DAMAC
DAMAC CRESCENT PROPERTIES LLC
DELTA (Ai bmsins!
Form No.: SPM/PA/STS/001/00
ProjectName | DAMAC HILLS PARKS RESIDENCE | ProjectNo.__| P021.41
324 VILLAS Date 17/40/2022
[Submittal No. P021.41-DB51-MTS-CIV-013 [Revision: [oo
[Submittal Title: |Method Statement for Wardrobe Works
fe are sending herewith under separate cover the drawings / documents / samples listed below.
ITEM NO. | DWGS.
SPECS DESCRIPTION TYPE | COPIES REMARKS
BOQ REF.
01 Method Statement for Wardrobe} OT | 1 Hard
|Works.
[TZPE" SD= Shop Drawings, Si= Sample, GT= Guarantes, MD= Manvtachrer® Data,
= Ceifictas, TT= Test Results, OT= Other
|We certify that the documents / materials submitted herewith have been reviewed in detal and are in strial
Jconformance with the contract drawings and specifica
IContractor (Name)
lEng. Ziad Ahmad Shehadi
Projects Manager
[Signature:
Cépt ai otherwise stated
IRov'd By ‘|
Date: RATE
Date:
Resident Engineer Review Comments
[Consultant Decision
‘Approved
CB Approved As Noted
(CO __‘C'Not Approved
C) D'NotRequired
Resident Engineer's (Name):
Signature:
Date:
Revd By
|Contractor:
[safe and satstaciory manner.
Date:
[Corrections or comments made relatve fo submitals during ths review do not relive the contractor fom compance wih the Tequrement
Jot The Contract. This check is ony for review of general conformance withthe design concept ofthe projact and general compslance with
the information given in the contract documents. The contractor is responsible for confirming anc corelating ell erties and éenensions|
selecting fabrication processes anc techniques of constucten, coordinating his work wth that of ethor rade and performing his work in
Copy to:
Employer [] Consuttant [] as Other
Head
Office
ESS ae aaa
ALEMARATE tm i! slamtd!The Employer
DAMAC
OAHAC CRESCENT PROPERTIES LLC
an
+. |
AdtgBintoak | ara
The Engineer The Contractor
The Subcontractor
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Material Statement Submittal No. : DECC/DB51 /MS/C/013 Rev-0
thks Manager
Rev. | Date Prepared By Checked By ‘Approved By
4
oO 11-10-2022 v S
Si ilvel Ziad Ahmac
QA/QC Manager
ProjectsManagerThe Employer The Engineer ___] The Contractor
DAMAC Ee |)
it ———-
DAAC CRESCENT PROPERTIES LLC bn Rae gg Baa =
The Subcontractor
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Table of Contents
‘S.No Description Page No.
1. | Purpose 3
2. Scope. 3
3. | Reference Documents 3
4, Definitions 3
5. _ | Project Details & Responsibilities 45
6. Health, Safety & Environment (HSE) 6-14
7. | Material / Equipment Resources 14
8. | Method / Procedure 15-18
9. | Quality Assurance / Quality Control 18
10. Inspection and Test Plan (ITP) 18
11, Distribution 18The Employer The Engineer The Contractor The Subcontractor
‘DAWAC CRESCENT PROPERTIES LLC
DAMAC ——
ToGo oN
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
> Purpose
The purpose of the method statement is to describe the system and sequence of activities
related to the wardrobe Works of Damac Hills Parks Residence Project (327 Villas) in
accordance with the contract project specification, contract drawings, approved shop
drawing and project standards,
> Scope
This Method Statement is intended to outline the requirement for activities and the
method used for the Wardrobe Works.
3. Reference Documents
> Project Specification
> IFC Drawings / Approved DM Drawings
> Shop drawings submittal
> Bill of Quantities (BOQ)
> Project Quality Plan
> Project HSE Plan
> DM, DDA & DEWA requirements
4. Definitions
> Project Name - DAMAC HILLS PARKS RESIDENCE 327 VILLAS.
> Employer = M/s, DAMAC CRESCENT PROPERTIES LLC
> Consultant —- M/s, ARIF & BINTOAK CONSULTING ARCHITECT & ENGINEERS
> DECC - M/s, Delta Al Emarate Building Contracting Co. LLC
> PM - Project Manager
> QA/Qc - Quality Assurance / Quality Control
> ITP - Inspection & Test Plan
> HSE - Health, Safety & Environment
> PPE - Personnel Protective Equipment
> IR - Inspection Request‘The Employer
DAMAC
DOAHAC CRESCENT PROPERTIES LLC
The Engineer The Contractor
oe
ak dys ite
Arif&Bintoak
fa ee | Ee.
The Subcontractor
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
5. Project details & Responsibilities
PROJECT NAME DAMAC HILLS PARKS RESIDENCE (327 VILLAS)
PROJECT Located at Sector:
ADDRESS, DAMAC HILLS - Dubai, UAE
Name Contact Info.
Dubai- UAE
CLIENT M/s DAMAC Crescent Properties L.L.C ‘Tel. 04 5205470
P.O .Box 3670
CONSULTANT M/s Arif & Bintoak Consulting Arch & Eng. LLC | Dubai, UAE
Tel. 04 3372686
MAIN. P.O. Box 87425
ONTR M/s Delta Al Emarat Building Contracting LLC | Dubai - UAE.
a cobs Tel. 04 4541211
aa Mis Prestige
CONTRACTORS ne Hee
1.6 RELEVANT ISE Manager) (050-4969493 _
PERSONNEL Manager) 055-6267154
Muhammed Azhar (Str. Engineer) 055-3793881
ie inocee S a oan Safety Practice, DEWA & DDA
REPERENCES UAE Fire & Life Safety Code Practice 2018,The Employer The Engineer The Contractor The Subcontractor
Goudie
DAMAC sera
‘OAVAC CRESCENT PROPERTIES LLC mem
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Responsibilities
> Manpower Responsibility
Tt is overall responsibility of Project Director to ensure that the work procedure is safe and
activities are carried out according to approved MS, shop drawing and specified quality is
achieved to the Engineer's satisfaction,
> Project Manager. Overall Management of the Site Team and Project Programs, including the
‘current subject. He is responsible to plan and manage all tasks related to submittals/ execution
of this activity to the completion and to take the requested corrective action related to any
raised NC. He is also responsible to coordinate with the Consultant and with other concerned
persons to finalize any variation/ problem related to this activity.
