Engineering Standard: IPS-E-PR-410
Engineering Standard: IPS-E-PR-410
ENGINEERING STANDARD
FOR
AND
ORIGINAL EDITION
MARCH 1996
This Standard is the property of Iranian Ministry of Petroleum. All rights are reserved to the owner.
Neither whole nor any part of this document may be disclosed to any third party, reproduced, stored in
any retrieval system or transmitted in any form or by any means without the prior written consent of the
Iranian Ministry of Petroleum.
Mar. 1996 IPS-E-PR-410
FOREWORD
The Iranian Petroleum Standards (IPS) reflect the views of the Iranian Ministry of Petroleum and are
intended for use in the oil and gas production facilities, oil refineries, chemical and petrochemical
plants, gas handling and processing installations and other such facilities.
IPS are based on internationally acceptable standards and include selections from the items
stipulated in the referenced standards. They are also supplemented by additional requirements
and/or modifications based on the experience acquired by the Iranian Petroleum Industry and the
local market availability. The options which are not specified in the text of the standards are
itemized in data sheet/s, so that, the user can select his appropriate preferences therein.
The IPS standards are therefore expected to be sufficiently flexible so that the users can adapt
these standards to their requirements. However, they may not cover every requirement of each
project. For such cases, an addendum to IPS Standard shall be prepared by the user which
elaborates the particular requirements of the user. This addendum together with the relevant IPS
shall form the job specification for the specific project or work.
The IPS is reviewed and up-dated approximately every five years. Each standards are subject to
amendment or withdrawal, if required, thus the latest edition of IPS shall be applicable
The users of IPS are therefore requested to send their views and comments, including any
addendum prepared for particular cases to the following address. These comments and
recommendations will be reviewed by the relevant technical committee and in case of approval will
be incorporated in the next revision of the standard.
1
Mar. 1996 IPS-E-PR-410
GENERAL DEFINITIONS
Throughout this Standard the following definitions shall apply.
COMPANY :
Refers to one of the related and/or affiliated companies of the Iranian Ministry of Petroleum such as
National Iranian Oil Company, National Iranian Gas Company, National Petrochemical Company
and National Iranian Oil Refinery And Distribution Company.
PURCHASER :
Means the “Company" where this standard is a part of direct purchaser order by the “Company”,
and the “Contractor” where this Standard is a part of contract document.
CONTRACTOR:
Refers to the persons, firm or company whose tender has been accepted by the company.
EXECUTOR :
Executor is the party which carries out all or part of construction and/or commissioning for the
project.
INSPECTOR :
The Inspector referred to in this Standard is a person/persons or a body appointed in writing by the
company for the inspection of fabrication and installation work.
SHALL:
Is used where a provision is mandatory.
SHOULD:
Is used where a provision is advisory only.
WILL:
Is normally used in connection with the action by the “Company” rather than by a contractor,
supplier or vendor.
MAY:
Is used where a provision is completely discretionary.
2
Mar. 1996 IPS-E-PR-410
0. INTRODUCTION ............................................................................................................................. 4
1. SCOPE ............................................................................................................................................ 5
2. REFERENCES ................................................................................................................................ 5
3. DEFINITIONS AND TERMINOLOGY ............................................................................................. 6
4. SYMBOLS AND ABBREVIATIONS ................................................................................................ 6
5. UNITS .............................................................................................................................................. 6
3
Mar. 1996 IPS-E-PR-410
0. INTRODUCTION
The primary purpose of IPS standard specifications on "Process Design of General Heating &
Cooling Systems" is to establish minimum requirements and design criteria needed in process
design of the following standards:
4
Mar. 1996 IPS-E-PR-410
1. SCOPE
This Standard Specification is intended to cover the minimum requirements and recommendations
deem necessary to be considered in process design of "Hot Oil" and "Tempered Water" systems.
The scope is covered in two parts as:
Note 1:
This standard specification is reviewed and updated by the relevant technical committee on
May 2003. The approved modifications by T.C. were sent to IPS users as amendment No. 1
by circular No. 221 on May 2003. These modifications are included in the present issue of
IPS.
