CALCULATING OEE WORKSHEET
Overall Equipment Effectiveness
Line / Cell :
Process : OEE
Machine :
Date :
81.2%
OEE DATA
Shift Length (Minutes) : 480
Number of Shift(s) : 3
Short Breaks per Shift (Minutes) : Each (Minutes) : 10 Nb : 2 Total : 20
Meal Break per Shift (Minutes) : Each (Minutes) : 30 Nb : 1 Total : 30
Down Time (Minutes) : 30
Ideal Rate : (Pieces/Hour) : 1500 (Pieces/Minute) : 25
Total Pieces Produced per Shift : 9000
Rejected Pieces per Shift : 270
OEE VARIABLES CALCULATION
Planned Production Time (Minutes) : 1290
Operating Time (Minutes) : 1200
Good Pieces per Shift : 8730
OEE FACTORS CALCULATION
Availability 93.0% 90.0%
Performance 90.0% 95.0%
Quality 97.0% 99.9%
Overall OEE 81.2% 85.4%
120%
Calculated Factor World Class
100%
80%
60%
40%
20%
0%
Availability Performance Quality Overall OEE
Rate
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US
20%
0%
Availability Performance Quality Overall OEE
Rate
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internal useForm
0 in SRF Release : 1.10 US
CALCULATING OEE WORKSHEET
Overall Equipment Effectiveness
Line / Cell : Bottling Hall
Process : Filling OEE
Machine : KHS
Date :
82.3%
OEE DATA
Shift Length 650 ml(Minutes) :
Shift Length 330ml (Minutes) : 1440
No. of Pieces per case (650ml) 12
No.of pieces per case (330ml) 24
Start up (650 ml)
Start up (330 ml)
Other SOR minutes (650ml):
(brand change, pack change)
Other SOR minutes (330ml): 195
Down Time (Minutes) 650 ml:
(All breaks- utility, Machinery, machine
Down Time (Minutes)330ml : 165
Ideal Rate (650ml) : (Pieces/Hour) : 15000 (Pieces/Minute) :
Ideal Rate (330ml) : (Pieces/Hour) : 18000 (Pieces/Minute) :
Total Production (650ml) cases 0
Total Production (330ml) Cases 10680
Total Pieces Produced : 256320
Rejected Pieces : 270
OEE VARIABLES CALCULATION
Planned Production Time 330ml (Minutes) : 1245
Planned Production Time 650ml minutes) : 0
Operating Time (Minutes) 650ml : 1245
Operating Time (Minutes) 330ml :
Good Pieces (Production) : 256050
OEE FACTORS CALCULATION
Availability 100.0% 90.0%
Performance 82.4% 95.0%
Quality 99.9% 99.9%
Overall OEE 82.3% 85.4%
120%
Calculated Factor World Class
100%
80%
60%
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)
40%
80%
60%
40%
20%
0%
Availability Performance Quality Overall OEE
Rate
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)
ange, pack change)
s- utility, Machinery, machine idle time)
250
300
ss
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)
verall OEE
000000File : 670196053.xls
Copyright © 2004-2008 - Philippe Magnier# 08000SRF - General [Internal Use] - This mail, document is for general internalForm
0 use in Release
SRF : 1.10 US (2)