0 ratings0% found this document useful (0 votes) 188 views13 pages6T-7401-020 Working (Em'cy Fire Pump)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
GUSHIN SHIN
SPECIFICATION OF PUMPS
Aer HYUNDAI HEAVY INDUSTRIES CO.,LTD
HYUNDAI SAVHO HEAVY INDUSTRIES CO. ,LTD
HULL NO. 2714-27 16, S737 /S738
STATS FOR WORKING
* THE FINAL PAINTING : Munsell No. 7.5 BG 7/2
iE
No. OATE DESCAIPT ION PREPARED BY
8814038 2014-02-07 FOR WORKING S.H NOH
SHIN SHIN MACHINERY CO., LTD
HEAD OFFICE : 85, Nonggong-gi!, Jeonggwan-nyeon, Gi jang-gun, Busan, KOREA (ZIP CODE
619-961)
Phone : +82-51-713-0000 Fax : #82-51-727-5905~08 Home Page : http: //mw..sspump.comWARNING
1. Health & Safety Act Compliance. Before working on this equipment personnel
should be made aware of, and ensure compliance with, the Health & Safety
Regulation appropriate to this class of work.
2. Before lifting, installing or operating the unit, the instructions detailed below,
and also the accompanying manual, must be read.
3. Ensure that all equipment used for lifting the units adequate for the weight.
The weight is normally stenciled on the unit and/or stamped on the machine
nameplate.
4. The handling points are indicated on the unit and these must be used. The
hooks of slings must not befitted directly to lifting eyebolts or lugs, shackles
must be used.
5. Before running the unit, check if the rotating direction of pump and motor is
same.
6. The unit must not be run unless all protective guards supplied with the equipment
are in position.
7. Ensure that coupling cover must be installed.
8. Keep away hand, clothes and body away from rotating part.
9. Before proceeding with maintenance on the unit, or making adjustments to its
connections and fittings, it must be stopped and isolated electrically and
mechanically and visible waring notices displayed. Some units are on automatic
standby duty, or isolators are remote from the unit, and extra care is then
necessary to be sure that isolation is complete.
10. Before commencing repair or overhaul a preliminary check of available spares
must be made, e.g. replacement set of o—rings, joints or jointing material.
11. Only adequately qualified personnel familiar with type of equipment should
make adjustments or undertake maintenance.
12. Pumps handle variows liquids, sometimes not those for which the pump was
initially supplied.Know the properties of the liquids that have been pumped,
and actions necessary to make handling safe and in the event of an emergency.
13. Before commencing work in a pump, close the suction and discharge valves in
the system pipelines and remove the cading drain plug to ensure that the pump,
interior is at atmospheric pressure.
(65 SHIN SHIN MACHINERY Co.,LTDMESSRS.
HYUNDAI HEAVY INDUSTRIES CO.,LTD / HYUNDAI SAMHO HEAVY INOUSTRIES CO. .LTD
HULL NO.
2714-2716, S737 738 GAUGE TYPE (75 LIQUID FILLED )
No. ‘SERVICE NAME WODEL wovor | a'Ty | suc. GAUGE | DIS. GAUGE | REMARK
EMERGENCY FIRE PUNE lve 125 shal x 2° | 1 SET 7606 - oka/on* | - 15xq/cn* |vACAM PU
ee
ww
SHIN SHIN MACHINERY CO., LTD.Pon MESSAS. [fon Sara ar iS 0,10
HULL NO. [2714-27 16, S737/S738
FI (viewing (rom ceiling) ~ vertical Gntroga! pnp pe Rint Seay
8 (ue Bord) 7 Berio Bs) (Prins Deis) ee
ys
H 0.8 (operetion Sige}
oe)
0.5 (eration Side)
5 (Viewing (van exilig) ~ Noize
Cearitogel pap ype
GB (Gouge Berd) Terie Bo)
6B view Point (E) G0 ie
u | aL eS
| £
¢ 0
Avie Point | ic | caview point
1, The gauge board(GB) can not be fitted on the SHC, MLO, TANK : Hull Fit
2. The terminal box(TB) and gauge board(GB) can not be the same position.
3, Position of Self-priming decice can not be the same as the terminal box(TB) and
‘gauge board(GB) position
4, Operation Side can not be changed for the marked ) punp aodels. : SVS, SIT
POSITION
No. ‘SERVICE NAME ary | Moo | Fig ae = a
1 feveasency FIRE PU 1 ser [ve 125 af2| es F (UO [vacuum pur
|
(SHIN SHIN MACHINERY Co., LTD.GAUGE BOARD FOR HULL FIT PUMP
"HULL TYPE : GENERAL SERVICE
SERVICE NOE
SUCTION GAUGE.
