0% found this document useful (0 votes)
110 views24 pages

378-Bca 602N - (C)

1. The document provides instructions for a BCA 6th semester examination on the subject of Information System: Analysis Design & Implementation. 2. It specifies that the exam will be 1 hour and 30 minutes long and contain 100 multiple choice questions, of which only answers to 75 questions need to be answered by students. 3. Students are instructed to carefully read and follow all directions in the question booklet and answer sheet.

Uploaded by

Tejas Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
110 views24 pages

378-Bca 602N - (C)

1. The document provides instructions for a BCA 6th semester examination on the subject of Information System: Analysis Design & Implementation. 2. It specifies that the exam will be 1 hour and 30 minutes long and contain 100 multiple choice questions, of which only answers to 75 questions need to be answered by students. 3. Students are instructed to carefully read and follow all directions in the question booklet and answer sheet.

Uploaded by

Tejas Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 24

Paper Code Á’uiqfLrdk Øekad

Question Booklet No.


Roll No.----------------------
3 7 8
(To be filled in the
OMR Sheet)

O.M.R. Serial No. Á’uiqfLrdk lhjht


Question Booklet Series
C
BCA (Sixth Semester) Examination, July-2022
BCA-602(N)
Information System: Analysis Design & Implementation
Time : 1:30 Hours Maximum Marks-100

tc rd dgk u tk;] bl Á’uiqfLrdk dks u [kksysa


funsZ’k % & 1. ijh{kkFkhZ vius vuqØekad] fo”k; ,oa Á’uiqfLrdk dh lhjht dk fooj.k ;FkkLFkku lgh& lgh Hkjsa]
vU;Fkk ewY;akdu esa fdlh Hkh Ádkj dh folaxfr dh n’kk esa mldh ftEesnkjh Lo;a ijh{kkFkhZ dh gksxhA
2. bl Á’uiqfLrdk esa 100 Á’u gSa] ftues ls dsoy 75 Á’uksa ds mRrj ijh{kkfFkZ;ksa }kjk fn;s tkus gSA
ÁR;sd Á’u ds pkj oSdfYid mRrj Á’u ds uhps fn;s x;s gSaA bu pkjksa esa ls dsoy ,d gh mRrj
lgh gSA ftl mRrj dks vki lgh ;k lcls mfpr le>rs gSa] vius mRrj i=d (O.M.R.
ANSWER SHEET) esa mlds v{kj okys o`Rr dks dkys ;k uhys cky IokabV isu ls iwjk Hkj nsaA
;fn fdlh ijh{kkFkhZ }kjk fdlh iz’u dk ,d ls vf/kd mŸkj fn;k tkrk gS] rks mls xyr mŸkj ekuk
K-378

tk;sxkA
3. ÁR;sd Á’u ds vad leku gSaA vki ds ftrus mRrj lgh gksaxs] mUgha ds vuqlkj vad Ánku fd;s
tk;saxsA
4. lHkh mRrj dsoy vksŒ,eŒvkjŒ mRrj i=d (O.M.R. ANSWER SHEET) ij gh fn;s tkus
gSaA mRrj i=d esa fu/kkZfjr LFkku ds vykok vU;= dgha ij fn;k x;k mRrj ekU; ugha gksxkA
5. vksŒ,eŒvkjŒ mRrj i=d (O.M.R. ANSWER SHEET) ij dqN Hkh fy[kus ls iwoZ mlesa fn;s
x;s lHkh vuqns’kksa dks lko/kkuhiwoZd i<+ fy;k tk;A
6. ijh{kk lekfIr ds mijkUr ijh{kkFkhZ d{k fujh{kd dks viuh vksŒ,eŒvkjŒ ‘khV miyC/k djkus ds ckn
gh ijh{kk d{k ls ÁLFkku djsaA
7. fuxsfVo ekfdZax ugha gSA
egRoiw.kZ % & Á’uiqfLrdk [kksyus ij ÁFker% tkWp dj ns[k ysa fd Á’uiqfLrdk ds lHkh i`”B HkyhHkkWfr Nis gq, gSaA ;fn
Á’uiqfLrdk esa dksbZ deh gks] rks d{k fujh{kd dks fn[kkdj mlh lhjht dh nwljh Á’uiqfLrdk ÁkIr dj ysaA
Rough Work / jQ dk;Z

Series-C BCA 602(N) / K-378 Page - 2


1. A common reason for changing an information system is:
(A) New requirements
(B) New technology
(C) Problems in the existing system
(D) All of the above
2. SQA is:
(A) Software Quality Assurance
(B) System Quality Audit
(C) Software Queue Analysis
(D) None of the above
3. Disadvantage of CASE toil is:

