1.0 OBJECTIVE –
To lay down the procedure for receiving of Raw and Accessories Material.
2.0 SCOPE –
This SOP shall applicable for all Raw material and Accessories material received at
store department.
3.0 RESPONSIBILITY
Store Executive/Officer
4.0 ACCOUNTABILITY
Head of the Department
5.0 PROCEDURE
5.1 The receipt of each Raw and Accessories material will be intimated by
security
5.2 After receipt of the intimation of the consignment each document should
be examined carefully for
5.2.1 Whether the material belongs to the company.
5.2.2 Delivery Challan.
5.2.3 Whether the material is received as per Purchase Order
5.2.4 Whether the material is received from approved vendor.
5.2.5 Bill Of Entry
5.3 Before unloading inspect the vehicle for cleanliness
5.4 Each delivery of Raw and Accessories materials should be examined
visually while unloading, such as;
5.4.1 Proper labeling of each container, and also check the intactness
of the container.
5.4.2 Match information on outer shippers and packs as mentioned in
Delivery Challan.
5.4.3 If material received in Damage/Breakage/Leakage or not in
intact conditions, such container is to be segregated from other
material and kept aside in a suitable manner.
5.4.4 Record the discrepancy in material discrepancy note and
intimate to HOD QC/QA and take necessary actions as
instructed by HOD QC/QA
5.5 At the time of unloading RAW/Accessories materials it should be crossed
verified with Invoice/Delivery Challan and must checked physically for the
following points for its correctness
Name of the Material
Quantity as per packet
Net Weight/Gross Weight/Tare Weight
Storage condition on pack (Container/Poly Bag/ Box etc.,)
5.6 After verification store person shall shift the material in the staging area for
physical verification.
5.7 Physical verification for actual quantity is carried out for all Raw Material
and Accessories Material.
5.8 For packing materials, random verification will be performed for checking
the correctness of quantity mention on the label by the party which will be
mention in physical verification record.
5.9 Check the Item Name, Gross Weight, Net weight and Tare weight of the
materials and record the observations in physical verification record.
5.10 Make the GRN entry
5.11 QC inspection should be done
5.12 After completion of QC inspection and the QC person will affix the
“APPROVED” OR “REJECTED” label.
5.13 All the raw material should be stored in pallets or racks in an orderly
fashion to permit First In First Out stock rotation.