Realtime Data Monitor Software and confirm that there are no fault
codes associated with the Interface Module. If any are found, these circuits should be
analyzed to determine the cause of the fault. They should be repaired or, if required, the IM
should be replaced.

INTERFACE MODULE I/O

Use the IM Realtime Data Monitor software to confirm the functionality of all IM inputs and
serial connections. The key switch must be on for all tests below.

CHECK DIGITAL INPUTS TO THE INTERFACE MODULE

1. Hydraulic Tank Level (IM2-k) – Disconnect connector P712 at Hydraulic Tank Level
Sensor. Short pin C to ground momentarily and confirm state change (one to zero).
Reconnect P712.
2. Low Steering Precharge (IM2-W) – This step requires properly pre-charged steering
accumulators. Disconnect one of the Low Accumulator Precharge Switches
momentarily and confirm state change (zero to one). Reconnect switch.
3. Pump Filter Switches (IM2-Y) – Disconnect connector SFSW at Steering Filter
Pressure Switch momentarily and confirm state change (zero to one). Reconnect
SFSW.
4. Park Brake Released (IM2-M) – Short wire 73S to ground at TB33-C momentarily
and confirm state change (one to zero).
58D-06-01960

58E-06-08950.doc Page 2 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 3 of 11

5. Park Brake Request (IM3-V) – Short the engine oil pressure switch wire circuit 36
on TB28-A to ground. Move shift lever from neutral to park position and confirm
state change (one to zero). Remove the ground from TB28-A.
6. GE Batt + (IM3-M) -- confirm this is a one.
7. Starter Motor 1 Energized (IM3-R) – Disconnect wire 11SM1 from cranking motor
to TB28-F at TB28-F. Momentarily short TB28-F to 24V and confirm state change
(zero to one). Reconnect disconnected wire.
8. Starter Motor 2 Energized (IM3-S) – Disconnect wire 11SM2 from cranking motor
to TB28-G at TB28-G. Momentarily short TB28-G to 24V and confirm state change
(zero to one). Reconnect disconnected wire.
9. Crank Sense (IM3-U) – Open the Start Battery Disconnect switch so that there is no
battery voltage to the starters. Momentarily short TB28-J to 24V and confirm state
change (zero to one). After removing 24V short from TB28-J, close the Start Battery
Disconnect switch.
10. Selector Switch (Park) (IM3-T) – Place shifter into park position and confirm 1 state
then shift into neutral and confirm 0 state. Return shifter to park position.
11. Selector Switch (FNR) (IM2-N) – Place shifter into park position and confirm 0 state
then shift into neutral, forward, and reverse and confirm 1 state for each of these
positions. Return shifter to park position.
12. Steering Bleed Pressure Sw (IM2-Z) – Disconnect connector BLDPS at the Steering
Bleed Pressure Switch and confirm state change (zero to one). Reconnect BLDPS.
13. Brake Lock Switch Power Supply (IM3-L) – Ensure that shifter is in park position.
Use GE’s WebPTU software to turn on FWD True output signal. Confirm state
change (zero to one).
14. Brake Lock (IM2-i) –Actuate brake lock switch and confirm state change (zero to
one). Turn off GE FWD True signal. Confirm input state remains at one. Turn off
brake lock switch. Confirm input state returns to zero. (The Brake Lock Switch
Power Supply test, item 13, must be completed before this test can be successfully
completed.)
15. Service Brake Set sw (IM3-C) – Short wire 44R at TB35-F to 24 volts momentarily
and confirm state change (zero to one).
16. Cummins Shutdown Delay (IM3-F) – Disconnect wire 21NSL-001 from the
Cummins ECM at TB27-E1, leaving wire 21NSL-003 to IM connected at TB27-E2.
Momentarily short TB27-E to 24V and confirm state change (zero to one).
Reconnect disconnected wire.
17. Secondary Engine Shutdown sw (IM3-E) – Actuate the Secondary Engine
Shutdown switch and confirm state change (one to zero).
18. Keyswitch (IM3-G) – confirm state is a one.
19. Mode sw1 (IM3-H) – Actuate the “left arrow” LCD screen navigation switch and
confirm state change (one to zero).
58D-06-01960

20. Mode sw2 (IM3-J) – Actuate the “OK” LCD screen navigation switch and
confirm state change (one to zero).

58E-06-08950.doc Page 3 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 4 of 11