(A) CASE tool have a limited scope

(B) Using case tool is a very costly

(C) Both (A) & (B) are correct

(D) None of the above

4. Choose the correct-

Statement 1. Software quality assurance consists of the auditing and reporting

functions of management

Statement 2. Software quality is measured as a foundation of requirement

(A) Only Statement 1 is correct

(B) Only Statement 2 is correct

(C) Statement 1 & 2 both are correct

(D) Statement 1 & 2 both are incorrect

Series-C BCA 602(N) / K-378 Page - 3


5. Amongst which of the following is/are the Verification and validation activities:

(A) Technical reviews, quality and configuration audits

(B) Algorithm analysis, development testing, usability testing

(C) Qualification testing, acceptance testing and installation testing

(D) All of the above

6. Type of feasibility study are:


(A) Technical
(B) Economical
(C) Operational
(D) All of the above
7. The use of traceability table helps to:
(A) Debug programs following the detection of run-time errors
(B) Determine the performance of algorithm implementation
(C) Identify, control and track requirements changes
(D) None of the above
8. In software engineering the method of CMM is used to:
(A) Improve the testing process
(B) Improve the software process
(C) Develop the software
(D) Maintain the software
9. _______is a measure of the degree of interdependence between modules.
(A) Cohesion
(B) Coupling
(C) Array
(D) Validation

Series-C BCA 602(N) / K-378 Page - 4


10. _______ refers to the set of tasks that ensure that software correctly implements a
specific function.
(A) Verification
(B) Validation
(C) Array
(D) All of the above
11. The full for of SSADM:
(A) Structured Systems Analysis & Design Method
(B) Sequential Systems Analysis & Data Method
(C) Short System Analysis & Data Method
(D) Systematic Static Analysis & Data Method
12. To determine project schedule is:
(A) Identify tasks needed to complete the project
(B) Determine dependency among different tasks
(C) Plan the starting and ending dates for various tasks
(D) All of the above
13. The disadvantage of structured System Analysis and Design Methodology is:
(A) Usability
(B) Time Consuming
(C) Effective use of skill
(D) None of the above
14. Which are information engineering stages?
(A) Information Strategy Planning
(B) Business Area Analysis
(C) System Design
(D) All of the above

Series-C BCA 602(N) / K-378 Page - 5


15. A data dictionary is created when a ______ created.
(A) Instance
(B) Segment
(C) Database
(D) Dictionary
16. Relational schemas and other metadata about relations are stored in a structure
called the ……..
(A) Metadata
(B) Catalog
(C) Log
(D) Data Dictionary
17. What is the purpose of data format validation?
(A) Data correctness
(B) Mere data existence
(C) Data modification
(D) Both Data correctness and Mere data existence
18. In which part does the form validation occur?
(A) Client
(B) User side
(C) Server
(D) Both client & server
19. Which type of user interface provides input by typing text in the keyboard?
(A) Natural language interface
(B) Command Line interface
(C) Graphical User interface
(D) None of the above
Series-C BCA 602(N) / K-378 Page - 6
20. A software might allow a user to interact via:
(A) Keyboard command
(B) Mouse movement
(C) Voice recognition command
(D) All of the above
21. Which of the following is not user interface design process?
(A) Interface validation
(B) Interface design
(C) User, task and environment analysis and modeling
(D) Knowledgeable, frequent user
22. Grouping of all functionally related element is known as:
(A) Cohesion
(B) Coupling
(C) Both (A) and (B)
(D) None of the above
23. The primary objective of system design is to:
(A) Implementation of system
(B) Coding of system
(C) Find out how the system will perform
(D) Design the programs, databases and test plan
24. To run the old system and the new system at same time for a specified period, the
system implementation approach used is:
(A) Sequential
(B) Rapid
(C) Parallel
(D) None of the above

Series-C BCA 602(N) / K-378 Page - 7


25. Which of the following does not affect the software quality and organizational
performance?
(A) Market
(B) Product
(C) Technology
(D) People
26. SQL is:
(A) Sequence Query Language
(B) Structured Query Language
(C) Sub Query Language
(D) None of the above
27. In Data Base Management System DDL is:
(A) Data Duplication Line
(B) Data Definition Language
(C) Data Direction Line
(D) None of the above
28. In size oriented metrics, metrics are developed based on the following:
(A) Number of user inputs
(B) Number of variables
(C) Number of lines of code
(D) Amount of memory usage
29. Which of the following is not an effective project manager trait?
(A) Managerial identity
(B) Problem solving
(C) Manage the people
(D) None of the above
Series-C BCA 602(N) / K-378 Page - 8
30. The context diagram is also known as:
(A) Level-0 DFD
(B) Level-1 DFD
(C) Level-2 DFD
(D) All of the above
31. The step-by-step instructions that solve a problem are called ……….
(A) An Algorithm
(B) A Plan
(C) A List
(D) None of the above
32. Which is not process model?

