SPECIFICATION MATERIAL OF MULIA RAYA AGRIJAYA - COLD STORAGE rev.
0
I SPESIFIKASI UMUM GENERAL SPECIFICATION
a. Lokasi Lahan Location
b. Luas Lahan Area : 20,038 M
2
c. Ukuran Warehouse Warehouse Size : 79,2 X 114 M
d. Luas warehouse Gross Floor Area (GFA) : 9,388.88 M
2
e. Koefisien Bangunan Coverage Building Area (CFA) : 9,751.83 M
2
f. Jumlah Lantai Floors : 2 Lantai
g. Tinggi Bangunan Building Height : 15,3 M
i. Tinggi Racking Racking Height : 8 - 9 Level /Tier
j. Tinggi Loading Dock Loading Dock Height : 1,2 M
II ARSITEKTUR
A. WAREHOUSE/ COLD STRAGE
Finishing lantai Warehouse type F1 :
a. Floor Finish : Epoxy 2000 mikron
(Charging Room)
Finishing lantai Warehouse type F2 :
b. (Anteroom/Cold Storage/ Chiller Room/ : Liquid Floor Hardener
Utility/ Machine Room/ Storage/Corridor)
c. Dinding Warehouse / cold Storage Wall finish - Type -W1 : Sandwich Panel (PU/PIR) 150mm Thk. Bondor / Zeltech Panel
- Type-W2 : Sandwich Panel (PU/PIR) 100mm Thk. Bondor / Zeltech Panel
- Type W3 : Metal Cladding Corrugated 0.40 mm Thk. Fumira/ BMB
- Type W4 : AAC Block / Bata Ringan 150mm Thk. Thermoblock
- Type W5 : Concrete Ventilation Block / Roster
d. Plafon Ceilings - Type -C1 : Sandwich Panel (PU/PIR) 150mm Thk. Bondor / Zeltech Panel
- Type-C2 : Sandwich Panel (PU/PIR) 100mm Thk. Bondor / Zeltech Panel
- Type-C5 : Metal Cladding Corrugated 0.35 mm Thk. Fumira/ BMB
e. Penutup Atap Roof : Metal Corrugated 0,45mm Thk. Fumira/ BMB
f. Insulasi Atap Roof Insulation : Insulation Aluminium Bubble foil 4mm thk. Zeltech
g. Talang / Gutter : FRP (Fibre Reinforce Plastic) 3mm Thk.
h. DownSpout : Pipa PVC Aw Type ø 8" Wavin
i. Pintu Anteroom/ Chiller/ Cold storage :
- Sectional Door type SC-1 ( 3x3 M) : 15 unit + Dock Shelter
type SC-2 ( 3x5 M) : 3 unit
- Horizontal Sliding Door type SD-1 (2,5x5M) : 20 unit
- Rapid/ Shutter Door type RP-1 (2,5x5M) : 2 unit
- Pintu Emergency Emergency Door : Sandwich Door + Panic bar
j. Dock Leveler :type Hydrolic / (L)6"x(W) 8" / Cap : 6 Ton ~5 Nos
: Rubber bumper Kakada Pratama
k. Tangga / Railing : Baja / Bordes Platform, Pipa finsih cat
B. OFFICE
a. Finishing lantai Office/Mess/Security/Lab : Granite Tile 600x600/ ceramic 300x300 Roman
b. Dinding Office : Bata Ringan / AAC Block 100mm Thermoblock
c. Plafon : Gypsum Board 9mm finish cat emulsion Jayaboard
d. Pintu Utama : Alumunium + Kaca / Frame less tebal 12mm tempered
e. Pintu Dalam : Panel / Engineering door Superdoor
f. Pintu Toilet : WPC (Wood Plastic Compisite) Superdoor
g. Jendela : Alumunium casement / Swing Alexindo
h. Dinding Toilet : Ceramic 300x600 Roman
i. Lantai Toilet : Ceramic 300x300 Roman
j. Plafon Toilet : Kalsiboard 6mm KALSIBOARD
k. Sanitary : Ex. Toto (Standart) Toto
I. Hardware Pintu & Jendela : Ex Dekson
m. Waterproofing Toilet : Coating SIKA
n. Cat Dinding : Exterior / Interior Dulux ICI Paint/ Mowilex
C. PUMP ROOM & GWT
a. Finishing lantai : Liquid Floor Hardener Roman
b. Dinding : Bata Ringan / AAC Block 100mm Thermoblock
c. Plafon : Expose Jayaboard
d. Pintu : Baja
e. Lovre : Metal Zincalume Superdoor
f. Waterproofing : Integral / Coating Superdoor
g. ladder : Stainless Steel
h. Mainhole : Rangka baja / platform bordes
i. Cat Dinding : Exterior / Interior Dulux ICI Paint/ Mowilex
III S I P I L / INFRASTRUKTUR
a. Cut & Fill, Stripping Lahan
b. Saluran Perimeter / Sekeliling : U-Ditch Precast
c. Jalan & Parkir : Beton Rigid 2Ton/m²
d. Beton Decker : Beton
e. Pintu / Gate : Sliding Manual, hollow steel fin. Paint .
V STRUKTUR BANGUNAN
a. Pondasi bangunan utama Tiang pancang sistem tekan/ pressure ( hydrolic hammer),
- tiang pancang 20 x 20 cm, L = 17 m Daya Dukung = 26 ton
- tiang pancang 25 x 25 cm, L = 17 m Daya Dukung = 36 ton
- tiang pancang 30 x 30 cm, L = 17 m Daya Dukung = 60 ton
( Laporan Penyelidikan Tanah KKKB FTSP USAKTI , Juni 2012)
b. Pekerjaan struktur lainnya, Spsifikasi beton fc' 35 Mpa
( slab lantai, pile cap, balok dan kolom beton)
- slab lantai - area penyimpanan ( chilller, etc). • wearing slab/ topping 150 mm
superimposed load = 5 ton/m2 LL • insulation/ pu slab 150 mm
• concrete base slab 250 mm
• condensation pipe f 4"
- area anteroom • concrete slab 200 mm
superimposed load = 2 ton/m2 LL
- kolom pedestal tiang baja h = 1200 mm
- mezanine - mezanine office & light storage ( + 7.00) • kolom beton 800 x 800 ( TOC +7.40)
superimposed load = 479 kg/m2 LL + 150 kg/m2 SDL • balok induk 500 x 1000 , balok anak
( SDL : floor finish + M/E) 400 x 700
• plat beton lantai 150 mm
- mezanine machine room ( + 6.00) • kolom beton 700 x 700 ( TOC +6.40)
superimposed load = 800 kg/m2 LL + 150 kg/m2 SDL • balok induk 500 x 900 , balok anak
( SDL : floor finish + M/E) 400 x 700
• plat beton lantai 150 mm
c. Pekerjaan skonstruksi baja dan atap Konstruksi baja u/ kolom dan rangka atap PEB system
SM - 490 ( fy 345 MPa )
Purlin & girt G - 450 ( fy 450 Mpa
Painting ( 2 coats / Alkyd primer + finish)
Bolts Grade 8.8 primary & grade 4.6
secondary connection
Anchor bolts Grade SR-24 plain finished