> The Construction Manager shall liaise with the Engineers& Safety Engineer to ensure work
is carried out in accordance with Quality & Safety requirements.
The Construction Manager shall coordinate with PE of PY, Site PE/SE to ensure that the
necessary resources to implement the works as per approved MS, AHA and JHA have been
allocated.
> The Project Engineer shall ensure that the site preparation activities are conducted according
to the approved Method Statement and that all in-situ testing as required by Inspection and
Test Plan are resourced and implemented. The PE shall follow up SE and construction team for
the proper and timely execution of the works.
> The Material Engineer will ensure that the materials being used are in accordance to the
Project specification and tested through TPI and forward all the results to the QS Section in
order to submit with Inspection Request for approval.
> The QA/QC Engineer liaise with consultant site representative for conducting Inspection on
day to day basis upon receive Inspection request through Site Engineer.
> The SE/Foreman is responsible to organize the work in a safe and efficient manner, including
all safety requirements and PPE, implementation of the work as per the MS and the ITP.
> The Site Engineer shall report to the Project Engineer and confirm, day to day, all the Work
Inspection Request (WIR) status approved by the Consultant representative.
> Responsibility of the Survey Team is to perform all the required surveying activities required
to achieve target dates and confirm the survey part of the Inspection request are approved by
Consultant.
> HSE Inspector / Officer Ensure safe work procedures implemented and followed, provide
required tool box talk, verify site activities are followed RA, Stop all unsafe work activities.The Employer
DAMAC
‘OMNIA CRESCENT PROPERTIES LLC
The Engineer The
ia is je
Arif&Bintoak
wines wpe
The Subcontractor
Contractor
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
6. Health, Safety & Environment (HSE)
Activity Hazards
Safety Health
Werking at ‘CiConfined Spaces EZINoise / Vibration
Height Hot Works DAsbestos
Fragile Roofs | OGases CHazardous Substances/atmosphere
Plant, Oire / Explosion Manual Handling
Equipment & Falling Materials CiRots/Birds or Other
Tools Collapse of Structure Olead
CiMobile Plant Environmental pollution OOther
Overhead Other
Services
(Underground
Services
Electrical
‘An emergency procedure is established and communicated to the workforce and in
the event of an accident, the emergency preparedness and response plan shall be
Emergency: | followed
The risk assessment shall be used as o guideline to implement the necessary
corrective/remedial measures.
Name(s) of first aid trained Location of First aid box:
personnel: Khaleel (HSE Dr. Naseem
Heo Officer) (052-7072157
inst alee Location of nearest Hospital
NMC Royal Hospital- DIP
(04-8108800
Personal Tt shall be ensured that no workers be allowed to work on site without wearing an
Protective | appropriate Personal Protective Equipment such as safety shoes, safety hard hats,
Equipment: | reflective vest, hand gloves or not being properly inducted by DECC HSE Engineer
prior to deployment on the work site.
a uw w a a aDAMAC shi
Arif&Bintoak
CAMAC CRESCENT PROPERTIES LLC
cays ng
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
eet Name: [ Contact No.
‘Ambulance 998
Fire Brigade 997
Police 999
| Coast Guard 996
Enea Electricity Failure 991
Contact Details: [Water Failure. 922
| Engr. Ziad Ahmed (Projects Manager) 055-2376630
‘Mr. Muhamed Thahir (HSE Manager) 050-4969493
‘Mr. Senthilvel (QA/QC Manager) 055-6267154
‘Mr. Mohammed Abu Nazer (Construction souLeaso
Manager)
Muhammed Azhar (Str. Engineer) 055-3793681
Method Statement Review, Approval and Communication
Method Statements shall be reviewed and approved internally by the Project Manager and EHS
Lead Engineer being issued for site operation, The assigned Construction Manager shall ensure
that the method statement and risk assessments are communicated to the site execution team.
Records and signatures shall be maintained by the Construction Manager.
Job Safety Analysis (JSA) and Task Briefing
Tob safety analysis and task briefing shall be completed by Construction Manager along with all
staff involved on the Storm water activities. JSA’s shall be communicated to site team by the
area Project Engineer/Site Engineer/General Foreman/Foreman prior to commencement of
works and at regular intervals thereafter or after any significant change in the location, activity,
personnel, equipment, climate, etc. All persons attending JSA briefings shall sign the TSA
attendance form. Supervising consultant personnel shall attend JSA/Task briefings.
Risk Assessments
The Project Manager and HSE Manager shall identify the potential hazards before starting any
activities on project site and they will plan a proper safety procedures and measures to mitigate
or eliminate these defined hazards. A thorough risks assessment shall be carried out whereby
various activities are identified clong with their possible dangers and hazards. The existing
controls are checked for adequacy and if it requires an additional controls and resources to
mitigate the consequences of possible incident, DECC shall deploy and provide such measures. _|
7The Employer The Engineer | The Contractor The Subcontractor
DAMAC
‘OAMAC CRESCENT PROPERTIES LLC
Project: DAMAC HILLS PARKS RESIDENCE 227 VILLAS
Method Statement for Wardrobe Works
Risk assessments shall be produced for all tasks described in this method statement. Risk |
assessments shall be communicated to the workforce prior to commencement of works.
Risk assessment is attached as annexure with this method statement.