(A) Spiral Model

(B) Waterfall Model

(C) Capability Maturity Model

(D) None of the above

33. Choose the Correct-

Statement 1. UML is standard way to visualize the design of a system

Statement 2. UML is coding process

(A) Only Statement 1 is correct

(B) Only Statement 2 is correct

(C) Statement 1 & 2 both are correct

(D) Statement 1 & 2 both are incorrect

Series-C BCA 602(N) / K-378 Page - 9


34. Choose the Correct-
Statement 1. Functional requirements capture the intended behaviour of the system
Statement 2. Maintainability is non-functional requirement
(A) Only Statement 1 is correct
(B) Only Statement 2 is correct
(C) Statement 1 & 2 both are correct
(D) Statement 1 & 2 both are incorrect
35. The Data Flow Diagram (DFD) shows:
(A) The flow of data
(B) The Processes
(C) The areas where they are stored
(D) All of the above
36. Sequence diagram is ….... oriented.
(A) Class
(B) Time
(C) Activity
(D) None of the above
37. An UML diagram which has a static view?
(A) Use Case
(B) Class diagram
(C) List
(D) None of the above
38. ISO stand as:
(A) Indian Science Operation
(B) International Standard Organization
(C) Initial Service Operation
(D) None of the above
Series-C BCA 602(N) / K-378 Page - 10
39. Which of the following sets represent levels defined by CMM in increasing order
of maturity?
(A) Initial, Repeatable, Defined, Managed, Optimized
(B) Initial, Defined, Managed, Optimized, Repeatable
(C) Initial, Defined, Managed, Repeatable, Optimized
(D) Defined, Initial, Repeatable, , Managed, Optimized
40. How many levels in CMM?
(A) 1
(B) 2
(C) 4
(D) 5
41. CMM is:
(A) Capability Maturity Model
(B) Capacity Module Model
(C) Code Maturity Model
(D) None of the above
42. Which of the following is not a project manager’s activity?
(A) Project control
(B) Project management
(C) Project planning
(D) Project design
43. Software _______ provides the framework from which comprehensive plan for
software development can be established.
(A) People
(B) Product
(C) Process
(D) None of the above

Series-C BCA 602(N) / K-378 Page - 11


44. Which of the following is a people-intensive activity?
(A) Problem solving
(B) Organization
(C) Motivation
(D) Project management
45. Why is software difficult to build?
(A) Controlled Changes
(B) Lack of reusability
(C) Lack of monitoring
(D) All of the above
46. How is generalization implemented in Object Oriented programming languages?
(A) Polymorphism
(B) Abstract Classes
(C) Inheritance
(D) Encapsulation
47. Choose the incorrect statement in terms of Objects:
(A) Objects are abstractions of real- world
(B) Objects can’t manage themselves
(C) Objects encapsulate state and representation information
(D) All of the above
48. Which of the following is a mechanism that allows several objects in a class
hierarchy to have different methods with the same name?
(A) Aggregation
(B) Polymorphism
(C) Inheritance
(D) None of the above

Series-C BCA 602(N) / K-378 Page - 12


49. Identify which of the following life cycle contains the phases: test case design, test
execution, defect tracking, maintenance?
(A) SDLC
(B) SQLC
(C) STLC
(D) None of the above
50. Which is the following is the most important feature of the spiral model?
(A) Efficiency management
(B) Risk management
(C) Time management
(D) Quality management
51. Which one is not related to an Entity?
(A) Action
(B) Teacher
(C) Person
(D) Student
52. Dashed ellipses represent in E-R diagram:
(A) Multivalued Attribute
(B) Derived Attribute
(C) Weak Entity set
(D) None of the above
53. In E-R Diagram Double ellipse represents in E-R diagram:
(A) Derived Attribute
(B) Multivalued Attribute
(C) Weak Entity set
(D) None of the above

Series-C BCA 602(N) / K-378 Page - 13


54. In E-R Diagram Weak entity set is represented as:
(A) Underline
(B) Double line
(C) Double rectangle
(D) Double diamond
55. Requirement gathering techniques are:
(A) Interviews
(B) Brainstorming
(C) Questionnaires
(D) All of the above
56. Which is not type of system design?
(A) Logical
(B) Physical
(C) Architectural
(D) Quality
57. The Lower CASE tools are:
(A) Planning, Analysis, Design
(B) Implementation, Testing, Maintenance
(C) Both (A) & (B)
(D) None of the above
58. The Upper CASE tools are:
(A) Planning, Analysis, Design
(B) Implementation, Testing, Maintenance
(C) Both (A) & (B)
(D) None of the above
59. CASE is:
(A) Computer Application System Engineering
(B) Computer Aided Software Engineering
(C) Computer Advance System Existence
(D) None of the above

