Chen, F., Wan, H. y Lee, W. (2006).
Applying lean concepts to supply chains:the power from
effective partnership [diapositivas]. Recuperado de la base de datos de UESAN (037805)
Applying Lean Concepts to Supply Chains:
The Power from Effective Partnership
Lean Supply Chain Lean Consumption
Lean Enterprise
Lean Management
Lean
Manufacturing
Customer
Manufacturing
Floor
Purchase Use Warranty Repairs Disposition
Entire Company
Immediate Supply Chain Complete Customer Experience (Lean Consumption)
Extended Supply Chain
F. Frank Chen
John Lawrence Professor of Manufacturing Systems Engineering
Leonardo Rivera, Ph.D. Candidate & GRA
Hung-Da Wan,
Wan Ph.D. Candidate & GRA
Woo Min Lee, URA
Grado Department of Industrial and Systems Engineering
Virginia Tech
June 21, 2006
The main points of this presentation are:
Introduction The motivation for this presentation
Driving Supply Where and how Lean Thinking and
Chains toward Supply Chain Management converge
Leanness
Building Blocks of Basic Components of Lean Supply
Lean Supply Chain Chains
Challenges for LSC Obstacles for companies building a Lean
Implementation Supply Chain
Ideas for the Future Next wave of developments
Conclusions What we have learned
2
Introduction
• Supply Chain Management (SCM) vs.
Lean Thinking
– SCM creates great network of companies
– Lean Thinking is effective in various
industries
– Next Step: Extend lean principles to the
whole supply chain
• Lean Supply Chain
– Integrates activities of all companies in the
network as a unified entity to provide end
customers with “offer of value”
• You will learn:
– How does lean thinking work with SCM?
– How to build a lean supply chain?
– What is the future of lean supply chains?
Driving Supply Chains toward Leanness
• Section Overview
– Lean thinking has significant impact on various
Introduction
industries.
– Lean implementation in an individual company is Driving Supply
Chains toward
constrained by business partners. Leanness
– Lean Supply Chain is a new opportunity for further
improvement in each of the individual companies Building Blocks of
Lean Supply Chain
and in overall supply chain.
Challenges for LSC
Implementation
• In this Section
– The Power of Lean Thinking Ideas for the Future
– Applying Lean Thinking in Supply Chain
Conclusions
Management
– Building a Lean Supply Chain
4
Historical Evolution of Lean Manufacturing
The Root:
• Henry Ford’s Highland Park manufacturing plan in
1913
– Interchangeable parts, standard work and assembly
flow line
The Best Learner:
• Kiichiro Toyoda & Taiichi Ohno from Toyota after
WWII
– Learned, adapted, and improved the Ford’s vision
– Established the Toyota Production System
The Interpreters:
• Womack, Jones and others from MIT
– The Machine that Changed the World (1990)
– Lean Thinking (1996)
– And more…
5
Principles of Lean Manufacturing
Lean Thinking (Womack & Jones, 1996)
• Let customers identify Value
Companies provide what customers really want
A product is not just an object, but a whole experience
• Identify the Value Stream
Value Stream: Sequence of all activities and resources
required to bring a product to customers
• Flow
Creates smooth and uninterrupted flow for products
• Pull
Operations are performed when needed, not before
• Perfection
Continuous improvement is a way of life
6
Implementation of Lean Manufacturing
Standard
Work
Flexible
Work JIT
Systems
Value Total
Stream SMED Productive
Mapping Maintenance
5S Heijunka
Jidoka
See the Organize the Design and implement Connect with supply
process house improved internal processes and demand
A Typical Lean Implementation Model. (Adapted From Groesbeck, 2005)
Lean Thinking in Supply Chain Management
• Local improvements vs. Global improvements
– Lean implementation is constrained by partners
– Local improvements may not have significant impacts on the whole
supply chain
• Example: Extended Value Stream Map
Process Process
#1 Warehouse #2
Total = 27.5 days
Current Transport: 1.0 day 0.5 day 1.0 day 1.0 day
In Plant: 2.0 day 1.0 day Value- 4505 sec.
State Value-added: 4200 sec 21.0 day 305 sec =
Added (75.1 min.)
Total = 25.6 days
Improved Transport: 1.0 day In Plant: 0.13 day
0.5 day 1.0 day
1.0 day
1.0 day
Value-added: 3950 sec 21.0 day Value- 4255 sec.
Process #1 305 sec =
Added (70.9 min.)
Production Lead Time Decreases 93.5% in Process #1; but Total Delivery Time
Decreases only 6.91%
8
Lean Thinking in Supply Chain Management
• Impacts of Lean Thinking
– Stabilizes supply chain and facilitates
globalization
– Aligns capability/capacity of supply chain
members with customers’ demand
– Delivers significant influence on supply chain
integration
• Pressures urging supply chains to be lean
– Peer Pressure: Lean companies urge non-lean
partners to extend and integrate the Value
Streams for higher level of leanness.
