Itp & Check List For Fence

This document is an inspection and test plan (ITP) for horticulture works for a propagation and cultivation project. It outlines tasks, activities, acceptance criteria, verification points, and responsibilities for inspections during the project. Key activities that require inspection include: [1] document reviews of submittals, shop drawings, and design documents; [2] material inspections upon delivery; and [3] installation including mock-ups, setting out, and excavation. Inspections will be conducted by various parties and verification points are identified to ensure compliance with approved documents, specifications, and quality standards.

Uploaded by

Amran Hossain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views4 pages

Itp & Check List For Fence

This document is an inspection and test plan (ITP) for horticulture works for a propagation and cultivation project. It outlines tasks, activities, acceptance criteria, verification points, and responsibilities for inspections during the project. Key activities that require inspection include: [1] document reviews of submittals, shop drawings, and design documents; [2] material inspections upon delivery; and [3] installation including mock-ups, setting out, and excavation. Inspections will be conducted by various parties and verification points are identified to ensure compliance with approved documents, specifications, and quality standards.

Uploaded by

Amran Hossain
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Project / Package: CP12.

0 Inspection and Test Plan (ITP) Legends

Contract No.
20230329004 SCOPE OF WORK Horticulture Works for Propagation and Cultivation of plants - production nursery for King Salman Park H - Hold Point R - Review Point

Discipline Civil ITP Reference No. Rev. No. 00 Date 8-May-23 W - Witness Point S - Surveillance

Verification and Inspection Points


Task Activity Reference Acceptance Verifying
Type of Inspection Frequency Remarks
No. Description Documents Criteria Documents Subcon / Main
PMCM3 PMCM1 PMO KSPF Authority
ITL Contractor
1.0 Documents Review

As per design
Pre-Qualification Prior to start of work Approved PQD
1.1 Document Review drawing and Project Engineer's Approval N/A H R R R R N/A
Submittal Approval (100%) Submittal
Specification

Approved drawings
As per design
Material Submittal Prior to start of work Compliance with Approved MAR
1.2 Document Review drawings and Project N/A H R R R R N/A
Approval (MAR) (100%) Specification / Submittal
Specification
Engineer's Approval

As per design
drawings.
Engineeris Approval
Manufacturer / Prior to start of work Approved Shop
1.3 Shop Drawings Document Review on latest revision of N/A H R R R R N/A
Supplier (100%) drawing
relevant Drawings.
reccomendation and
Project Specification

As per design
drawings. Compliance with the
Manufacturer / Prior to start of work Materal Approval Approved Method
1.4 Method Statement Document Review N/A H R R R R N/A
Supplier (100%) submittal & Statement
reccomendation and Specification
Project Specification

As per design Compliance with the


drawings. Materal Approval
Mix Design Manufacturer / Prior to start of work submittal & Project Approved Concrete
1.5 Document Review N/A H R R R R N/A
Concrete Supplier (100%) Specification / MES Mix design
reccomendation and / Approved Shop
Project Specification drawing

2.0 Material Inspection

As per Project
As per approved
Materials Receiving Specification / Approved Material
Each delivery Mix Desing /
2.1 Inspection Physical Inspection Approved Material Inspection Request N/A H H W R R N/A
(100%) material submittal/
Submittal/Approved (MIR)
DN
Shop Drawings.

Manufacturer Data
Sheet /
Material / Product Project Specs / Manufacturer Data
Reccomondations /
2.2 Storage and Visual Inspection (100%) Approved MAR / Sheet and N/A H W S S R N/A
Project Specs /
Handling MES / MIR Reccomondations
Weather
Changes/Conditions

3.0 Installation
As per approved
Mock-up IRE for Project Specs / Approved IRE /
construction drawing
3.1 Installation of Chain Visual Inspection Prior to Execution Approved MAR / Checklist / Survey N/A H W W R R N/A
and Project
Link Fence MES / MIR Report
Specification
As per approved As per approved
Setting out and Visual As per approved
drawing / Project Prior to Excavation drawing / Survey
3.2 Excavation Inspection/Survey drawing / Suevey N/A H W R R R N/A
Specification / ITP (100%) Data / Project
Inspection Check Ref.0001 Specification Report