Series-C BCA 602(N) / K-378 Page - 14


60. In the context of dynamic Modeling, “The change in state is called”:
(A) Transition
(B) Event
(C) Action
(D) None of the above
61. The component of the DFD is Known as a …….. common synonyms are a bubble,
a function or a transformation.
(A) Process
(B) Entity
(C) Level
(D) Flow
62. A ……. is represented graphically by an arrow into or out of a process.
(A) Process
(B) Entity
(C) Level
(D) Flow
63. Which of the following are types of code review?
(A) Code walkthrough
(B) Code inspection
(C) Both (A) & (B)
(D) None of the above
64. The primary tool used in structured design is a:
(A) Structure Chart
(B) Data-flow diagram
(C) Module
(D) None of the above
Series-C BCA 602(N) / K-378 Page - 15
65. When different combination of input requires different combination of actions,
which of the following technique is used in such situation?
(A) Boundary Value Analysis
(B) Equivalence Partition
(C) Decision Table
(D) None of the above
66. A decision table is:
(A) A truth table
(B) A table which facilitates taking decisions
(C) A table listing conditions and actions stub taken based on the testing of
conditions
(D) A table in a database
67. UML diagrams are:

(A) Structural diagram

(B) Behavioural diagram

(C) Interaction diagram

(D) All of the above

68. Which of the following is not considered as an option for achieving reliable cost
and effort estimation?
(A) The ability to translate the size estimate into human effort, calendar time, and
dollars
(B) Use relatively simple decomposition techniques to generate project cost and
effort estimates
(C) Base estimates on similar projects that have already been completed
(D) Use one or more empirical models for software cost and effort estimation

Series-C BCA 602(N) / K-378 Page - 16


69. Which of the following software paradigms involve product delivery on a short
cycle of iterations?
(A) Waterfall
(B) Spiral
(C) Rapid Application Development
(D) None of the above
70. Requirement specification is carried out:
(A) After requirement are determined
(B) Before requirement are determined
(C) Simultaneously with requirement determination
(D) Independent of requirement are determination
71. Interaction diagram is a combined term for:
(A) Sequence + collaboration diagram
(B) Activity diagram + state chart diagram
(C) Deployment + collaboration diagram
(D) None of the above mentioned
72. Which of the following word correctly summarized the importance of software
design?
(A) Quality
(B) Complexity
(C) Efficiency
(D) Accuracy
73. Arrange the following activates for making a software product:
1. Design strategy
2. Transformation into product
3. Implementation
4. Requirement Gathering
(A) 4,1,3,2
(B) 4,3,2,1
(C) 1,2,3,4
(D) 1,4,2,3

Series-C BCA 602(N) / K-378 Page - 17


74. CASE tools are:
(A) Software Design tool
(B) Code generation tool
(C) Document production tool
(D) All of the above
75. Which of the following automate project management activities, manage all work
product produced throughout the process?
(A) Software Development Cycle
(B) Project Estimation Cycle
(C) CASE tool
(D) Spiral Model
76. Choose the correct-
Statement 1. Users can be representing as Actors in Use case diagram
Statement 2. Use case description consist number and use case name
(A) Only Statement 1 is correct
(B) Only Statement 2 is correct
(C) Statement 1& 2 both are correct
(D) Statement 1 & 2 both are incorrect
77. Choose the correct-
Statement 1. A system is a collection of interrelated components that function
together to achieve some outcome
Statement 2. Risk management is consider in Spiral model
(A) Only Statement 1 is correct
(B) Only Statement 2 is correct
(C) Statement 1& 2 both are correct
(D) Statement 1 & 2 both are incorrect
Series-C BCA 602(N) / K-378 Page - 18
78. One of the Characteristics of UML:

(A) It is a generalized modelling language

(B) It is distinct from other programming languages like C++, Python, etc

(C) It is used to visualize the workflow of the system

(D) All of the above

79. An UML is:

(A) Universal Machine Language

(B) Unique Modular Language

(C) Unified Modeling Language

(D) Unit Machine Learning

80. What is related to the overall functionality of the delivered software?

(A) Function- related metrics

(B) Product-related metrics

(C) Size-related metrics

(D) None of the above mentioned

81. Which of the following costs is not part of the total effort cost?
(A) Costs of networking and communications
(B) Costs of providing heating and lighting office space
(C) Costs of lunch time food
(D) Costs of support staff
82. Which of the following are parameters involved in computing the total cost of a
software development project?
(A) Effort costs
(B) Hardware and software costs
(C) Travel and training costs
(D) All of the above