– Top-down Pressure: Supply chain leaders urge
all members to establish collaborative
relationships to eliminate wastes at supply chain
level.
Building a Lean Supply Chain
• The Vision of Lean Supply Chain
Eliminate wastes, shorten lead time, lower
costs, deliver stable quality, and thus
achieve higher customer satisfaction level.
• Defining a Lean Supply Chain
“A set of organizations directly linked by
upstream and downstream flows of
products, services, finances, and
information that collaboratively work to
reduce cost and waste by efficiently
pulling what is needed to meet the needs
of the individual customer.” (Vitasek et al.,
2005)
10
Characteristics of Lean Supply Chains
• Full Collaboration
Foundation of all supply chain integration.
Share gains and responsibilities.
Transparent
• Transparent Information Information
Allow companies to see and align with
customers’ demand. Monitored
Lean
Logistics Performance
• Lean Logistics
Physically carry out lean thinking.
Full
Collaboration
• Monitored Performance
Sustain and improve performance
continuously
11
Procedure to establish a Lean Supply Chain
Select
Select critical
critical Current
Current State
State Current
Current State
State
supply
supply chain
chain Detailed
Detailed Value
Value Overall
Overall Value
Value
members
members Stream
Stream Map
Map Stream
Stream Map
Map
Future
Future Value
Value Timeline
Timeline
Implementation
Implementation Stream
Stream Map
Map Chart
Chart
12
Building Blocks of Lean Supply Chains
Introduction
• Lean Logistics Driving Supply
Chains toward
• Information Technology Leanness
• Performance Measurement and Continuous Building Blocks of
Improvement Lean Supply Chain
• Collaboration beyond Partnerships
Challenges for LSC
Implementation
Corresponds to lean supply chain characteristics.
Ideas for the Future
Conclusions
Transparent
Information
Lean Monitored
Logistics Performance
Full
Collaboration
13
Lean Logistics
• Lean logistics approaches carry out lean
concepts in physical product flows.
– Just-in-Time (JIT) Delivery
– Cross Docking
– Vender Managed Inventory (VMI)
– Milk Runs
– Third-Party Logistics (3PL)
– Supplier Parks
– Etc.
http://people.hofstra.edu/geotrans/eng/ch5en/conc5en/crossdocking.html
• These approaches are mutually
supporting and reinforcing.
14
Lean Logistics (cont’d)
• Just-in-Time (JIT) Delivery
Approach: Pull system, leveled demand, rate-based production, and
smaller and frequent deliveries.
Effects: Smooth production rate, decreased WIP and lead time, and hence,
quicker responses.
• Cross Docking
Approach: Move goods directly from receiving dock to shipping dock
without intermediate storage.
Effects: Reduced in-transit inventory costs, storage space, handling costs
and order-cycle times, and improved inventory turnover and cash flow.
• Vender Managed Inventory (VMI)
Approach: Let a supplier manage the stock of an item at a customer’s site.
Effects: Pull system and improved communications; Allows suppliers to
know the actual demand of their products.
15
Lean Logistics (cont’d)
• Milk Runs
Approach: A routing of a supply or delivery vehicle to make multiple
pickups or drop-offs at different locations. (Womack and Jones, 1996)
Effects: Reduced inventory, predictable replenishment lead times, better
inventory visibility and improved supplier communications.
• Third-Party Logistics (3PL)
Approach: Includes 3PL providers as business partners.
Effects: Efficient transportation; Real-time tracking; Relieves a company
from the burden of managing transportation.
• Supplier Parks
Approach: Relocate and co-locate suppliers near the customers.
Effects: Further compress the overall value stream.
16
Information Technology
Information Technology for Supply Chain Management
• Not just for Information Flow
Three Flows of a Supply Chain
• Product/Service Flow Books, Music
, Image…
Information
• Information Flow Email, EDI, ERP, E-Kanban…
Technology
-scan…
a nk ing, Pay-on
• Financial Flow Online B
17
Information System Functionality
• Transactional Capabilities
Electronic Document Interchange (EDI)
• State of System Variables
Real-time information sharing among business
partners
• Flow and Pull
Transmitting pull messages; Real-time material System
tracking
• Forecasting and Data Manipulation
Functions
Access & process historical data for medium range
forecast
• Visibility and Security
Balance between access and security
18
Information Technology (cont’d)
Lean Supply Chain in INTERNET
the Internet Age Company 2
Company 4
– Open Standards XM
L XM
L
– Core Company Leads Central
System
Supply Chain
L XM
XM L
– “Middleman” is cut
Company 1 EXTRANET Company 3
– Interconnectivity
Architecture of the information system for
the lean supply chain
19
Performance Measurement and
Continuous Improvement
• What can be measured?