As per approved As per approved


In-Process Check Approved IRE /
3.3 Auger Depth Visual Inspection drawing / MES / drawing / Project N/A H W W R R N/A
(100%) MES / Checklist
Project Specification Specification
Compliance with the
As per approved Approved Shop
Each Area Pre- approved Shop
3.4 Post Installation Visual Inspection drawing / Project drawing / MES / N/A W W W R R N/A
installation drawing. Project
Specification Specs and MES Checklist
Compliance with the
As per approved
Physical Inspection Every Casting approved Shop Approved IRE /
3.5 Concrete Casting drawing / Project H H H W R R N/A
& Testing Activity drawing. Project MES / Checklist
Specification Specs and MES
Compliance with the
As per approved
Chain Link Fence In-Process Check approved Shop Approved IRE /
3.6 Visual Inspection drawing / Project N/A W H W R R N/A
Installation (100%) drawing. Project MES / Checklist
Specification Specs and MoS
As per approved As per approved Approved IRE /
Each Area Pre-
3.7 Bracing System Physical Inspection drawing / Project drawing / Project Shop drawing / N/A W W W R R N/A
Specification installation Specification Checklist
4.0 Testing

Compliance with the


approved Shop
Physical Inspection As per Project Every Casting Approved IRE /
4.1 Concrete Sampling drawing / Mix H H H W R R N/A
& Testing Specification Activity Checklist
Design / Project
Specs and MES

Compliance with the


Physical Inspection As per Project 115 cum / Concrete approved Shop Approved IRE /
4.2 Concrete Testing H H H W R R N/A
& Testing Specification design drawing. Project Checklist
Specs and MES

5.0 Completion and Handover

As per approved Once after As per approved As-


All record signed off construction drawing Completion of all Project built drawing & Test
5.1 Review H H R R R R N/A
and Closed and Project Chain Link Fence Specification Report (Original)/
Specification Work (100%) Approved IREs

H - Hold Point W - Witness Point S - Surveillance R - Review


Written notification required. Contractor may not proceed activities Written notification required. But, Contractor may proceed if No notification required. But, activity may be Record / Documents review for conformance.
beyond this point without Approval or Acceptance from the Engineer. Engineer do not attend. subjected to Engineers's surveillance / monitoring
King Salman Park
CP12.0 / Horticulture Works for
Propagation and Cultivation of plants -
production nursery for King Salman
Park

Chain Link Fence Inspection Report

IR No.: Checklist No.:

Drawing No.: ITP No.

Location Area: Date:

S/N Inspection Steps YES NO N/A REMARKS

1 Only approved materials are delivered and installed.


Materials are stored and handled properly.
2

Setting Out and Excavation level Shall be as per approved IFC/SHD


3
Drawing.
4 Auger Depth level Shall be as per approved IFC/SHD Drawing.

5 All Posts installation Shall be as per approved IFC/SHD Drawing.

Concrete Pouring, Sampling, Testing & Curing Inspection :

6
Concrete sampling shall be done by an approved independent laboratory.

The maximum placing temperature of the concrete at the point of placing


7
shall not be more than 32°C at the commencement of concreting and shall
not rise to more than 32°C during concreting.

Slump shall be within the tolerance limit as per approved Concrete Design
8
mix.

Compressive test samples shall be made with a frequency of not less


9
than 115 cu. m., per concrete design, or as agreed with the Engineer.
Concrete Samples shall be made and cured in accordance with ASTM
C 192/C192M and tested in accordance with ASTM C 39/C39M.

10 Chain link Fence installations shall be as per approved IFC/SHD Drawing.

11 Bracing System shall be as per approved IFC/SHD Drawing.

12
All Installation shall be completed as per approved Drawing.

Note:
Remarks:

Contractor:NCC PMCM: WSP Consultant

CONSTRUCTION REPRESENTATIVE CONSTRUCTION REPRESENTATIVE


Waleid Hassan
Name, Initial Name, Initial
and Date 08-05-23 and Date
QA/QC INSPECTOR QA/QC INSPECTOR

Amran Hossain
Name, Initial 08-05-23 Name, Initial
and Date and Date