Note 2:
This standard specification is reviewed and updated by the relevant technical committee on
May 2003. The approved modifications by T.C. were sent to IPS users as amendment No. 2
by circular No. 476 on March 2018. These modifications are included in the present issue of
IPS.
2. REFERENCES
Throughout this Standard the following dated and undated standards/codes are referred to. These
referenced documents shall, to the extent specified herein, form a part of this standard. For dated
references, the edition cited applies. The applicability of changes in dated references that occur
after the cited date shall be mutually agreed upon by the Company and the Vendor. For undated
references, the latest edition of the referenced documents (including any supplements and
amendments) applies.
5
Mar. 1996 IPS-E-PR-410
5. UNITS
This standard is based on international system of units (SI), as per IPS-E-GN-100, except where
otherwise specified.
6
Mar. 1996 IPS-E-PR-410
PART I
PROCESS DESIGN OF HOT OIL SYSTEM
6.1 General
6.1.1 A simplified schematic of major components of a hot oil system is given in Fig. 1. The heat
transfer medium is pumped through a fired heater to the heat exchanger and returns to the pump
suction surge tank. In some cases a fired heater may be replaced by electrical sources or indirect
fire heater by a waste heat source, such as the exhaust stack of a gas turbine.
6.1.2 While the system is ordered and designed as a packaged system, all necessary equipment
such as ladders, and platforms, guards for moving parts, etc., shall be supplied as part of the
package.
6.1.3 Indoor equipment shall be suitably protected against damage by infiltration of moisture and
dust during plant operation, shutdown, wash down, and the use of fire protection equipment.
6.1.4 Outdoor equipment shall be similarly protected, and in addition, it shall be suitable for
continuous operation when exposed to rain, snow or ice, high wind, humidity, dust, temperature
extremes, and other severe weather conditions.
6.1.5 The system shall be laid out such that to make all equipment readily accessible for cleaning,
removal of burners, replacement of filters, controls and other working parts and for adjustment and
lubrication of parts requiring such attention. For similar reasons, the heater front and rear doors
shall be hinged or deviated.
6.1.6 Maintenance tools specially designed for the equipment shall be furnished with the system.
6.1.7 Spare parts must be readily available. If a stock of parts is not maintained by the
manufacturer, critical spare items shall be furnished with the system.
6.2.1 Advantages
The advantages of hot oils are:
- Low vapor pressure at ambient temperature.
- Always liquid and easy to handle.
- Blended for a specific temperature range.
- Higher specific heat than normally occurring hydrocarbons.
6.2.2 Disadvantages
The disadvantages of hot oils include:
- Escaping vapors are environmentally undesirable.
- When overheated, the oils will oxidize and coke on the fire tube. Also, they can be ignited.
- Ethers if used, are expensive.
- Ethers are hydroscopic and must be kept dry.
7
Mar. 1996 IPS-E-PR-410
6.4 Design
The following features and criteria shall be considered in process design of each component of the
hot oil system.
6.4.1.1 Process design of the heater is critical for satisfactory operation. The heat transfer fluid must
have sufficient velocity, generally 1.2 to 3 m/s, to avoid excessive film temperatures on the heater
tubes.
6.4.1.2 Design and capacity of the heater should be limited so that the maximum film temperature
does not exceed the maximum recommended operating temperature of the fluid.
6.4.1.3 Hot spot occurrence should be avoided, since it can lead to tube failure and fluid
degradation.
6.4.1.4 The heater shall be rated for the specified output. Multiple identical units may also be
employed for the designed total heat load, but care shall be taken in system design to ensure
adequate and proportional flow through the heaters.
6.4.1.5 The preferred thermal efficiency of the heater to be 80% based on LHV of fuel. The
contractor shall specify the expected and guaranteed values for the thermal efficiency and the basis
for their estimation.