DISCHARGE GAUGE
HULL TYPE : MAIN L.O. PUMP
210
DISCHARGE CAUDE
408 HOLE
Wika, Pa]
i WN 0. Fe]
Pump Cosing
Pump Cesing
No.
1__| SUCTION GAUGE COMPOUND. GAUGE
2 _| DISCHARGE PRESSURE GAUGE
3 | GAUGE BOARD
4 | NEEOLE VALVE
5 | BITE TYPE UNION @8 Copper pipe Connect ion
\$3) SHIN SHIN MACHINERY CO., LTD.| |
| | |
| |
seo sa | mil wl avs mend
| | |
|
| | | | |
cen ce) me oa a 7 aa =
munis | seenue | minor = co) —_ Ao 00 aw R00 om
Errore ‘onan
[ {47°09 6aWSNON AAYSH OMMVS WONTAM/GLY'O0 S3RMLSNOM AAYAMIVGNNAN) “SSE SSO eaCENTRIFUGAL PUMP DATA SHEET
SHEET NO. 1
i HYUNDAI HEAVY INDUSTRIES CO. .LTO
HYUNOAI SAMHO HEAVY INDUSTRIES CO..LTD
HULL NO, 2714-2716,S737/S738
SERVICE EMERGENCY FIRE PUMP
REQ. NO. PEA HULL 1 SET
CLASSIFICATION ony
1.SPECIFICATIONS OF PUMP MODEL, VF 125
capacity 72 athe ROTATION
TOTAL HEAD 100 CLOCKWISE VIEWING FROM COUPLING
SUCTION HEAD a HYORAUL IC TEST 20 kg/on®
PUMPING LIQUIO SW FLANGE Size 125 Ax 125A
Liquio Tee © FLANGE RATING KS/JIS 5K x 10K
2 MATERIALS
casing BRONZE ( 806 ) SHAFT STAINLESS STEEL ( STS304 )
IMPELLER BRONZE ( 806 )
3. ACCESSORIES PER PUMP
PRESSURE GAUGE & JOINT 1 SET VACUUM PUMP 1 SET
COMPOUND GAUGE & JOINT 1 SET
JGAUGE ROOT VALVE ZEA
JGAUGE BOARD 1 SET
4.MOTOR (SUPPLIED BY YARD)
loureut 55 ki SyN.SPEED 3600 FM
VOUT /PHASE Hz a4ov / SPH / GOH — | INSU. CLASS F
ISTART METHOO AUTO-T/A
gS
SHIN SHIN MACHINERY CO., LTD.SERVICE NAME EERGENCY FIRE PUMP SHEET NO. | o
MODEL, VF 125 DRAWING NO. EVFO12000NA2KE
[TOTO
freien
58
9
60
s
Total Head (
50
opacity (n/n)
‘SPECIFICATIONS OF PUMP
Capacity. 72_ mine | REMARKS ~
Total Head 100 #
Puno Ef icieney sok
Break Horse Power 33.23 kw
SYN. Speed
|
S SHIN SHIN MACHINERY CO.,LTD. | ESTIMATED PERFORMANCE CURVE‘SERVICE NAME GMERGENCY FIRE PUMP ‘SHEET NO. 1
MODEL VF 125 DRAWING NO. ‘SVFOSXMBEBGO4ZN
28
1
6,
6.
27
“1
i
‘| «0
i
310.
an
230.
4.
3s
ase
ar wea at TA -
eT] we oF Pet wae oe] PT] we oF eae ae Sele
ie. fe SE ra ace —_|oacos | 1_|ame leran wiSie(Onr.) (wid sve. [53400 [S507
1 ]oanG OER oe faco —[excao| 1 oe]. mii wre 1
ev. [swer sramess ses _|srsooe [suse | 1 [ow.1| neces nev staess sve _|sreaoa [misoe [
ao. [ne owe acs —_leacaos | 1 [ow-2| corns rey CC a
so. [eee eon omen 1
oo. fos nw assTos 1
ra fo-ane en ae 1
for. fou sea ee fy 1
1 eonica A 1
far sea. cave ioe eee |
fas [zine move GER [oro face Joxans |r
foe. f2ne one Ze 1
sc. Josine WEN nG [Leno Tin won aca [eoane | 2
eso racF WoT) —[oeTiLE ST RoW |eoHs5 |roeso | 1
es. [owen on. crap ste [scan [sewn | - T=
as. n o.t wi sree. |ssaoo_|ssa00 | —
es. fours sce crite os Toi |eons6 [rose [1 _—
ee. or WE uo sre. scam soa _[ 1
ss. [carne Bact oreo sree [own sous | 1
so. exw StaIMess STE _[srsom Joos | 1 -
ser. se. woo wat imo ste |so100 _[ssaoo | «| |
}sca.1 [RETAIN waseenCiwe.) — |sTainwess srt sts904 |swsao4 | 1
(65) SHIN SHIN MACHINERY Co., LTD.
