4800 4800 6000 6000 6000 6000 6000 6000 4800 4800
A A
1A
DH-03-02 DH-03-03
Escalera 4.3 Sala de válvulas 2.1
STAIRS 4.3 ZONE VALVE ROOM 2.1
17 m² 7 m²
6000
T DH-03-10 DH-03-11
T
TR.R-01 DH-03-08 DH-03-09
Pi Pi Pi Pi
Cable BB1. 2.08 SR SR SR SR
7 m. bandeja 0 m² 1 m² 2 m²
1B 1 m²
H
T
LEGEND
B SYMBOL DESCRIPTION B
693,77
UNIT CONTROL
1,7%
FG-NET
SATELLITE DEVICE
FG-BBOX
695,82
WATER CABLE DERIVATION BOX
CONNECTION CABLE
18000
DH-03-07
Pi END PLUG
SR
1 m² FLOOR WATER DETECTION CABLE
AERIAL TRAY WATER DETECTION CABLE
WATER POINT SENSOR
DH-03-01
FLOOR BUS CABLE
Escalera 4.1
C STAIRS 4.1
19 m²
Unit Control C
DH-03-06
FG-NET AERIAL TRAY
Satelite Device
Pi FG-BBOX
SR FLOOR BUND
1 m²
TRUNKING CONDUIT
L BB1
DH-03-05
1C Montacargas
GOODS LIFT
13 m²
3330
Aerial Tray galvanized steel 3D Model Detail
4500
694,27
DH-03-04
Montacargas
GOODS LIFT
13 m²
3330
1D
D D
695,82
3950
1,5%
18000
E E
AB02 01/02/23 LC AB -As Built
C01 31/01/22 JG A1 - For construction
P05 05/07/21 JG Updated project design changes July 1st, 2021
P04 03/06/21 JG Updated project design changes May 31th, 2021
P03 22/04/21 JG Updated with the scope reductions
P02 25/03/21 JG Updated revision marks March 25th, 2021
P01 16/03/21 JG Updated revision marks March 15th, 2021
TR.R-02 Rev. Date. Drawn Description
Cable BB1. 2.23 REVISIONS SCHEDULE
7 m. Bandeja
CLIENT CONTRACTOR
NAME: DATE:
DRAWN: LMG 05/03/21
1E
DESIGNED: LMG 11/01/23
REVIEWED: LMG 01/02/23
PURPOSE OF ISSUE
F PROJECT F
AB - As Built
Equinix MD3
6000
ZONE SUBDISCIPLINE - DRAWING
-ENG-07-00
MD3.1 Data Hall Roof leak detection system (Aerial)
MD4 ANC
REV
MD3.1 MD3.2 FILE NAME
AB02
MD031-TTK-ZZ-02-DR-M-AUXL-1006 SCL.
1/100