6.4.1.6 Based on total outside surface area of the firetube (s) and the return flue(s), the average
heat flux shall not exceed 17.35 kJ/s.m². The flame characteristics and combustion chamber design
shall ensure that the maximum heat flux at any point is limited to 23.66 kJ/s.m².
6.4.1.7 Heating medium (hot oil) shall clearly be specified and it’s discharge temperature from the
heater shall be limited to a specified value, in data sheet.
6.4.1.8 Under normal operating conditions, the rise in heating medium temperature across the
heater shall not exceed the allowable DT specified in the data sheet.
6.4.1.9 The heater shall be designed to give an efficient heater operation over the complete
operating load range.
6.4.1.10 Each heater (in case the use of multi-heater units), shall have a self-supporting stack
designed to carry the total exhaust under the maximum firing conditions.
6.4.1.11 In general reference should be made to IPS-E-PR-810, "Process Design of Furnaces" for
design of heater and auxiliary systems.
6.4.2.1 The hot oil heater shall be designed for a continuous and reliable operation.
6.4.2.2 The burner(s) shall be designed for a minimum of 120 percent of normal full load firing and
be suitable for firing the specified fuels (oil, gas or both) without undue maintenance or adjustment.
6.4.2.3 In case of a forced-draft type heater the burner design shall incorporate air/fuel ratio
system(s) to ensure complete combustion with minimum amount of excess air. The air/fuel ratio
8
Mar. 1996 IPS-E-PR-410
system shall be effective throughout the burner firing range i.e., from low to high fire positions.
6.4.2.4 The burner nozzles and other parts exposed to the radiant heat of the combusion chamber
shall be made from heat resisting alloy steel.
6.4.2.5 The burner fuel and air openings shall be arranged to provide suitable velocities for
complete mixing resulting in efficient combustion of the fuel.
6.4.2.6 Each burner shall have observation ports to permit sighting and inspection of the flame.
6.4.2.7 Suitable ignitor(s) shall be provided for firing fuel oil or gas and shall be of adequate output
to permit safe ignition of the fuel.
9
Mar. 1996 IPS-E-PR-410
6.4.5.1 A surge tank shall be provided, suitably sized to handle expansion of inventory in whole
system, the size of the expansion vessel is based upon the expansion coefficient, Maximum
temperature and quantity of the fluid in the circuit and shall be designed as a pressure vessel in
accordance with IPS-E-PR-850.
6.4.5.2 The surge tank shall be arranged on the pump suction side and shall be blanketed with fuel
gas or inert gas.
6.4.5.3 The surge tank shall be located inside the heater building.
6.4.5.4 The surge tank shall be provided complete with the following:
a) Level gauge(s), spanning the entire operating range.
b) Pressure gauge.
c) Pressure relief valve.
10
Mar. 1996 IPS-E-PR-410
6.4.6.1 At least two centrifugal pumps (one operating and one stand by) with 10% over design
capacity at the design head shall be provided. However the following requirement shall also be
considered in design.
6.4.6.2 Strainer shall be provided at the suction of each pump.
6.4.6.3 Valving around each pump shall include the following:
a) Suction isolation gate valve of the same size as the suction line.
b) Non-Return valve in discharge line.
c) Isolation gate valve in discharge line.
d) Casing vent and drain valves.
6.4.6.4 In design of pump suction and discharge lines, the differential thermal expansion of the lines
due to temperature variation shall be taken into account.
The stand-by pump shall be maintained in a pre-heated state in order to avoid thermal shock when
starting by including a via bypass across the check valve.
6.4.7.1 A hot-oil filter shall be provided to handle a slipstream equal to 10% of the design flow rate.
6.4.7.2 The filter shall be of disposable cartridge type, capable of removing all solid particles above
5 micrometers (microns).
6.4.7.3 The hot-oil filter shall be provided complete with the following:
a) DP gauge.
b) Isolation valves at inlet and outlet.
c) Restriction orifice, sized for the required flow rate.
d) Vent and drain valves.
e) Relief valve.
f) Filter by-pass line.
