0% found this document useful (0 votes)
131 views6 pages

OEE Templet - Brewery

Uploaded by

Binod Kafle
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views6 pages

OEE Templet - Brewery

Uploaded by

Binod Kafle
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 6

CALCULATING OEE WORKSHEET

Overall Equipment Effectiveness


Line / Cell :
Process : OEE
Machine :
Date :
81.2%
OEE DATA
Shift Length (Minutes) : 480
Number of Shift(s) : 3
Short Breaks per Shift (Minutes) : Each (Minutes) : 10 Nb : 2 Total : 20
Meal Break per Shift (Minutes) : Each (Minutes) : 30 Nb : 1 Total : 30
Down Time (Minutes) : 30
Ideal Rate : (Pieces/Hour) : 1500 (Pieces/Minute) : 25
Total Pieces Produced per Shift : 9000
Rejected Pieces per Shift : 270

OEE VARIABLES CALCULATION


Planned Production Time (Minutes) : 1290
Operating Time (Minutes) : 1200
Good Pieces per Shift : 8730

OEE FACTORS CALCULATION


Availability 93.0% 90.0%
Performance 90.0% 95.0%
Quality 97.0% 99.9%
Overall OEE 81.2% 85.4%

120%
Calculated Factor World Class

100%

80%

60%

40%

20%

0%
Availability Performance Quality Overall OEE
Rate
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US
20%

0%
Availability Performance Quality Overall OEE
Rate

000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US
CALCULATING OEE WORKSHEET
Overall Equipment Effectiveness
Line / Cell : Bottling Hall
Process : Filling OEE
Machine : KHS
Date :
82.3%
OEE DATA
Shift Length 650 ml(Minutes) :
Shift Length 330ml (Minutes) : 1440
No. of Pieces per case (650ml) 12
No.of pieces per case (330ml) 24
Start up (650 ml)
Start up (330 ml)
Other SOR minutes (650ml):
(brand change, pack change)
Other SOR minutes (330ml): 195
Down Time (Minutes) 650 ml:
(All breaks- utility, Machinery, machine
Down Time (Minutes)330ml : 165
Ideal Rate (650ml) : (Pieces/Hour) : 15000 (Pieces/Minute) :
Ideal Rate (330ml) : (Pieces/Hour) : 18000 (Pieces/Minute) :
Total Production (650ml) cases 0
Total Production (330ml) Cases 10680
Total Pieces Produced : 256320
Rejected Pieces : 270

OEE VARIABLES CALCULATION


Planned Production Time 330ml (Minutes) : 1245
Planned Production Time 650ml minutes) : 0
Operating Time (Minutes) 650ml : 1245
Operating Time (Minutes) 330ml :
Good Pieces (Production) : 256050

OEE FACTORS CALCULATION


Availability 100.0% 90.0%
Performance 82.4% 95.0%
Quality 99.9% 99.9%
Overall OEE 82.3% 85.4%

120%
Calculated Factor World Class

100%

80%

60%
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)
40%
80%

60%

40%

20%

0%
Availability Performance Quality Overall OEE
Rate

000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)
ange, pack change)

s- utility, Machinery, machine idle time)

250
300

ss

000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)
verall OEE