Permit to work (PTW)
The purpose of this procedure is to provide a safe system of work in the Site, and to give
guidance to those carrying out the work. The Construction Manager have the overall
responsibilities for ensuring this provision are made for the implementation of safe systems of
work. A duly signed PTW shall be available in the work location
Inspection and Monitoring
The EHS Lead Engineer shall ensure that inspection and monitoring is carried out in accordance.
with DECC Project Health and Safety Plan. All inspections and monitoring to be recorded
Personal Protective Equipment
PPE shall be worn at all times and shall be reinforced by site supervision at all times. The PPE
requirements are Hard Hat, Steel Cap Safety Boots, and High visibility vest, safety glasses and
gloves. The Project EHS team shall be responsible for the selection and issue of mandatory PPE.
All job specific PPE shall be provided by the Construction Management through the Stores.
Competence and certification
UG services locator operator shall be 3" party trained and competent.
All drivers shall be holding valid UAE license and defensive driving training.
All Plant and Equipment operators shall be holding valid UAE driving license and approved Third
Party Certificate,
All Plant and Equipment shall have a valid Third-Party Inspection Certificate
Flagman- Internal Flagman training course.
Plant and Equipment
The Plant Manager shall be responsible for ensuring that all vehicle& equipment used by the
Construction Team are in good condition, preventative maintenance is performed, holding valid
registration documents, insurance coverage and 3" party inspection & test certificates. All heavy
vehicle & equipment shall be fitted with audible reverse alarm and revolving warning lights. Fire
extinguisher shall be provided for all plant and equipment DECC Lead EHS Engineer shall carry
out periodic inspection of fire extinguishers.
8The Employer | The Engineer The Contractor The Subcontractor
DAMAC ghaadi
Arif&Bintoak
‘DANAC CRESCENT PROPERTIES LLC
mca per
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
All plant and equipment shall maintain a buffer zone to avoid interaction, in addition situational
‘awareness training will be given to all operators. The Plant Manager to ensure that all Plant and
Equipment, daily inspection checklist are being carried out and completed by a competent person
DECC Lead EHS Engineer shall carry out periodic inspection,
DECC management will ensure that arrangements are in place to ensure the controlled or
organized delivery, collection of materials, and Loading and unloading of Plant and equipment.
DECC Construction Manager shall provide suppliers and subcontractors with full information on
the access way and traffic regulations so that any congestion and disruption may not arise by
the vehicles operated
All Delivery collection drivers shall attend induction with regards to traffic management. This
shall include site layout and designated route, speed restrictions, site traffic requirements,
loading, unloading requirements, any specific risks and any additional relevant information.
DECC management shall establish appropriate dedicated vehicle parking areas for delivery /
collection vehicles. Parked vehicles shall be turned of f with hand brokes on.
DECC shall ensure the following:
> arrangements are in place to ensure all delivery, collection dri
arrival to site:
> material delivery, collections is made at designated storage, collection areas;
> materials can be unloaded, loaded safely by mechanical means where appropriate in safety and
without risk to others on site;
Those involved in material handling are trained in the site delivery procedures;
> vehicle loads are checked prior to entry to site to ensure that they are safe;
> vehicle loads are checked and approved by both the employer and the driver following loading
on site prior to release of the vehicle for exit from site:
rs report to security upon
Traffic Management
Traffic Management Plan (Logistics/ Traffic Management Security Plan) has been established.
In summary
> Construction team to ensure that all DECC site access roads are monitored.
> Supervisor shall be responsible for segregation of pedestrian from Plant and Equipment
movements. Flagman shall be assigned for purposed of managing the traffic and plant and
equipment movement.The Employer The Enginesr The Contractor The Subcontractor
ploye je Engineer | The Contraci 1@ Subcontractor
DAMAC
DDANAC CRESCENT PROPERTIES LLC
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Work:
jethod Statem: flardrobe Works
> Site access roads will be designed to minimized reversing operations by having one-way system
and assigning turning points.
> Site access roads shall be maintained by the construction team at all times. All reversing
movements shall be controlled by competent flagman.
> Control of traffic routes and priorities shall be established and separated where practicable
between normal site traffic and heavy earthmoving plant. Loaded plant shall have right of way
at all times, and procedures for reversing and maneuvering shall be implemented and shall
include the use of audible alarms on dump trucks and banks men where necessary. Particular
attention shall be paid to plant operator ‘bling’ areas where plant is maneuvering in confined
areas,
> Traffic Signage shall be provided on access roads ie. Danger Excavation, Heavy Vehicle
Movement, Heavy Vehicle Crossing, Speed Limit, Hump/ Ramp, Men at Work, etc. by the
construction team,
> All vehicle driver, Heavy equipment operators/drivers, Plant and Equipment operators shall
follow all traffic management signage’s and project speed limits.
> Flagmen's on fixed location will be provided with shades and drinking water. All flagmen's will
be positioned on safe locations.
> Pedestrian movement will be segregated using necessary measures (Hand barricading,
demarcations, signage, etc.) from vehicles and equipments.
Training
The Project Health and Safety Plan contains the EHS Training Matrix for the project. The
Project Manager is responsible for ensuring that time is allocated for the delivery of the project
training matrix. The EHS Manager/Engineer is responsible for the delivery of the training. All
necessary training and certifications will be obtained for operatives and supervisors prior to the
commencement of activities. If Employer/Supervising Consultant inspection are needed,
Employers/Supervising Consultant inspectors will be provided with necessary training and
briefing prior to the commencement of inspection and training/briefing records must be sent to
Supervising Consultant HSE representative.
Third Party certification training is required for all person operating service locator equipment.
Full list of Environment, Health and Safety training requirement are listed on the Project Health
and Safety Plan.