Performance metrics: Time, Cost, Efficiency, Effectiveness
• What should be measured?
Three Graphical Tools to identify problems.
1 2 3 4 5 6 7 8
1. Different Levels of
Contractor
Value Stream Maps (VSM) Forging
to identify wastes Assembler
Distributor
Business Process Time Non-Value-Added Time Value-Added Time
VSM at Supply
Chain Level A B C D
A
D
2. Timeline Chart
VSMs at
for Time-based Performance
Factory Level
20
Performance Measurement and
Continuous Improvement (cont’d)
Wait
Accumulated Activity
Cost
3. Cost-Time Profile
Total
(CTP) Cost
to Identify Time-value
of Money Material
Time
• How do we use the measurements?
Continuously improve the performance
Monitor and sustain the improved performance
• Identifying Targets for Improvement
Future Value Stream Map
Future Cost-Time Profile (CTP)
21
Collaboration Beyond Partnerships
Creating Synergy from a network of lean companies
• Motivation to Build Lean Networks
Lean relationships are required for full collaboration
• Unity of purpose
Unified perception of Value and Purpose based on a
holistic view
• From Self-centered to Process-centered
Create harmonic flows based on integrated chains of
processes
• The glue to hold the network
Beyond contractual obligations: Commitment and Trust
22
Collaboration Beyond Partnerships (cont’d)
• Elements of Lean Relationships
(Cooper & Slagmulder, 1999)
– Reduced Supplier Base for tighter linkages
– Level of Relationships: Links tighter with
suppliers of greater impact for final products.
– Nature of Relationships: Interdependence
– Organizational boundaries are blurred as
companies dynamically share resources
23
Introduction
Challenges for Lean Supply Chains
Driving Supply
Chains toward
Leanness
Building Blocks of
• Lack of Awareness Lean Supply Chain
Challenges for LSC
Implementation
• Cost and Profit allocation
Ideas for the Future
• Greater Inertia than a Single Conclusions
Company
• Globalization of Supply Chains
• Variability in Demand
24
Challenges for Lean Supply Chains (cont’d)
• Integration of Disparate
Computer Systems
• Information Management
• Visibility vs. Security
• Commitment and Trust
25
Ideas for the Future
Lean Supply Chain Lean Consumption
Lean Enterprise
Lean Management
Lean
Manufacturing
Customer
Manufacturing
Floor
Purchase Use Warranty Repairs Disposition
Entire Company
Immediate Supply Chain Complete Customer Experience (Lean Consumption)
Extended Supply Chain
The expansion of the scope of lean concepts
26
Introduction
Ideas for the Future
Driving Supply
Chains toward
Leanness
Building Blocks of
• Six Lean Principles of Lean Lean Supply Chain
Consumption Challenges for LSC
Implementation
(Womack and Jones, 2005)
Ideas for the Future
Solve my problem completely
Conclusions
Don’t waste my time
Get me exactly what I want
Provide value where I want
Solve my problem when I want
Simplify solutions
27
In Conclusion:
Being a “Lean Island” is no longer lean enough
Introduction
Three Basic Building Blocks for Lean supply chains Driving Supply
– Lean logistic systems Chains toward
Leanness
– Information Systems
– Lean collaboration Building Blocks of
Lean Supply Chain
Performance must be monitored in real time
for quick action Challenges for LSC
Implementation
Challenges can be overcome with Ideas for the Future
commitment and effort
Conclusions
The Future
– “Consumption Lifecycle” brings the lean supply chain
closer to customers’ real needs.
Questions?
28
References
• Cooper, R and Slagmulder, R., 1999, Supply Chain Development for the Lean Enterprise
Interorganizatonal Cost Management, Productivity, Portland, OR.
• Groesbeck, R. (2005). Class Notes for the course in Production Systems Improvement, Virginia
Tech, Blacksburg, VA.
• Reeve, J. M., 2002, “The Financial Advantages of the Lean Supply Chain,” Supply Chain
Management Review, March/April, 42-49.
• Taylor, D., 2004, Supply Chains: A Manager’s Guide, Addison-Wesley, Boston, MA.
• Vitasek, K., Manrodt, K. B., and Abbott, J., 2005, “What Makes a Lean Supply Chain,” Supply
Chain Management Review, October, 39-45.
• Womack, J. P. and Jones, D. T., 1996, Lean Thinking, Simon and Schuster, New York, NY.
• Womack, J. P. and Jones, D. T., 2005, Lean Solutions, Free Press, New York, NY.
• Womack, J. P., Jones, D. T., and Roos, D., 1990, The Machine that Changed the World,
Macmillan, New York, NY.