Map of EU CCS Projects 1
Map of EU CCS Projects 1
2020
Sweden
Norway
16. Preem CCS*
1. Sleipner CO2 Storage* 3
Port of Antwerp Industrial Capture CCS-equipped industrial cluster, CO2 transportation and storage in the North Sea N/A N/A Feasibility study Air Liquide, BASF, Borealis, INEOS, ExxonMobil, ExxonMobil, Total
and reuse Fluxys, Port of Antwerp and Total
Croatia iCORD Industrial Capture Capturing the CO2 produced at a fertilizer plant at Location in central Croatia and Approx. 1Mt/y 2025 Feasibility Study to be INA MOL MOL
at a concrete production plant at Location in eastern Croatia, and storing it at ordered by end of 2019,
Moslavina basin oil fields and Pannonia basin oil fields as part of INA EOR project. FS to be prepared by end
of Q3 2020.
CO2 EOR Project Croatia EOR EOR project started in 2014. Injected 1.400 kt CO2 in the EOR fields Ivanić and Žutica 0,560 Mt/y 2015 In operation INA MOL MOL
near Ivanic Grad (Zagreb County, 41 km from Zagreb) .The pipeline Molve-Ivanić is
88 km long (30 bar)
Bio-Refinery Project Industrial Capture Bio-Refinery plant (bio-Ethanol production) on the Sisak Refinery location (Sisak- 0,06 Mt/y 2024 Signing the contracts INA MOL MOL
Moslavina County, Sisak 60 km from Zagreb). On the existing pipeline route, new (additional potential on location for basic design and
pipe of 16 km will be built for CO2 storage, for the yearly production of 60 kt of CO2, 300-400 kt) technology selection
plus potential 300-400 kt of biogenic CO2 from CHP.
France Lacq Capture Storage CCS Oxy fuel combustion CO2 captured and storage in depleted natural gas field at Approx. total 50,000 tonnes 2009 Capture and storage Total Total
(Oxy fuel combustion) Rousse (Pyrenees) phase ended on
15/03/2013
DMX Demonstration in Dunkirk Industrial Capture CCS-equipped steel-making plant, CO2 transportation and storage in the North Sea Approx. 1 Mtpa 2025 ArcelorMittal, IFPEN, Axens, Total, ACP, Brevik Total
Engineering, CMI, DTU, Gassco, RWTH, Uetikon
Italy CCS Ravenna Hub Power and capture CO2 capture in North of Italy (Pianura Padana Area) from Industrial Complex 0.04-5,0 Mtpa phased program 2025-2028 Prefeasability Study Eni Eni
(post-combustion), (i.e. Ravenna) and trasportation to depleted Reservoirs in Ravenna Hub
Blue Hydrogen
The Porthos (Port of Rotterdam) Industrial Capture CCS-equipped industrial cluster, CO2 transportation and storage in the North Sea Approx. 5 Mtpa 2024 Feasibility study Gasunie, the Port Authority and EBN BP, Shell
Netherlands
Athos (Ijmond) Industrial Capture CCUS Network capturing CO2 from TATA Steel plant and reusing it or storing it in 7.5 MT CO2 per year 2030 Feasibility Study Gasunie, EBN, Port of Amsterdam and Tata Steel
empty gas fields under the North Sea
Aramis (Den Helder) Industrial Capture CO2 supplied by third parties from Den Helder and stored in the North Sea floor. N/A N/A N/A N/A
This CO2 can be brought to Den Helder by boat or by pipeline (for example from
IJmuiden)
Magnum (Eemshaven) Natural Gas-to-H2 CCS-equipped production of hydrogen for power generation, CO2 transportation and Approx. 4 Mtpa 2023 Feasibility study Equinor, Vattenfall, Gasunie, MHPS Equinor
(pre-combustion) storage in the North Sea
Norway Sleipner CO2 Storage Industrial Capture CCS-equipped natural gas production, CO2 directly injected into North Sea Approx. 1 Mtpa, and over 17 million tonnes 1996 Operational Equinor (operator) Equinor, Vår Energi,