10The Employer The Engineer The Contractor The Subcontractor
eT
DAMAC aes
‘OAVAC CRESCENT PROPERTIES LLC Te
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Disciplinary Procedure
Project personnel and subcontractor personnel who violate the EHS requirements shall be
subject to the Disciplinary action procedure. A full copy of the disciplinary procedure is
contained in the Project Health and Safety Plan. The disciplinary procedure applies to all
personnel irrespective of position and seniority.
Hazard Warning Signage
Applicable Hazard warning signage’s shall be provided on site (Excavation signs, Men at Work,
Speed Limit, Emergency Number, Emergency Response, etc.) by the Construction team.
Environmental
Litter and waste shall be controlled by disposal into designated covered skips/ containers. Waste
collection, transportation and disposal shall be carried out only by companies registered with
ECS Dubai Municipality.
Wastes generated during the Dewatering works (food wastes and other) shall be collected at
site and disposed through waste skips, The construction teams shall be responsible for ensuring
this happens. Fuel and oils will be stored in bunded tanks and waste oils will be collected and
disposed of by a licensed specialist contractor. Static plant, i.e. compressors, generators and
pumps, will be sited over drip trays. Approval will be obtaining approval (permit for discharge
point) for discharge of water pumped through dewatering Ground water shall be pumped away
and disposed of as directed in the discharge license. Refueling of plant will not be carried out
adjacent to water courses or rivers and mobile refueling bowsers will be equipped with spillage
kits, containing absorbent mats and granules etc., for which specific training in their use has
been provided by the manufacturer. Maintenance of plant all vehicle, plant and equipment will be
carried out at designated places, Spill kits will be carried by the maintenance team.
Weather Condition
Work shall not commence or continue in case of poor weather or visibility
Welfare Arrangements
The Project Manager will be responsible to ensure the provision of adequate resources for
welfare facilities on the project.
The following welfare arrangements will be provided for the project employees:
itThe Employer The Engineer ___| The Contractor The Subcontractor
DAMAC
(DANAC CRESCENT PROPERTIES LLC
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Drinking Water
+ Adequate water dispensers with provision of cold drinking water will be provided.
The water dispensers will be located at all shaded rest areas and of fices;
> Chilled drinking water will be provided at suitable points and marked “drinking water* using
the applicable languages required.
> Filtered will be available by maintaining water supply lines with filters, and that filters are
cleaned, replaced twice per week and records are kept.
> Water storage tanks are cleaned and maintained on monthly basis.
Drinking water will be provided in personal water bottles (BPA free) for all personnel on site,
> Drinking stations will be available at an approachable distance
Vv
Sanitary Facilities
DECC Project Management will ensure that appropriate welfare facilities are provided
‘and maintained according to the size of the workforce and nature of the work on the
project.
> DECC will provide an independent toilet with the mobile sewage system and with running
water,
> The site toilets shall be cleaned and sanitized on regular basis and the results of inspection
recorded,
> Toilets will be available at an approachable distance
Facilities for shelter and taking meals
DECC will make the following provisions:
> Provide sufficient and conveniently accessible air-conditioned rest areas closed to work area
> Eating on site is strictly prohibited, all workers will be taken on air-conditioned dining halls
with air-conditioned food storage areas.
Prevention of Heat Stress/ Heat Stroke
Heat Stress/ Heat Stroke are one of the main occupational health issues in
construction sites during the summer days, A Heat Lliness protection plan has been
developed prior to commencement of works, To prevent heat stress and heat stroke the
Project Manager will appoint a water superintendent prior to works commencing.
12The Employer The Engineer ___| The Contractor ‘The Subcontractor
iy die
DAMAC ee
DAAC CRESOENT PROPERTES LC sey 3a
tomers
Project: DAMA HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Emergency Arrangements
The (ERT) role is to manage any emergency situation which may arise on site. The ERT team shall
help to minimize any human suffering and economic losses that can result from emergencies.
The Emergency Response Plan is detailed in Project Health and Safety Plan.
Emergency number and response measures shall be displayed at worksites.
‘Summary of procedure
> Duty phone Holder responds to call and confirms details from caller
> Duty phone Holder assumes control stating he is the Person In Charge (PIC)
> PICalerts other ERT members to the scene
> PIC or other ERT member carries out an assessment and takes appropriate action
> PIC calls ambulance if necessary
> The PIC may also decide to call an external emergency services such as fire brigade or civil
defense ambulance service
> PIC instructs members to bring appropriate equipment i.e. first cid bag, rescue equipment,
chemical spill kits etc.
> PIC arranges crowd control/ security/ access egress issues.
> PIC announces end of drill and informs ERT Leader and senior construction manager of the
emergency Incident Reporting to Employer /PMC/ Supervisory Consultant
Arrangements by DECC to Report Incidents to Employer /PMC/Supervising Consultant,
DECC will inform Employer /PMC/Supervising Consultant in the event of the following.
> Fatality-Immediate
Serious/ lost time injury - within 30 minutes’ medical treatment injury
First Aid Cases - in monthly report
Significant near miss - within 30 minutes
Any environmental incident that requires the DECC to report to Dubai Municipality.
vvvyv
In all of the above cases the DECC HSE Engineer will notify the Employer / Supervisory Consultant by
telephone call and SMS immediately. DECC will prepare within 24 hours, an initial report, describing the
incident and issue to Employer / Supervisory Consultant. In the event of a serious injury or a significant
near miss/ environmental event, DECC will submit a detailed written investigation to Employer /
Supervisory Consultant within 72hours in the. In the event of a fatality a detailed written investigation
13The Employer
DAMAC
‘OWWAC CRESCENT PROPERTIES LLC.
The Engineer
ae oy je
Avif&Bintoak
The Contractor
The Subcontractor
Project: DAMAG HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
report,
luding police reports, is to be submitted to Employer / Supervisory Consultant within five
working days. In cases where sub-contractors are appointed, DECC shall ensure that the reporting
requirements of the relevant authorities and Employer are met. All incident records will be securely
retained as long as the site/ service are operational plus three years thereafter.
