0% found this document useful (0 votes)
148 views2 pages

Interior Project Supervisor CV

Uploaded by

ayesha siddiqui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
148 views2 pages

Interior Project Supervisor CV

Uploaded by

ayesha siddiqui
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Mohamed Riaz

Phone +971 553624592


Email [email protected]
Nationality Indian
Languages English, Hindi, Urdu & Tamil
References Jason - Production Manager Havelock One
(Bahrain),+973 66738081, [email protected]

Professional Summary
I am a self- motivated, hard working, and adaptive individual whose passion is for Supervision in
Interior and Joinery Project field. I am looking for an opportunity to invest my 14 years of experience
in Shopping Malls Interior Projects all over GCC countries with Alshaya Group by utilizing my
problem-solving and Time Management skills in a challenging working environment and become a
valuable asset to the organization that I work for.

Work Experience
| April 2022 - Present |
Abanos Interior Fit-Out and Joinery (ECC Group), Dubai-UAE
Production Supervisor
• Preparing work schedule for carpenters teams as per site priority installation items
• Coordinating with Project Coordinator for Mock up installation & approval from main Contractors
• Handling Subcontractors man power and material issues
• Submission of BOQ material samples and method of statement documents for approval
• Focusing on Project completion task as per Production Plan and Delivery Schedule
• Updating Project Completion Status to Project Operation Manager
| October 2020 - November 2021 |
Ahmed Mohammed Jassim Group, Bahrain
Production Supervisor
• Supervision of Royal Court and Palace (Bahrain) Interior/Joinery Projects
• Handling manufacture process of Modular Furniture and Kitchen Cabinets for villas
• Allocating Project work for a team of carpenters
• Reporting Project Completion Status to Factory Manager and Production Manager
• Project Mockup Approval and Coordination with Clients & Consultants
| May 2012 - July 2020 |
Havelock One Interiors, Bahrain
Production Supervisor
• Organizing Alshaya Group project work for a team of carpenters in Assembly Section
• Monitoring Interior Raw Materials and Finished Product Assembly as per Project Shop Drawing
• Coordination of Assembly Materials from Milling Section
• Observation of Quality Outputs in Assembly Section
• Managing of Material Transfer from Assembly to Polishing Section
• Updating Project Completion Status to Factory Manager and Production Manager
• Prioritize Project Items with Project Manager as per Site Requirement
• Coordination of Project bought out Items with Project Planner and Procurement Department
• Focusing on Project completion task as per Production Plan and Delivery Schedule
| April 2008 - March 2012 |
Leader Interior And Furniture, Juma Al Majid Group, Dubai-UAE
Quality Controller/Site Supervisor
• Project Mockup Approval and Coordination with Clients & Consultants
• Updating Project Completion Status to Project Operation Manager
• Prioritize the Project Items with Project Manager as per Site Requirement
• Supervision of Architectural Metal and Joinery Items during Site Installation
• Coordination of Project Installation Items with Carpenters and Fabricators
| December 2006 - March 2008 |
Kutty Flush Doors and Furniture, Chennai, Tamilnadu, India
Quality Controller
• Veneer and Timber Raw Material Inspection
• Resin Manufacture and Testing Process (Melamine and Phenol Formaldehyde)
• Finished Product Testing and Inspection
• Quality Inspection of Flush Doors, Panel Doors and FR Doors
• Quality Inspection of Laminated Doors and PU Coated Doors
| July 2004 - October 2006 |
Wings Wood Products, Dubai-UAE
Plant Incharge
• Supervision of Timber VAC-VAC process & KD Treatment Plant Operation
• Quantity and Quality Inspection of Timber Protection Treatment
| May 1994 - September 2003 |
National Plywood Industries, Hosur-India
Quality Supervisor
• Raw Material Analysis and Resin Manufacturing Process
• Finished Product Testing and Quality Inspection of Decorative-Industrial Laminate

Education
1988-1991
Islamiah College, University of Madras, Tamilnadu, India
Bachelor of Science: Chemistry

Interior & Joinery Projects Experience


Commercial and Hotel Projects:
• Vida hotel & Tower project (Ongoing - Dubai Creek Harbour)
• Peninsula project (Ongoing - Business Bay, Dubai)
• Dubai Metro Stations
• Abu Dhabi Financial Centre (ADFC)
• National Bank of Bahrain (NBB) Branches
• Four Seasons Hotel (Kuwait)
• Four Point Sheraton Hotel (Kuwait)
Alshaya Group Interior Projects in Shopping Malls (All over GCC countries):
• Starbucks Coffee Shops
• Cheesecake Factory Shops
• Restaurants - | IHOP | Asha's | Raising cane | Blaze Pizza | Katsuya |
• Retail Shops - |Mother care | Bath & Body Works (BBW) | Pottery Barn | Milano | Debenhams |

Powered by TCPDF (www.tcpdf.org)

You might also like