21. Mode sw3 (IM3-K) – Actuate the “down arrow” LCD screen navigation switch and
confirm state change (one to zero).
22. Mode sw4 (IM2-q) – Actuate the “up arrow” LCD screen navigation switch and
confirm state change (one to zero).
23. Crank Request (IM2-j) – Open the Starter Disconnect switch so that there is no
battery voltage to the starters. Momentarily turn keyswitch to the crank position
and confirm state change (zero to one).
24. Park Brake Set (IM2-f) – Momentarily disconnect Park Brake Pressure switch,
identified by circuit 33, and confirm state change (zero to one).
25. Seat Belt sw (IM2-g) – Buckle seat belt. Then unbuckle seat belt and confirm state
change (zero to one).
26. Snapshot In-Progress (IM2-L) – Actuate the Data Store Switch. Confirm state
change (one to zero).
27. Low Steering Pressure sw1 (IM2-S) – Using a back-probe, short wire 33F to ground
at connector J14 pin 6 momentarily and confirm state change (one to zero).
Remove back-probe.
28. Brake Accum Pressure sw (IM2-U) –Momentarily short wire 33BP to ground at
TB32-E. Confirm state change (one to zero).
29. Brake Lock Degrade sw (IM2-V) – Short wire 33T to ground at TB32-F momentarily
and confirm state change (one to zero).
30. Keyswitch Direct (IM2-P) – Confirm state is a one. Turn keyswitch off for 1 second
and then back on. Confirm state changes to zero and then back to one.
31. Auto Lube Level (IM3-W) – Disconnect connector J511 at the Auto Lube Low Level
Switch, short pin C to ground momentarily and confirm state change (one to zero).
Reconnect connector J511.
32. Auto Lube Press sw (IM3-Y) – Short wire 68 to ground at TB35-W momentarily and
confirm state change (one to zero).
33. Body Up sw (IM2-R) – For trucks without a body installed yet, place washer on
body proximity sensor, confirm state change, them remove washer and confirm
state change again. For truck with body installed, make sure that the body is
lowered down all the way, and then momentarily disconnect wire 71F at TB35-S1
and confirm state change (one to zero). Reconnect disconnected wire.
34. Dynamic Retard (IM3-Z) – Momentarily short wire 74ZA to ground at TB21-D and
confirm state change (one to zero).
35. No Propel/Retard (GE CPU Running) (IM2-n) - Confirm state is a zero. Turn off the
GE control power switch. Confirm state changes to a one. Turn GE control power
switch back on. Confirm state changes to a zero once GE is booted back up (see
VID panel), which can take up to 45 seconds.
36. Engine Air Filter (IM2-X) – Unplug Air Restriction Switch 2 (located on top of the
engine air intake pipe) and confirm state change (zero to one). Reconnect Air
58D-06-01960

Restriction Switch 2.

58E-06-08950.doc Page 4 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 5 of 11

37. Shifter Fault (IM2-m) – Disconnect wire 72IM from TB22G and confirm state change
(zero to one). Reconnect wire 72IM.

*AUTONOMOUS TRUCKS ONLY*


CHECK AUTONOMOUS INPUTS TO THE INTERFACE MODULE
1. & 2.) Autonomous & Manual Mode switch (IM2-e, IM2-s) - Put the
autonomous/manual mode switch in manual mode. The position is indicated by a 0.
The position that the mode switch is not in is indicated by a 1. Only one of the inputs
can be 1 at any given point, the other one must be the opposite. Then switch to
autonomous mode and confirm opposite states on the inputs and wait 30 seconds.
Finally, switch back to manual mode and confirm state change. Make sure no fault
codes are created when shifting between modes.
3.) Manual Mode Auto Apply Pressure switch (IM2-d) - With the autonomous/manual
mode switch in manual mode, disconnect wire from TB51-E and confirm change on (0
to 1). Fault A335 should show at that point. Reconnect disconnected wire and confirm
state change (1 to 0).

CHECK ANALOG INPUTS TO THE INTERFACE MODULE

Verify that the used analog inputs are in the range of the values listed below.

1. Steering Pressure [kPa] (IM3-d): Disconnect steering pressure sensor, identified by


circuit 33SP, and confirm fault A204, Steering Pressure Sensor Low, is active.
Reconnect sensor.
2. Ambient Air Temp [C] (IM3-e): confirm reported temperature matches ambient
temperature within 3 C.
3. Fuel Level [%] (IM3-g): confirm reported % level matches actual fuel level in tank
+/- 5%.
4. 12V Converter [V] (IM3-h): confirm reported voltage is 13.5V +/- 0.5V. (24V Battery
voltage must be greater than 18 volts.)
5. Brake Pressure [kPa] (IM3-p): Disconnect service brake pressure sensor located in
brake cabinet, identified by circuit 33BPS, and confirm fault A205, Brake Pressure
Sensor Low, is active. Reconnect sensor.
6. Hyd Tank Oil Temp [C] (IM3-m) (830E-5 and 730E-10 only): Disconnect hydraulic
tank oil temp sensor and confirm fault A103, Hydraulic Oil Temp - Tank Sensor
Low, is active. Reconnect sensor.
58D-06-01960