6.4.8.1 A bulk-pack type carbon absorber in consistent with the heating medium should be provided
downstream of the heating medium filter to remove any products of degradation.
6.4.8.2 The design flow rate of carbon filter shall be the same as the hot-oil filter flow-rate.
6.4.8.3 The carbon filter shall be provided complete with the following:
a) DP gauge.
11
Mar. 1996 IPS-E-PR-410
6.4.9 Piping
Piping shall be carbon steel unless otherwise specified. To minimize the possibility of leakage, the
connections in Piping, fittings, and equipment should be welded.
6.5.1 The Vendor, unless he expressly states any exceptions in his proposal, shall specify the
guarantees on which the system furnished by him to meet the requirement with regard to process
design, as flow rate, hot-oil delivery pressure and temperature, safety and reliability under all
specified operating conditions. Refer to IPS-E-PR-250.
6.6.1 The Vendor shall specify the following data and information as the "Specific Project
Requirements" in his proposal.
• Project: …............................................................................................................
• Location: ..................................Elevation ......................................................... m
• Environment: .......................... non-corrosive.................corrosive .....................
• Barometric pressure................ kPa (abs)
• Heat transfer medium fluid ..................................................................................
• Concentration: .........................................mass% in water
• Circulation rate: .........................................................m³/h
• Pump differential .........................................................kPa
• Temperature of heat transfer fluid to heater: ........................................... °C
• Temperature of heat transfer fluid from heater: ....................................... °C
• Design circulation rate: ..........................................................................m³/h
• Design pump differential: ........................................................................kPa
• Design temperature, heater outlet: .......................................................... °C
• Design, heater duty: .............................................................................MJ/h
• System Design pressure: ...............................kPa (ga)at ....................... °C
• Maximum pressure drop accross heater: ……….................................... kPa
• Surge tank:.............................. Required.............................Not required
• Circulation pump: .....................Required.............................Not required
• Hot oil filter: ..............................Required..............................Not required
• Carbon adsorber: .....................Required..............................Not required
• Supply header size:...................................................... mm
• Return header size:.......................................................mm
• System capacity, excluding heater package: ................................ m³
• Instrument air: ....................Instrument gas
- Supply pressure..................... kPa (ga) normal
- Design pressure .................... kPa (ga) at ................................ °C
• Area classification:
12
Mar. 1996 IPS-E-PR-410
13
Mar. 1996 IPS-E-PR-410
14
Mar. 1996 IPS-E-PR-410
PART II
PROCESS DESIGN OF TEMPERED WATER SYSTEM
7.1 General
7.1.1 Using tempered water as a cooling medium for solutions that would freeze or crystallize at
usual cooling water temperatures is a common practice.
7.1.2 A special tempered water circulating system shall be designed to minimize the chance of
fouling by deposition of these type materials on heat exchanger surfaces.
7.1.3 Condensate or treated process water shall be used as circulating tempered water, the water
should efficiently be treated for corrosion inhibition according to material specification and design
procedures. Provisions for corrosion inhibitor facilities shall be made. Tempered water system
typically consists of a surge drum, circulating pumps, air cooler and/or shell-tube heat exchanger
and associated piping and measuring devices.
7.1.4 Single or multiple user(s) may be incorporated in a single tempered water system. All
components of the system should accordingly be designed to maintain required cooling load
capacity when all or parts of the user(s) are in operation.
7.1.5 The water return from the various users shall be cooled to specified temperature depending
on the local climatic conditions.
7.1.6 All applicable parts of general requirements set forth in Clause 6, "Part I" of this Standard shall
be considered for this part unless is in contrary with Vendor specification.
7.2.1 For layout and operation of the system, Vendor should take into account an adequate space
being allowed for operational access, cleaning and maintenance.
7.2.2 The arrangement of installations should be such that, instruments and indicators can readily
be seen from the appropriate working position. Valves and controls should be nearly arranged and
accessible.
7.2.3 In case the system admitted for indoor installation, access facilities should be so arranged that
major items of the system can be brought in and taken out or removed as necessary.
