Lejer 41

This document is a construction contract between Zimacon Sdn Bhd and the government of Terengganu for the design, construction, and completion of a sports complex in Wakaf Tapai, Marang, Terengganu. The original contract price was RM13,069,800 and the completion date was initially March 11, 2021. Over 21 interim payments totaling RM3,772,126.13 or 28.86% of the construction value have been made to the contractor for completed work.

Uploaded by

Kamarul Mayo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views

Lejer 41

This document is a construction contract between Zimacon Sdn Bhd and the government of Terengganu for the design, construction, and completion of a sports complex in Wakaf Tapai, Marang, Terengganu. The original contract price was RM13,069,800 and the completion date was initially March 11, 2021. Over 21 interim payments totaling RM3,772,126.13 or 28.86% of the construction value have been made to the contractor for completed work.

Uploaded by

Kamarul Mayo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

LEJAR KONTRAK

1 Nama Kontraktor: ZIMACON SDN. BHD. 7 Harga Asal Kontrak ; RM13,069,800.00 12 Bayaran Pendahuluan : -

2 Nama Projek : MEREKABENTUK, MEMBINA DAN 8 Harga baru Kontrak : 13 Kadar LAD/Hari : RM2,417.00
MENYIAPKAN PEMBANGUNAN KOMPLEKS SUKAN
DAERAH DI WAKAF TAPAI, MARANG, TERENGGANU
(REKA & BINA)
3 No. Kontrak: JKRNT(T)M/6/2018 9 Nilai Kerja Pembina : RM13,069,800.00
4 Tarikh Milik Tapak: 12/3/2018 10 Wang Peruntukan RM0.00
5 Tarikh Siap asal : 11/3/2021 Sementara (WPS) :
6 Tarikh Siap Lanjutan : 11 Wang Kos Prima (WKP): -

Nilai Kerja Dilaksanakan Dan Bayaran Balik wang Pendahuluan Bayaran Diperakukan
Amaun Lain Kena Bayar Kontraktor
No. Tarikh WJP
Interim Penilaian % dari Nilai LAD Jumlah
Kerja Terkumpul Bayaran Kontraktor Utama Penerima Diperakukan (RM) Jumlah Terkumpul
Terkumpul (RM) Pembina Semasa (RM) Terkumpul (RM) (RM) Disyorkan (RM) Semasa (RM) Terkumpul (RM) (RM) Bayaran (RM) J+L+M (RM)
A B C D E F G H J K M N P Q

1 11/4/2018 - 0.00% - - - 0.00 0.00 - 0.00 - 0.00 0.00


2 10/5/2018 - 0.00% - - - 0.00 0.00 - 0.00 - 0.00 0.00
3 11/6/2018 - 0.00% - - - - 0.00 - 0.00 - 0.00 0.00
4 11/7/2018 - 0.00% - - - - 0.00 - 0.00 - 0.00 0.00
5 16/8/2018 395,201.00 3.02% - - - 395,201.00 39,520.00 39,520.00 355,680.00 - 395,200.00 395,200.00
6 12/9/2018 398,451.00 3.05% - - - 3,251.00 320.00 39,840.00 2,880.00 - 3,200.00 398,400.00
7 14/10/2018 607,187.00 4.65% - - - 208,787.00 20,870.00 60,710.00 187,830.00 - 208,700.00 607,100.00
8 13/11/2018 627,580.00 4.80% - - - 20,480.00 2,040.00 62,750.00 18,360.00 - 20,400.00 627,500.00
9 02/12/2018 645,580.00 4.94% - - - 18,080.00 1,800.00 64,550.00 16,200.00 - 18,000.00 645,500.00
10 13/01/2019 718,300.00 5.50% - - - 72,800.00 7,280.00 71,830.00 65,520.00 - 72,800.00 718,300.00
11 13/02/2019 1,123,364.43 8.60% - - - 405,064.43 40,500.00 112,330.00 364,500.00 - 405,000.00 1,123,300.00
12 11/03/2019 1,268,841.90 9.71% - - - 145,541.90 14,550.00 126,880.00 130,950.00 - 145,500.00 1,268,800.00
13 11/4/2019 1,660,468.25 12.70% - - - 391,668.25 39,160.00 166,040.00 352,440.00 - 391,600.00 1,660,400.00
14 13/5/2019 2,113,921.89 16.17% - - - 453,521.89 45,350.00 211,390.00 408,150.00 - 453,500.00 2,113,900.00
15 16/6/2019 2,592,713.43 19.84% - - - 478,813.43 47,880.00 259,270.00 430,920.00 - 478,800.00 2,592,700.00
16 14/07/2019 2,741,493.15 20.98% - - - 148,793.15 14,870.00 274,140.00 133,830.00 - 148,700.00 2,741,400.00
17 8/08/2019 3,067,773.26 23.47% - - - 326,333.26 32,630.00 306,770.00 293,670.00 - 326,300.00 3,067,700.00
18 10/09/2019 3,392,865.18 25.96% - - - 325,165.18 32,510.00 339,280.00 292,590.00 - 325,100.00 3,392,800.00
19 8/10/2019 3,572,126.93 27.33% - - - 179,326.93 17,930.00 357,210.00 161,370.00 - 179,300.00 3,572,100.00
20 11/11/2019 3,718,206.53 28.45% - - - 146,106.53 14,610.00 371,820.00 131,490.00 - 146,100.00 3,718,200.00
21 25/11/2019 3,772,126.13 28.86% - - - 53,926.13 5,390.00 377,210.00 48,510.00 - 53,900.00 3,772,100.00
- 377,210.00 3,394,890.00 - 3,772,100.00