reservoirs has been injected since inception to date. Vår Energi, Total Total
Snøhvit CO2 Storage Industrial Capture CCS-equipped LNG facility, CO2 transportation and storage in the Barents Sea 0.70 Mtpa 2008 Operational Equinor (operator) Equinor, Total, Hess
Petoro, Total, Engie, Norsk Hydro,
Hess Norge
Northern Lights Industrial Capture CCS-equipped industrial capture, CO2 transportation and storage in the 0.8 Mtpa from possible 2 industrial plants: 2023–2024 Final Investment Shell, Equinor,Total Shell, Equinor, Total
North Sea cement and waste to energy Decision (FID)
Republic ERVIA Power & Capture CCS-equipped CCGTs and refinery, CO2 transportation and storage in the Celtic Sea 2 Mtpa 2028 Feasibility study ERVIA
of Ireland (post-combustion)
Sweden Preem CCS Industrial Capture CCS-equipped refinery, CO2 transportation and storage in the North Sea 500,000 tonnes N/A Pre-study Preem, Chalmers University of Technology, SINTEF Equinor,
(pilot study) Energy Research, Equinor and Aker Solutions Aker Solutions
UK Acorn Industrial Capture CCS-equipped natural gas processing plant, CO2 transportation and storage in the The Reference Case assumes a flat rate of 2023 Feasibility Study Project is led by Pale Blue Dot Energy, with funding and Chrysaor, Shell, Total
North Sea 200,000T/yr can be captured from one of the support from industry partners (Chrysaor, Shell and
gas terminals at St Fergus Total) the UK and Scottish Governments
Caledonia Clean Energy Power & Capture CCS-equipped natural gas power plant, CO2 transportation and storage in the North 3 Mtpa 2023 Feasibility Study Summit Power
(post-combustion) Sea
H21 North of England Natural Gas-to-H2 Natural gas-to-hydrogen conversion with CCS, CO2 tranportation and storage in the Approx. 3 Mtpa 2020s Feasibility study Northern Gas Networks, Cadent and Equinor Equinor
(pre-combustion) North Sea and salt caverns
Liverpool-Manchester Natural Gas-to-H2 Natural gas-to-hydrogen conversion with CCS, CO2 transportation and storage in 1.5 Mtpa (10% H2) - 9.5 Mtpa (100% H2) 2020s Feasibility study CADENT
Hydrogen Cluster (pre-combustion) the North Sea
Net Zero Teesside Power & Capture CCS-equipped natural gas power plant, CO2 transportation and storage in the North 5 Mtpa 2026 Technical evaluation and BP, OGCI BP, ENI, Repsol, Shell,
(post-combustion) Sea business model options Equinor, Total
Humber Zero Carbon Cluster Industrial Capture, CCS-equipped industrial cluster, CCS-equipped hydrogen production, bioenergy N/A 2020s Technical evaluation and Drax Group, Equinor, National Grid Ventures Equinor
Natural Gas-to-H2, with CCS (BECCS), CO2 transportation and storage in the North Sea business model options
Power & Capture
Liverpool Bay Area CCS Project Carbon Capture CO2 capture from the existing industrial facilities and new hydrogen production 1-3 Mtpa phased program 2025 Concept Selection Eni Eni
Sequestration plant in the North West of England Phase
Registered Office: City Tower, Level 14, 40 Basinghall Street, London EC2V 5DE, United Kingdom T +44 (0)20 3763 9700 [email protected]
www.iogp.org
Brussels Office: Avenue de Tervuren 188A, B-1150 Brussels, Belgium T +32 (0)2 790 7762 [email protected]
Houston Office: 19219 Katy Freeway, Suite 175, Houston, TX 77094, USA T +1 (713) 261 0411 [email protected] www.oilandgaseurope.org