0% found this document useful (0 votes)
41 views1 page

Coc Ar35 47L 16-01-Vii-14

This document is a Certificate of Conformance for Argon (Ar) with a purity of 99.95%. It includes details such as cylinder type, gas content, pressure, analysis date, and expiry date. The certificate confirms that the cylinder has been tested and meets the specified concentration standards.

Uploaded by

Tirtana Prasetia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
41 views1 page

Coc Ar35 47L 16-01-Vii-14

This document is a Certificate of Conformance for Argon (Ar) with a purity of 99.95%. It includes details such as cylinder type, gas content, pressure, analysis date, and expiry date. The certificate confirms that the cylinder has been tested and meets the specified concentration standards.

Uploaded by

Tirtana Prasetia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

$T

SPtrCIALTY GASES

certificate No-: 16-011Ar35/COC/SI/Vl l/14

CERTIFICATE OF CONFORMANCE

ARGON (Ar) 99.95%

A. General lnformation

cYUNDER SIZE/TYPE: 471 Seamless Steel PRODUCT CODE: Afislalslc


GAS CONTENT: 7 M3 max. ANALYSIS DATE: JULY 16,2014
PRESSURE: 150 bar EXPlRY DATE: JULY 15,2017
VALVE CONNECTTONFYPE: QF 2G 1 Brass JOB CARD NO.:
TAG NO.: N.A

CYIINDER NO.:
11D029114 0001s3
081073 s66121
694056 347s334
080074

1if$il,-{ff*r*;

L'a:
'in ?
.p.$
*a

The cylinder listed above has been tested and found to contain the component concentration listed above.
All values are in mole/mole basis gas phase unless stated otherwise.

APPROVED BY
IMEX
P1

acaqY-AH\nAN'

Certification ac€uracy is calculated from known source of error inclusive of process capability and reference
standards. Shelf life period subjected to proper cylinder storage and usage. Avoid exposing the cylinde r to
extreme heat. To avoid backfill, cylinder pressure must be Breater than process pressure.

gII GAS

You might also like