Legislation, References and Code of Practice
As per Contract Conditions and Specifications
>
vvvv
vvvvvvy
Relevant Authority Specifications (Dubai Municipality)
Project Quality Control Plan
Dubai Municipality Code of Construction Safety Practice - 2008
Ministerial Order 32/1982- Regarding the Determination of the Ways and Means to Protect
Employees against Occupational Hazards
DECC Environmental Management Plan
DECC Waste Management Control Plan
DECC Integrated Management System
TSO 45001:2018
DECC Project HSE Plan
DDA & DEWA Requirements
UAE Fire & Life Safety Code Practice 2018.
7. Material & Equipment
Compressor
Ett] eemareel ei Cutei-t|
14The Employer The Engineer The Contractor The Subcontractor
0
DDAMIAC CRESCENT PROPERTIES LLC
8 | Cleaning Tools/MDF/Screws
7.1 Resources
{Construction Manager — | Carpenter
I Engineer {Land Surveyor.
-QA/QC Engineer __
Foreman
| HSE Manager na HSE Personne) =
| Machinery Operator Laborers
8. Method / Procedure
8.1 Mock - Up
Prior to Fabrication, a Mock-up shall be installed at site which is made under approved sample submittal to
demonstrate aesthetic effect as well as qualities and material of execution.
‘The Mock up sample shall be approved by the engineer before installation of all the assembly for the
mentioned plots.
8.2 DELIVERY OF STORAGE AND HANDLING
* Deliver all items such as Wardrobe cabinet & other items to complete the assembly with protection cover
against dust.
© The internal shall be quality constructed at factory prior to delivery free from any defects. Any item shall
be replaced if found damage by Prestige Team.
15DAMAC oie | aT
‘DANAC CRESCENT PROPERTIES LLC.
The Employer The Engineer The Contractor The Subcontractor
Arif&Bintoak Sera
eee ECT ES
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
‘© Storage of materials at building site should be under with flat form with 10cm height from ground or out
flat surface. Packaging shall be kept dry and shall be stock of 6mm spacer for installation and air
circulation.
8.3 FABRICATION
8.3.1 Wardrobe Cabinet
All MDF Carcass, Shutter, & Drawer should be cut by using cutting equipment according to the
cutting list.
These edges shall be clean from dust or dirt for lipping.
Covered with Polythene Sheets for protection for dust.
Ensure that proper markings are in place for identification.
8.3.2 Installation of Wardrobe Cabinet
1.
geen
Ensure that the following conditions are met:
8, The location should be clear from any activities
b. The floor area is clean, dry and level.
Ensures the materials are in the right location according to the sizes.
Remove Packing Materials.
Assembling the Materials of Carcass.
Place Carcass and fix according to the approved shop drawing and ensures all are in leveled and
aligned. (The Maximum Tolerance of the Wardrobe Cabinet from the wall is 3mm),
Install the shutters.
Install the necessary accessories to completion.
Our site supervisor will check the complete Wardrobe Cabinet if all of the above procedure was.
done properly
16The Employer The Enaeer The Contactar The SuboonTaaor
DAMAC 2. |
AfeBintoak
‘| DEE
‘DANAC CRESCENT PROPERTIES LLC
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
9. Quality Assurance / Quality Control
The complete work shall be inspected by the consultant and approval shall be obtained for the
same, The following shall be maintained to control the Quality of work:
> Inspection & Test Plan
> Inspection Request
> Check Sheets
10. ITP & Checklist
= Inspection & Test Plan is attached in the Appendix - 2
~ Check sheet is attached on Appendix-3
11. Distribution
= Construction Team
= QA/QC Engineer
- Technical Office Team
- Safety Staff
7The Employer The Engineer] The Contractor The Subcontractor
DAMAC so: |
DAAC CRESCENT PROPERTIES LLC.
Ewe Ss
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Appendix - 1
Risk Assessmentst02 Ame znow-ez rani
‘jssody wounsedap fray axa yo soqureuse pue equows WED) aus € hg porydluoD 24 pjnoys woWSsaSse SIy “3LON
EON’
ON
STON !91eg moIRay
pasa
Ie yaya paxanpud> aq 04H} x0qIOo
‘Anayes pue Buyeug vs >uoN-4d |
‘PAMO|OS ARDNS
eq cr uonepuowworsseimoenueW «|
“ayauiowsue
payj9> Buisnsiseq quanbax,
aye yn109
‘Aouayadusoa Aed pays pue asua0y
avn pljen ssassod oj yei2d0 aues) +
‘sananpe
uy aypuey oy paultsse aq 01 1088
ppayyi90 Aued pay pue wwayadwiog |
papiooes
ue paujewujew aq 01
ue vosiad wayeduioo
SING, ‘Atep wo au0p 24 03 uonsadsul ue) |
sadaaya01s passe
ewig us pue papesiieg aq or ea.e Bun |
29u)8u3 aus 2
|
luo paloyjuows aq 03 paads pum « |
|
|
souo pue
s20usv3 paleug | senpiew | oxpaus zt] »| | swopnoy 0
a ars
nba 1 JonU09 40 sonpo4o
favor | seen | aaa prronvesiozoesict | Gyre) | sy | seen wernuas | asexsovonéursea | on
eu ys cage
SIOWSIA D "219d eu D ‘Auedordn) ‘SioweNUO® J8yI0 /aNst) ‘eeko|dwia 39300 EPEwEYe Oq IM I1e YeUM PUE OU
vauoe eag2eid |
‘p00 Mayes 99 84 3.