Nota Untuk Kolum A:


* Perakuan Bayaran Pendahuluan
** Perakuan Bayaran Pendahuluan untuk Sub Kontraktor Dinamakan
*** Pelepasan WJP 1/2
LEJAR KONTRAK
1 Nama Kontraktor: ZIMACON SDN. BHD. 7 Harga Asal Kontrak ; RM13,069,800.00 12 Bayaran Pendahuluan : -

2 Nama Projek : MEREKABENTUK, MEMBINA DAN 8 Harga baru Kontrak : 13 Kadar LAD/Hari : RM2,417.00
MENYIAPKAN PEMBANGUNAN KOMPLEKS SUKAN
DAERAH DI WAKAF TAPAI, MARANG, TERENGGANU
(REKA & BINA)
3 No. Kontrak: JKRNT(T)M/6/2018 9 Nilai Kerja Pembina : RM13,069,800.00
4 Tarikh Milik Tapak: 12/3/2018 10 Wang Peruntukan RM0.00
5 Tarikh Siap asal : 11/3/2021 Sementara (WPS) :
6 Tarikh Siap Lanjutan : 11 Wang Kos Prima (WKP): -

Nilai Kerja Dilaksanakan Dan Bayaran Balik wang Pendahuluan Bayaran Diperakukan
Amaun Lain Kena Bayar Kontraktor
No. Tarikh WJP
Interim Penilaian % dari Nilai LAD Jumlah
Kerja Terkumpul Bayaran Kontraktor Utama Penerima Diperakukan (RM) Jumlah Terkumpul
Terkumpul (RM) Pembina Semasa (RM) Terkumpul (RM) (RM) Disyorkan (RM) Semasa (RM) Terkumpul (RM) (RM) Bayaran (RM) J+L+M (RM)
A B C D E F G H J K M N P Q
377,210.00 3,394,890.00 3,772,100.00
22 26/12/2019 3,859,116.28 29.53% - - - 87,016.28 8,700.00 385,910.00 78,300.00 - 87,000.00 3,859,100.00
23 12/01/2020 3,937,876.66 30.13% - - - 78,776.66 7,870.00 393,780.00 70,830.00 - 78,700.00 3,937,800.00
24 10/02/2020 4,460,437.62 34.13% - - - 522,637.62 52,260.00 446,040.00 220,340.00 250,000.00 522,600.00 4,460,400.00
25 8/03/2020 4,720,408.83 36.12% - - - 260,008.83 26,000.00 472,040.00 134,000.00 100,000.00 260,000.00 4,720,400.00
26 5/04/2020 4,875,942.43 37.31% - - - 155,542.43 15,550.00 487,590.00 139,950.00 - 155,500.00 4,875,900.00
27 6/05/2020 4,931,472.58 37.73% - - - 55,572.58 5,550.00 493,140.00 49,950.00 - 55,500.00 4,931,400.00
28 9/06/2020 5,130,854.55 39.26% - - - 199,454.55 19,940.00 513,080.00 179,460.00 - 199,400.00 5,130,800.00
29 8/07/2020 5,339,786.35 40.86% - - - 208,986.95 20,890.00 533,970.00 188,010.00 - 208,900.00 5,339,700.00
30 11/08/2020 5,866,613.65 44.89% - - - 526,913.65 52,690.00 586,660.00 474,210.00 - 526,900.00 5,866,600.00
31 8/09/2020 6,138,053.35 46.96% - - - 271,453.35 27,140.00 613,800.00 194,260.00 50,000.00 271,400.00 6,138,000.00
32 11/10/2020 6,405,823.20 49.01% - - - 267,823.20 2,700.00 616,500.00 215,100.00 50,000.00 267,800.00 6,405,800.00
33 10/11/2020 6,571,794.70 50.28% - - - 165,994.70 - 616,500.00 165,900.00 - 165,900.00 6,571,700.00
34 01/12/2020 6,625,154.00 50.69% - - - 53,454.00 - 616,500.00 43,400.00 10,000.00 53,400.00 6,625,100.00
35 10/01/2021 6,699,058.11 51.26% - - - 73,958.11 - 616,500.00 53,900.00 20,000.00 73,900.00 6,699,000.00
36 08-Feb-21 6,868,508.77 52.55% - - - 169,508.77 - 616,500.00 169,500.00 - 169,500.00 6,868,500.00
37 07-Mar-21 7,989,560.24 61.13% - - - 1,121,060.24 - 616,500.00 1,121,000.00 - 1,121,000.00 7,989,500.00
38 08-Apr-21 8,292,680.69 63.45% - - - 303,180.69 - 616,500.00 303,100.00 - 303,100.00 8,292,600.00
39 09-May-21 9,197,175.22 70.37% - - - 904,575.22 - 616,500.00 904,500.00 - 904,500.00 9,197,100.00
40 10-Jun-21 9,367,761.95 71.67% - - - 170,661.95 - 616,500.00 170,600.00 - 170,600.00 9,367,700.00
41 04-Jul-21 9,488,099.07 72.60% - - - 120,399.07 - 616,500.00 120,300.00 - 120,300.00 9,488,000.00
616,500.00 5,715,900.00

Nota Untuk Kolum A:


* Perakuan Bayaran Pendahuluan
** Perakuan Bayaran Pendahuluan untuk Sub Kontraktor Dinamakan
*** Pelepasan WJP
2/2