Complex Inbound Process With VAS Using POSC Approach
Complex Inbound Process With VAS Using POSC Approach
approach
Scenario- I have defined four inbound doors for the unloading purpose. I have defined four bins in the
inbound staging area. I have defined a deconsolidation work center for the unpacking and repacking
activity. I have defined VAS work center for the labelling and repackaging activity. I have defined three
products in the purchase order. I have defined STSS criteria for the three products. I have defined door
determination in the system.
When we receive products from vendor then first unloading happened at one of the door.HU is moved
from door to inbound staging area. HU is further moved from inbound staging area to deconsolidation
work center for unpacking and repackaging activity. HU is now moved from deconsolidation work center
to VAS work center for repackaging and labelling activities. After the completion of activities at VAS
work center then HU are moved to their respective destination bins as per the STSS criteria.
Path
1|Page
Define product group types
2|Page
Assigning product group types and product group to the product master using /n/sapapo/mat1
3|Page
Similarly for remaining two materials.
4|Page
Path
5|Page
Define work center
6|Page
Assigning bin to VAS work center using /n/scwm/tworkst
7|Page
Path
8|Page
Define process-oriented storage control
9|Page
Path
10 | P a g e
This is one time activity.
11 | P a g e
Path
12 | P a g e
Define general packaging specification parameters
13 | P a g e
Path
14 | P a g e
Define element type
15 | P a g e
Define work step type
16 | P a g e
Assign packaging material type to element type
17 | P a g e
Assign level set in the packaging specification group
18 | P a g e
Define condition tables
19 | P a g e
Define condition types
20 | P a g e
Create condition maintenance group
21 | P a g e
Define packaging specification (/n/scwm/packspec) for all the three products
Enter packaging specification group and press enter and click on display icon.
22 | P a g e
Enter packaging material and target quantity.
If we miss anything then we can create a 2nd version and do the necessary changes and activate +save
again.
Copy and create packaging specification for the remaining two materials.
23 | P a g e
Note- We can download the excel for template and upload in the program for the mass creation of the
packaging specification.
T Code-/N/SCWM/IPU
We can use these t codes (/n/scwm/actlog or SLG1) for checking the logs.
Business Process
24 | P a g e
25 | P a g e
Checking inbound delivery using /n/scwm/prdi
Check for all the three-line items that packaging specification is determined automatically or not.
26 | P a g e
Check also that the system created VAS order automatically or not by checking the form view of each of
the three-line items.
27 | P a g e
VAS work center is not determined automatically by the system due to a bug in the system. So, I am
assigning this manually.
Select each line item and open form view. Click on change icon and enter work center and click on save
icon.
28 | P a g e
Create warehouse task in the background using /n/scwm/mon
29 | P a g e
Confirm warehouse task
30 | P a g e
Creating three HU for each product using /n/scwm/dcons
31 | P a g e
Complete process step for all the three HU
32 | P a g e
Confirm all the three warehouse tasks created for movement of HU from deconsolidation work center to
VAS work center.
Repeat the same steps for all the materials and click on save.
33 | P a g e
Note- VAS activities can only be performed through Fiori or GUI transactions but not through RF
transactions.
34 | P a g e
Close all the three HU.
35 | P a g e
Checking log in SMQ2 against the LE delivery number
Click on execute
36 | P a g e
Activate your error
37 | P a g e
Checking status and document flow in the inbound delivery
38 | P a g e
39 | P a g e