0% found this document useful (0 votes)
73 views1 page

COPC201 PP Order Settlement 1683715536

Uploaded by

akhil reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views1 page

COPC201 PP Order Settlement 1683715536

Uploaded by

akhil reddy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Production Costing Weekly Sharing Session, Singapore

Benedict YONG, Certified SDMM, FICO

COPC201 – PP Order Settlement Process


Site Accountant

PP201.
Production If not satisfactory, reverse Complete means:
Execution calculation (same tcode, - fully delivered [DLV], or If not satisfactory, no need
menu->reverse) - technically completed [TECO] reverse, just re-run KOC4 is updated.
KOB1 after CO88

5. Run Overhead 8. Run Variance


Calculation Yes Calculation
6. Completed?
(KGI4/CO43) (KKS2/KKS1)
1. Ensure FI / CO (DLV/TECO)
/ MM period are
open No
CO Postings (CO43)
Dr PP Orders If Complete:
Cr CC Dr Variance
*Based % on PP Cr COGM
Actual Cost 7. Run WIP 9. Run
2. Ensure material
cost & activity cost is
CC will not be exact zero Calculation Settlement
OBYC: Var = [PRD-PRF]
correct (for OH Cal) (KKAX/KKAO) (CO88) Offset = [GBB-AUF/AUA]

If not Complete:
If not satisfactory, no need Dr WIP (B/S) If not satisfactory, reverse
reverse, just re-run KOC4 is updated. Cr Technical offset (P/L) calculation (same tcode,
KOB1 after CO88 * Offset GL should
3. Ensure overhead menu->reverse)
not have cost element
rates (KZS2) or
OKG8=WIPR
split rules (OKES) are
correct
10. Review PP
Orders WIP / Var
(KOC4/KOB1)
4. Ensure PP Orders
cost debit/credit are
correct (KOC4)

End

You might also like