Series-C BCA 602(N) / K-378 Page - 19


83. Which is not object oriented programming language?
(A) C
(B) C++
(C) JAVA
(D) All of the above
84. SDLC stands:
(A) Sequence Development Life Cycle
(B) Serial Data Life Cycle
(C) Software Development Life Cycle
(D) Standard Dynamic Life Cycle
85. System Study involves:
(A) Study of an existing System
(B) Documenting the existing System
(C) Identifying current deficiencies and establishing new goals
(D) All of the mentioned above
86. A feasibility study:
(A) Includes a statement of the problems
(B) Considers coding of systems
(C) Use for maintenance
(D) None of the above
87. A cost benefit analysis is performed as part of:
(A) System design
(B) System specification
(C) System performance assessment
(D) Feasibility analysis

Series-C BCA 602(N) / K-378 Page - 20


88. “Consider a system where, a heat sensor detects an intrusion and alerts the security
company.” What king of a requirement the system is providing?
(A) Functional
(B) Non-Functional
(C) Known Requirement
(D) None of the above
89. Which one of the following is a functional requirement?
(A) Maintainability
(B) Portability
(C) Robustness
(D) None of the above
90. Which of the following prototypes does not associated with Prototyping Model?
(A) Domain Prototype
(B) Vertical Prototype
(C) Horizontal Prototype
(D) Diagonal Prototype
91. What does RAD stand for?
(A) Relative Application Development
(B) Rapid Application Development
(C) Ready Approval Development
(D) None of the above mentioned
92. What is the first step in the software development lifecycle?
(A) System Design
(B) Coding
(C) Testing
(D) Primary Investigation and Analysis

Series-C BCA 602(N) / K-378 Page - 21


93. Which feature of OOP indicates code reusability?
(A) Encapsulation
(B) Inheritance
(C) Polymorphism
(D) Abstraction
94. COCOMO stands:
(A) Calculated Cost Model
(B) Constructive Cost Model
(C) Computer Cost Model
(D) None of the above mentioned
95. Which of the following are system design and its types?
(A) Logical design
(B) Physical design
(C) Both Logical & Physical design
(D) None of the mentioned above
96. The full form of JAD is:
(A) Joint Application Development
(B) Junior Approval Design
(C) Joint Approval Data
(D) None of the above
97. What of the following is an operational component of the system?
(A) Input device
(B) RAM
(C) Processor
(D) None of the above

Series-C BCA 602(N) / K-378 Page - 22


98. What is system analysis?
(A) Collecting facts and information
(B) Interpreting facts
(C) Identifying the problems
(D) All of the mentioned above
99. Which is type of information?
(A) Strategic Information
(B) Operational Information
(C) Both (A) & (B)
(D) None of these
100. What is the major goal of a System Analysis and Design?
(A) Instructions
(B) Improve organization systems
(C) Communication
(D) None of the above mentioned

******

Series-C BCA 602(N) / K-378 Page - 23


DO NOT OPEN THE QUESTION BOOKLET UNTIL ASKED TO DO SO

1. Examinee should enter his / her roll number, subject and Question Booklet
Series correctly in the O.M.R. sheet, the examinee will be responsible for
the error he / she has made.
2. This Question Booklet contains 100 questions, out of which only 75
Question are to be Answered by the examinee. Every question has 4
options and only one of them is correct. The answer which seems
correct to you, darken that option number in your Answer Booklet
(O.M.R ANSWER SHEET) completely with black or blue ball point
pen. If any examinee will mark more than one answer of a particular
question, then the answer will be marked as wrong.
3. Every question has same marks. Every question you attempt correctly,
marks will be given according to that.
4. Every answer should be marked only on Answer Booklet (O.M.R
ANSWER SHEET). Answer marked anywhere else other than the
determined place will not be considered valid.
5. Please read all the instructions carefully before attempting anything on
Answer Booklet (O.M.R ANSWER SHEET).
6. After completion of examination, please hand over the O.M.R. SHEET to
the Examiner before leaving the examination room.
7. There is no negative marking.
Note: On opening the question booklet, first check that all the pages of the
question booklet are printed properly in case there is an issue please ask the
examiner to change the booklet of same series and get another one.

Series-C BCA 602(N) / K-378 Page - 24

You might also like