sveweunbou ymaa SHO
saBeuEW 3H
aie. paweynw
Ja8euey uonmnysuoy
Jase nay
sa8eueW 001d
pewiyy pez 18u3
woneusiseg
‘ls wuauissosse fu st
:uone|si#97 tha porajduioa uawissessy 41
zeoe-ov-er ea | (SVTHA ZZ€) SONZGISTY SHUVd STU DYNA 32og
‘eyo Ta8eg AINSSS3SSV STH SRIOM S3BOUTUVM “ALIALLIV‘toe Aneznou-sc-otHnts
Joquiause pue sequiaw wea 24s e Aq pore|dwo9 aq pinoys 1uaUsSaESE YE TON
EON ZoN—:ToN :ayeq maynay,
I T roma T fee zs
390 lene Bulpioy aq jjeys Si\e1ad0 uaudins
uauudinba pue ue ‘0M Iv | ‘pue awed
“paunoyed st yo Buuimuan0
aoueuazureus angeyuansid “uonipu0a so Budd,
p008 u ase weay vonsniisuc) quauidinte
‘242 -Aq pasn quowidinba ¥ apyan
lie eq Suynsua 404 ajqisuodsas
‘ag yeysseeveW weg, quawdinbs
“Ayange ers soud “sapiyon
2o9jd ust warshs mid axeudordde Aayonas Bune
aegi ansug 4321 ayp apuauwoD o1 puuosieg
0118 sannesado 943 0} payeaqunuiwo> oie Bunaaus
ue payaidusoa s1 wawayers pons, ‘suawaiuene
yeip aunsu 01 2BeUEW Dafoug
‘ils “ays 01
84108 a1042q uonanpul sHa ALorepueW
wey PEO
‘fowjod Supsionas
‘SH at9 papuane ancy raleud ayy
Jom syeas oun je eu aunsua_.|
sangesado
1904J0 38H
yo wawenou!
quawdinba 9 a/149n Aa hyodoug pue uoaerodo
ana] s0UBIy e 02 punos® wos euareus or aeueg ssappoy ys axa unyafon
9A iH | Ys or pasn 9q 01 s08e9 BURy) POI ‘Ainfu yeuarew | sjeuarew yo Buryus
eH pueH | payed pue paivadsuAued pauL | | pkweres yo Buje fuonewodsuest | 70
‘Auo punos8 pjanay pue
perpeduo> uo paivara aq oyaueg «|
Pamolio}
2g or 1uawoye%s pouaus panaiddy «
Paya Aued puna pue paredsuy
pueauey «|
ayn sepun
40 s89u eis 0} pemoyfe 51 2U0 ON,
‘peo} aya yum 1321U09 1aup BuIpione
saul] $e Buisn payionuoa aq 0} peor |
jozaReg ANINSSASSY SIE ‘SRIOM SIGOUGUYM :ALIALLOVtoe Amz0au ee rns
‘81 'speo| Suypuey oj LOM Jo wash | 1949
$2240 ‘pueA ul Bujdaayasnoy poo | 1 WUM ayayaquy
“uossed quareduleo & Aq paraidusoo
ue ano pauses Bujaq ase sippy
vwonzadsu) Ayep “wuowidinby pue weld
Up aunsue 01 19BeUE UE BL
“s101es0d0 je 03 won! Buyuies,
onippe
ty von2evaqut ploae 03 auor saying @
‘wequjew jeus avaudinda pue ru
{uauudinbs pue ued
410) pepinosd aq j1eys s0UsIMAUINA a
“soyesado au Jo} aye0y2109
fouaradwoo Aused pug panoidde
jam se yuawidinbs pue weld axa sos
ys90 sa uoRsedsul Led BIE
ide pve ‘squowno0p vonensifas
so squeuwseyue>
Je uoyss}uia ayy,
uauudinb
suyn/
yeu
vvonewour9jdu)
ave ye13 s123f00
40 5193/40
fneay Sunou
pue aunyn
Suypuey enue,
soi pue sus
'1ea8
souossas3e
aun
pue squaudinb3
jo sued dujnow
um s223U09
lewapeay
B10 € aBeg
ANAISS3SSW SITY
‘SOM S3POUCUWM FALIALLWsto Amv esou sc Oran
soquiow pue soqwaw wie as © Aq paraiduion 2q pinoys 1uawssa5Se WS LON
‘EON ZON ‘TON :21eq MaInOY
"ash 9g 03 H|a 7 =
Jeatn29j0 sadoug
juiem pue pasn
j2Ued jeaynn9j@ pue s.gq iedorg +
seaueydde ‘joued joa.99}2
Jeounpaya yee yum pasn 2g 03 Se913 + ulsea BussiN
hyo uawodeuew
s2jqe> eD.a39I8 parejnsulajgnop esr. « ajqeosedosdw) +
‘umes “si@yp05
Jana}904 ayn yim pauleruew oq reussnpuy
lieys 1283] y “sopunie> Ayduia /pasn suouyoasn +
jo aya jo wisias aun vo Aiuo panss) 'j002
js saBpunue9 aN * Jadaaya1035
huo> ANDLS 9q eys ans
Ue s1001 parssse sespneD +
spie0q us sadoud
Jeq 2g 01 ease YOM, + “syeojuey>
spien® auiyoeu Aq paxna.osd snopsezey
‘aq eys aunysew aun jo sued Sunency + yooinsoda
‘puezey ie) pue dit ‘ais Aue plone “ansopuiom
©) pauiewuiew 29 03 Suidaayasrioy pauenun
pue Ayadoud pasos 2g 01 peo} Anes
wonmon201g areds
sannesedg pparaplasuo aq 01 SWOUERLA OM + agewep | 0m: upay seqoups0%
4891410 38H ‘pom 241 304 poAo|dap aq 02 sua%.0m fusodorg 003, 404 51003 puey pue
uew0s Hp paouayade pue wareduion Alu + Aunfuy snows Buomdusn «| _sjoorsamogjoasn | £0
‘one(d Buinivas jevaiew pue 7
‘yoe1 a8eso%s jouarew ajgeqns aprnoig «|
svea pue sauauidinbe Buri 40 (1s)
‘uuuy Supjiom ajos poeaxa rou og |
‘desis 3ujpeo} a1eudosdde Avo pas)
‘saynou uauysopad poxseu-jom ajes |
mag 01 S228 IY |
“hoges qea ss030e 01