58E-06-08950.doc Page 5 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 6 of 11

7. Right Rear Brake Oil Temp [C] (IM3-m) (930E-5 and 930E-5SE only): Disconnect
right rear brake oil temp sensor and confirm fault A167, Hydraulic Oil Temp – Right
Rear Sensor Low, is active. Reconnect sensor.
8. Left Rear Brake Oil Temp [C] (IM3-i) (930E-5 and 930E-5SE only): Disconnect left
rear brake oil temp sensor and confirm fault A166, Hydraulic Oil Temp – Left Rear
Sensor Low, is active. Reconnect sensor.
9. Right Front Brake Oil Temp [C] (IM3-r) (930E-5 and 930E-5SE only): Disconnect
right front brake oil temp sensor and confirm fault A169, Hydraulic Oil Temp –
Right Front Sensor Low, is active. Reconnect sensor.
10. Left Front Brake Oil Temp [C] (IM3-t) (930E-5 and 930E-5SE only): Disconnect left
front brake oil temp sensor and confirm fault A168, Hydraulic Oil Temp – Left Front
Sensor Low, is active. Reconnect sensor.
11. Hoist Pressure 2 [kPa] (IM3-q) (830E-5, 930E-5, and 930E-5SE only): Using a back-
probe, short wire 33HP2 to ground at J16 pin 6 momentarily and confirm fault
A203, Hoist Pressure 2 Sensor Low, is active.
12. Hoist Pressure 1 [kPa] (IM3-s): Using a back-probe, short wire 33HP1 to ground at
J16 pin 32 momentarily and confirm fault A202, Hoist Pressure 1 Sensor Low, is
active.
13. Battery Voltage 24V [V] (IM1-A, F): confirm reported voltage is +/- 1 volt of actual
measured battery voltage.

CHECK SERIAL INTERFACES TO THE IM


1. Proper operation of the serial interfaces to the IM is assured if faults A184, A233,
A237, and A257 are not active.

CHECK OUTPUTS FROM THE INTERFACE MODULE

Note: Before performing these next steps, the key switch must be turned off for
at least 7 minutes to allow the IM to completely shutdown. Confirm that the IM
has shutdown by verifying that the green LED on the IM controller has stopped
flashing. While performing the following IM output checks, ensure that no
output short circuit fault codes are reported by the IM Realtime Data
Monitor software.
58D-06-01960

58E-06-08950.doc Page 6 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 7 of 11

1. Park Brake Solenoid output (IM1-E), Brake Auto Apply output (IM1-R). Short the
engine oil pressure switch wire circuit 36 to ground on TB28-A. Key on and shift
into neutral. Confirm that park brake solenoid is energized by verifying that coil is
magnetized. Use the GE VID panel to set the truck speed to a speed above 1 kph.
Shift into park. Confirm that the park brake solenoid remains energized. Reduce
the truck speed to 0 kph. Confirm that the park brake solenoid de-energizes.
Remove the ground from TB28-A.
2. Start Enable output (IM1-B). Disconnect wire 21PS-006 from TB28-H1. Place shifter
in park and confirm that circuit 21PS on TB28-H is 24 volts while cranking. Place
shifter in neutral and confirm that circuit 21PS on TB28-H is 0 volts while cranking.
Reconnect wire 21PS-006.
3. IM On Signal (IM1-K). With keyswitch on, confirm voltage on circuit 110NS at
TB35-T is approximately 0 volts.
4. Red Warn output (IM1-G), Sonalert output (IM1-M). Disconnect the IM from the
CAN/RPC network by unplugging its T-connection to the network then confirm the
following on the dash panel:
a. all status panel indicators flash on/off
b. the red warning indicator flashes on/off
c. two separate audible alarms can be heard sounding on/off
d. a loss of communications message is displayed on the speedometer
e. the needles in all the gauges are moving through their entire range of
motion
Reconnect the IM to the CAN/RPC network.
5. Steering Bleed Down Solenoid output (IM1-P). Confirm steering bleed down
solenoid is de-energized. Turn key switch off and confirm that steering bleed down
solenoid is energized by verifying that coil is magnetized.
6. Auto Lube Solenoid output (IM1-T) Remove wire 68-006 from TB35-R2. Using the
dash display panel, select manual lube. Confirm that circuit 68 on TB35 is 0 volts.
Reconnect wire 68-006.