7.2.4 Applicable provisions of IPS-E-PR-190, should also be considered in system layout design by
the Vendor.
7.3.1 General
7.3.1.1 Design of the system and it’s associated controls should take into account the following:
a) The nature of the application.
b) The type of installation i.e., indoor or outdoor installation.
c) Cooling load patterns.
15
Mar. 1996 IPS-E-PR-410
7.3.2.1 The Pressurized type surge drums for required capacity shall be designed in accordance
with IPS-E-PR-850. Atmospheric surge tanks shall be designed as per API-650 with steam
blanketing system for oxygen removal.
7.3.2.2 Make up water to surge drum will be taken from condensate system, moderately heated to
required temperature by hot condensate circulation and chemical treatment should be practiced to
minimize corrosion.
7.3.2.3 The drum should be blanketed with steam. Provisions shall be considered for automatic
controlling of water level and adding make-up water as required.
7.3.2.4 The pressurized type surge drum operating above 7.0 kPa shall have a minimum design
pressure of 110 kPa (abs). The drum shall be designed for full vacuum.
7.3.2.5 All applicable loads, including wind load, earthquake and hydrostatic testing load shall be
considered in design as acting simultaneously.
7.3.2.6 All outline drawing shall be furnished and shall contain the data indicated in Table 1 below.
Location of the drum marking or nameplate shall be indicated on this drawing.
7.3.2.7 A manufacturer’s data report shall be furnished and shall contain the same information as
required by form U-1 of ASME Code, Section VIII, Division 1.
7.3.2.8 Provisions for entering, cleaning, venting and draining of vessel shall be considered on the
bases of basic practice as specified by the Vendor/manufacturer.
7.3.2.9 Surge drum shall be furnished with following auxiliaries:
a) Pressure gauge.
b) Temperature gauge.
c) Level gauge.
d) Steam blanketing regulator.
e) All inlet, outlet piping nozzles.
7.3.3.1 The circulating and recirculating pumps shall be centrifugal with 100% spare and shall be
designed in accordance with the following requirements:
a) Unless otherwise specified, the pumps and auxiliaries shall be suitable for unsheltered
16
Mar. 1996 IPS-E-PR-410
7.3.4.1 Unless otherwise required, air cooler shall be used in tempered water system, in
accordance with IPS-E-PR- 785.
7.3.4.2 In case shell-tube heat exchanger is required, its design shall be in accordance with IPS-E-
PR-771.
7.3.5.1 All applicable portions of IPS-E-PR-440 shall be considered in pipe sizing and design of the
tempered water system. It shall apply to auxiliary piping connecting the equipment of the system
and the piping between the system and the consuming Units. However, the following considerations
shall be admitted to accomplish the whole requirements of piping process design.
1) In piping layout, the location of operating and control points such as valves, flanges,
instruments, vents and drains shall enable operation of the system with minimum difficulties.
2) The piping system shall be laid out to allow easy repair or replacement of any portion of the
system.
3) Basic design data for each line shall be given in the line designation table as per Company’s
project specification.
4) The actual minimum corrosion allowance shall be listed for each line in the line designation
table.
5) Flanges or other removable connections shall be provided throughout the piping system to
permit complete removal of the piping.
6) A gate valve shall be installed in each instrument take-off connection except thermowells and
shall be located close to the pipe.
17
Mar. 1996 IPS-E-PR-410
7) All piping connections to equipment shall be suitable for the equipment design and the
hydraulic test pressure.
7.3.6.1 The whole system should be arranged and sized so that the design-cooling load can be met
by an appropriate flow of tempered water within the applicable system temperature limits.
7.3.6.2 Circulating piping should be thermally insulated and traced where local climatic condition
implies.
7.3.6.3 Isolating valves are normally fully open or fully shut and should be provided to facilitate
isolation of individual items of equipment.
7.3.6.4 An appropriate and compatible automatic controls should be arranged for the system
elements.
7.3.6.5 Proper study should be prepared for biocide or other additives and their monitoring.
18