Sianp moje sieq geu8 pue sdais paxty
“pomoyjo} oq 0: warshs ayer Aem-2ug «|
papione
12911623 843 Jo pag ayy uo Supom,
ajopeaeg ANSINSSASSV STH SIYOM S3BOUGEVM =ALIALLWst0z Ane enouer rans
EON
‘ON
S14 ON
TON ‘leq MaInOy
sanyesado
ewes |
sanoj9 puey
‘s20u5
‘ayes
389\ INH
wim
40 a)gedea asmannis paxy 01
ajaissod 10
104m
uuiom pue sossousey Apog Inj ap!ncsg +
sseusey
‘ayes Apoa ny se yans weishs 50.18
lje}.8do.d Suisn ase saakojduia aunsug
‘uonysod 3ujyonos9 @ uj 90m 224
yo Aue 03 paau saahoidure araym
le aye/poun01 i1rsuI pue punoie
24 puey /Sia.seq puey sadoud
‘ney seaze Buns0m payenaa ie 2unsu3
ayeypau surg
sites puey sadosd yay Buypiojseas
/uuopeid Suuom ayes eaunsua
aBewep
huadoid «
suoysin pue
hyodous
249 on sewed
reyarew Jo nes
[euuosiad joes
29ppeijo.25n1
auBiey ze vom,
Ey
‘suoneinas
W186 se yo pasodsip pue
pay2e1109 9q oy aysem snopuerey ty +
son
‘fousdsaus
ja1od Aue puowe
‘oy ays ye aigeyiene 2q 0) 19pIe 3513+
“paddesaq orsieqai Buipnnicig +
‘als
ye ajgeene 9q oy aysINBUIAD O15 +
“squid ypurd wosy
sea day aq 01 sued Apog pue spueH +
“saSewep wou
9915 pue por9adsul 99 0% sjoon pul
gol 1yBls ayy 40 pasn 29 0}
uoswuadns
‘2418 Aq yers aus ye yim paronpuce
2g 013/21 xogjoo: pue Buyaug vst +
“pasn 9g 03 5}001
Jamod pue Addns samod AQET AUD +
papuno.8
8q 01 sjoued jeoyn29y0 pue
joyuoU 01 uoIsMNadns waradWIOD -
wate +
lw +
a0 50804
ANSINSSASSV ISTE
SHUOM S3GOUGEVM ALIALLWsro Aer ener orunuts
‘2fjssod | suounsedop Aaayes ayn so Jaquaus © pue saquiou weds aus Aa pevodwoo aq pious suaLI
‘EON
‘TON
56 9514 LON
TON :a1eq Majnay
SoD Saw
ayes away sayes'6an
yal) ofoud an Jos wawidinbs
anjaeioid (euosied Auoiepvew
‘BUR JBM 24S [BUUOSIOG |v -
seid
>yom ye Buidaayasnoy pod u
* aus ze ajqeyene 01 x0q ps
aim padinbs suapre asi paynead
‘29014 410m age}
0) ease Buuysom pu si9}01 3
sorrce aye sweusdueue
cae ns ple 8 pi oo
semnerado iv renoinpuy | #5100312 payrUao (I 0c so Auigeyeneun saainean
10440 38H S905 sped Hom e ayaeene nem | aosonpe u Sunuom
ewes ras | 9402 2:honDI9 @ J9teM SUNIL PION» so fugeveneun
souiiuaaus | | Senin wonsnegea 73 eee
seouitua nolo |v WH pIeH | 9g orstedous sos pa tp eaaitnsenitel ete eae veal Baan
wiley Wor
two 533)108
fe Aq usom ag asr st
‘uno waim sey pse
sion
‘Aq wom pue van ase sagg aunsug
‘Aunnoe
‘4 noyBnouyy voIsiuedns ayenbapy +
pa
pays sounseaus Aseuonnesaad wpm
‘duos pue yuiad 7e yom WeIGO +
5 40 je) 4 waKad
‘BROge 320M JO S040 wHO}U! OT
fiom mojaq siauieq pue suBisaigeying «
‘440% 41 01 paraNnpLUOD aq ASML
Je9 Nog oor Yom ayy UES O04 +
aiuemun quaneud 01 eave 110
smojaq Apauip aneds aun apentuieg +
20} 4191 x0qI00L +
8109 e8eg
LN3INSSASSV STE
‘ROM SIGONGUVM FALIALLOW‘toe Anezoaw-sc orunais
asd pt wounsedop Ayes a jo saquinu#pue sco wea as & hapa} 24 FyNOUsURLASESSE SION
fon Z0N TON sa1eq mayne
wor
sown suzunun Aiea prt
ue pooda1 2q 0 po}odene uy. =
eays uo.aq oe 7 eae |
uy suasod pue sul ssouaseme A Hel
ase senssguauene 9509.04 i swords
Payrrn pewseamshemy «| ‘tino
aia Anwonbaay pueyysem «| | Suniwon
peu saro05 uypew Buyound or 3008 | ue winoy
senojl puen | Josaiues apnoid pue ssnyues asm + sae0 ‘ued Apo uonuanoud
ysew 9984 atl y uuweoun | sumeisdun ya | 6rPiRe9 a1wopued | 90
830 £aBed
NBINSSASSV ISIE
‘SUOM SIBOUGUYM :ALIALLOW‘toe Ane nou sc orunats
2yqissod y awaunsedap Aros oy o s9quuow e pue soquraus ules aus € Aq paajdluo> 99 pANOUS WALISaSSE YS LON
ON ON ‘TON :21eq MANDY
‘ON
area aumeuais uoneusisaq auleN ou dug a
‘Pardope oq 07 jeys sainsesul [omU09 pu SYS “SpIEzeH] Oy POOISISPUN UE ped! SACU | PUE POJSLIG S| TUSUETOSTE NSU ANTE YL
840 g oBeg AN3SSaSSY SIE SOM S3EONQUVM. :ALIALLOWThe Employer The Engineer The Contractor The Subcontractor
DAMAC oie |
Arif&Bintoak
COMHAC CRESCENT PROPERTIES LLC
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Appendix - 2
Inspection & Test Plana
6740 2 28eg
TOS BIGEHHON TSTOT
Ul pue eiqertene e.e sj001 64) iy