58D-06-01960

58E-06-08950.doc Page 7 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 8 of 11

S/N ___________________
IM Installation Checkout Checklist

Function Description Expected Result Result (OK/Fail) Comments


DIGITAL INPUT CHECKS:
1 - Hydraulic Tank 1 to 0
Level input
2 - Low Steering 0 to 1
Precharge input
3 - Pump Filter Switches 1 to 0
input
4 - Park Brake Released 1 to 0
input
5 - Park Brake Request 1 to 0
input
6 - GE Batt + input 1

7 - Starter Motor 1 0 to 1
Energized input
8 - Starter Motor 2 0 to 1
Energized input
9 - Crank Sense input 0 to 1

10 - Selector Switch 1 to 0
(Park)

11 - Selector Switch 0 in Park, 1 in Forward,


(FNR) Neutral, and Reverse

12 - Steering Bleed 0 to 1
Pressure input
13 - Brake Lock Switch 0 to 1
Power Supply input
58D-06-01960

58E-06-08950.doc Page 8 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 9 of 11

Function Description Expected Result Result (OK/Fail) Comments


14 - Brake Lock input 0 to 1

15 - Service Brake Set 0 to 1


input
16 - Cummins 0 to 1
Shutdown Delay input
17 – Secondary Engine 1 to 0
Shutdown input
18 – Key switch input 1

19 - Mode switch 1 1 to 0
input
20 - Mode switch 2 1 to 0
input

21 - Mode switch 3 1 to 0
input

22 - Mode switch 4 1 to 0
input

23 - Crank Request 0 to 1
input
24 - Park Brake Set 0 to 1
input
25 – Seat Belt switch 0 to 1
26 - Snapshot input 1 to 0

27 - Low Steering 1 to 0
Pressure switch input
28 - Brake Accumulator 1 to 0
Pressure switch input
29 - Brake Lock 1 to 0
Degrade switch input
30 – Key switch Direct 1 to 0 to 1
input
31 - Auto Lube Level 1 to 0
switch input
32 - Auto Lube Pressure 1 to 0
switch input
58D-06-01960

58E-06-08950.doc Page 9 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 10 of 11

Function Description Expected Result Result (OK/Fail) Comments


33 – Body Up switch w/o body 0 to 1 to 0
input with body 1 to 0
34 – Dynamic Retard 1 to 0
input
35 – No Propel/Retard 0 to 1 to 0
input (GE CPU
Running)
36 – Accessory Drive 1 to 0
Pump Filter Switch
37 - Engine Air Filter 0 to 1
38 - Shifter Fault 0 to 1
ANALOG INPUT
CHECKS:
1 - Steering Pressure fault A204

2 - Ambient Air Temp ambient temp +/- 3C

3 - Fuel Level tank level +/- 5%

4 - Converter Voltage 13.5 +/- 0.5V


(12V)
5 - Brake Pressure fault A205

6 - Right Rear Brake Oil fault A167


Temp (930E-5 and
930E-5SE only)
7 - Left Rear Brake Oil fault A166
Temp (930E-5 and
930E-5SE only)
8 - Right Front Brake fault A169
Oil Temp (930E-5 and
930E-5SE only)
9 - Left Front Brake Oil fault A168
Temp (930E-5 and
930E-5SE only)
10 – Hoist Pressure 2 fault A203
(830E-5, 930E-5, 930E-
5SE only)
11 – Hoist Pressure 1 fault A202
58D-06-01960

58E-06-08950.doc Page 10 of 11
KOMATSU CHECKOUT PROCEDURE 58D-06-01960
Page 11 of 11

Function Description Expected Result Result (OK/Fail) Comments


12 – Battery Voltage measured battery voltage
24V +/- 1V
13 – Hyd Tank Oil fault A103
Temp (830E-5 and
730E-10 only)

SERIAL COMM
CHECKS:
1 - CAN/J1939, Drive no fault A184, A233, A237,
System CAN/RPC, A257
Display CAN/RPC,
Payload CAN/RPC,
OUTPUT CHECKS:
1 - Park Brake Solenoid energized/de-energized

2 - Start Enable output 24 V, 0 V

3- IM On Signal output 0V

4 - Electronic Dash Items 4a-e function as


Panel check described
5- Steering Bleed Solenoid de-energized then
Solenoid output energized

IM Software Version Number: _________________________________________

Completed By: _________________________________________ Date: _______________________