of eu ysiuy 0} yBnous 5
18119980 Aunpoy oy, | XEN ®
S| S| HY) pisenbay Tes | ues asoyea | oo0ses ‘29g st
uonoadsuy oi ab ip ‘soeds ‘yoy
doys panoudde ou 49049
nel (ueweovewwog
Bumeip doys ponoidde ae cia 0
s]myu] am asia anoy 0} omnsu3 socoser 295 | SMOMMON) OUNIO | Ft
soads \piy
xuen 2
payeiduioo Auagoy eu Mi : :
S| HM] H | Bm | omen Avepnased oinsug | vers amon | 200821 209 | vonemeondous | 7
aS
xen? es uo
Hf ow | aw | UoReadsur ae ‘o0szt 29g | enjsoos ayy sienoudde | 4-4
ore °B 1BueIEW panoiddy Jog sy tee | Seen
Jed sy
SSLLUOHINY a oes eatin
BNO) POEL IESe | areas SUBLSWVEVd SONVUSIOL | 3ASNULLSAL ] O%0ds/6"0) | NOWLARHOSSISAL | oy
Kangnee ‘MRIALIHO 3ONV1d300¥ 0 4N3WN900 | /ALINJOVINCLLOZESNI
Me Aonanozud | 3ONaSS3
NOWSW/ALIIBISNOSS3Y Aun
md (s410m uapoom)
i = PAD YUIGeD oqoupseym 404 (dll) NVId LS ® NOLLOAdSNI
O0/LOO/ALIVOINAS "ON UO
SEIIIA LZE SIIIH DeWeQ eIII\ SeoUaPISEY Ye
(—— Me vila———————S_
62 J0 BT aBeg
yeanboy uonsedsuy 0M — YIM,
uonoedsuj — |
oden 3501 - aL
{wed PIOH ~ H
queynsuog ~ SNo syuauno0g Jo moInoy —
402811009 WeW- OW ‘SS0\N1M ~
sopenueo-qns 9/8 :aN3037 souelaning-$ 3009 NOLOY
4811 798UD Pir
H | oH |W | B38enbed | yeurges eqoupiem so Suysiuy. oe uoyoedsu} jeul4, Lb
Uuopoedsu »g Bujjone] ou yeuy eunsus, esa deed
HOM, "soeds “YoY
‘UO|PUCD ajqexJOm Jedoud
BYERE O12 $100} O44 IY
3811 30940 1uy 0} yBnoue S| Aunoy ey, | xuew e Suyjeysuy
S| S| H | gisonbey | jeuojew ojqelene oy auns oyew | we\g o1jog | googzi ‘eg e1pueHy 9 s100q oF
uojoedsuy ‘soedg “you
84} UHM pascoud 0} ‘sBuymeup
doys paroudde uj 40840
O0/F00/dLIVOINAS "ON WHO = =
SPIIIA LZE SII DELUEQ Bll S8OUAPISEY ed, Se
Se arravers 1 Seong sity
(—— Me Vilaa Zeno meeThe Employer The Subcontractor
DAMAC
(DAVAC CRESCENT PROPERTIES LLC
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
Method Statement for Wardrobe Works
Appendix - 3
Check sheet
20JAMAC 43 DELTAMgR mie jal
‘AriteBintoak
201.41
DAMAC Hills Parks Residence 327 Villas (0851)
Project Number
Project
client DAMAG Crescent properties
Employer 5
[consultant + Adf& Bintoak Consulting Architects & Engineors
IMain Contractor Datta Al Emarate Building contracting
[sub-contractor
CHECKLIST FOR WARDROBE
[wir No. Location: bate:
‘Checked by | Checked by | Checked by
is.no| Items to be checked Contractor | aC Team | Consutnat Remarks
le [Sle lz ls lelels
IHSE Requirements
1 [Althe HSE requirments are fuflled
[QA/QC Requirements
Ensure tools, equipment and materials are selected and checked prior
1. |to use to ensure that they are appropriate for the work serviceable andl
ina safe condition
[Ensure that colour and pattem sas per the approved Sample
Ensure that subcontractor end Method Statement epproved.
Locate uneven areas and shim wardrobe in order to make the
installation plumb, true and square
[Check dimensions of wardrobe conforms to approved drawings.
[check the outlines ofall the wardrobe on the wall marked to ensure
actual cabinet cimensions
Ensure the instalation of liner to wall and underneath the bottom
rack.
[check the installation oiler, drawer compartment, sheves and door
loanet
JEnsure that screwes tightens properly and the wardrobe is true, plumb
land level
Wardrobe is inspected for quality of work and repaired, refabriested oF
10 reinstalled as required in accordance with workplace procedures
Tr [Work areas cleaned and rubbish dispased of as appropriate
12. | Check installation ofronmongeries is as per the requirements.
For Final Approval
Contractor Site Engineer Contractor QA/QC Inspector Consultant Representative
IName Name: Name:
signature: Signature: signature:
ate: Date: pate:
TGC/QAQC/CHK/CVLWRB/O1 REV-00 Page 1 of 1The Employer The Engineer | The Contractor The Subcontractor
DAMAC oa
int
CHUA CRESCENT PROPERTIES LC corn | DELTA
Project: DAMAC HILLS PARKS RESIDENCE 327 VILLAS
it for Wardrobe Works
Method Statemen’
Appendix - 4
Key Plan
at