SECTIONAL DRAWING01
SERVICE NAME EMERGENCY FIRE PUMP
MODEL, VF 125 DRAWING NO. | OVF0120DX225sS1
NOTE
T.Terminal position & flowing direction
reference to Position list
{ep SUC, FLANGE DIS. FLANGE,
~ (KS/J1S 5K) (KS/JIS. 10K)
VIEW ACA
FOR REMOVAL
gl 8470
eee
—- 1 ——
= | | | |
TAs te
THE |
«|
% 8 Try
a se seo_|
ee z&
EA 8 |
sg ee CR
DIMENS 1ON rn MOTOR WEIGHT (kg)
og | FRAME NO. Tpuve [woTOR|WATER] TOTAL|
— | “2258 263 | 380 | 7 | 650
(G)SHIN SHIN MACHINERY CO., LTD. OUTLINE DRAWINGSERVICE NAME VACUUM PUMP
MODEL SNV 324 DRAWING NO. ASNV3210
[Bins DETAT FoR va PP
ower ta
=
vestmaner! rout
=
PUMP CASING
DINE FRE Te
(1)
|| o &
tyro, va tuto, va
pool. oar
ORL COPLINE
1S. FLANGE
HYD, PRESS.
DIS. FLANGE
@suin SHIN MACHINERY CO., LTD.
OUTLINE DRAWINGSERVICE NAME VACUUM PUMP
tora | 32nd
|
161
MODEL. SNV_32A DRAWING NO. SSNV32AB6B604XX0
20.1 421.1 525.1 923.1
931.1 | 360.1
230.
940.
922.
133.
761
762.
920,
762.1
(eae
925.2
PART | au oF ear a une
Fae CTE ae Ea ca
Sie Fale eo imonct———|ooe
Ae cove ee ent es
art [Sane SEL SNES TEs
ine — ene mss eo4
BL som ari SEE ‘Sine SE |stso@
"Tu sane [eer ste. — [a2 — stew ave woe cs occ
ARN STE cazso re eae nT ‘Sams SE [st6300 Soe [1
EARN COVER eno Feo ac nut [see S00 Tr
EAR COVER e2o0 eo TELL wT Sins S_[siss00 — [soe [1
SoG OSE caso eo eae A sie S08 1
oe wt juss Testo oor [7
oie — fs. [coe wr ‘ste Son [ssa 1
i st 5 oc wt se
Sri BC RANE OE ass Teas 11 semi ae wR 00
a Stier TER’ —[sweat set 16.1 [AA WAS STANT TER |stS800 Siow 1
tain GISe [sitet | soo sso 10.1 [ weluce nev [stares ster. [san0e | s300 77
even {sis |sswo —[ssao 1" 0.7 [atone cars sects se 1
cane ‘sit a {S500 91 AUT WEL [OST ROR [ot09| i
eter Sa ‘st a0 i
[rer fone sep i
(6) SHIN SHIN MACHINERY CO., LTD.
SECTIONAL DRAWING01
SERIVE NAME EMERGENCY FIRE PUMP
SPARE DRAWING NO. PVFO120DMX225SZ0
MODEL VF 125
SECTIONAL DRAWING NO.
— =
SECTIONAL
No.) NAME OF PaRT SKETCH MATERIAL He] DRAWING | REMARKS
PR PART ND,
ur wera 9) Pine | "she
Ea
1 [sate seane dat a fom fies gta] sto
ee |
ome we
Fy SHIN SHIN
2 |weciicat sea j—-—-{ rset setisy] 1 |giae
easel | 450m
| ot tg |
“0 zou
‘COUPLING BOLT rs vowpoi | ca | y | 866.1
5 —E 6 — ~|ser(s}
SELF Lock NUT we ste. [4 ca | 7.1
Lee WE 0.1 i | _
| 45 |
poh
| _ o2 ty |
| _
ee
SHIN SHIN MACHINERY CO., LTD.
ADDRESS ¢ 940-15, YERIMR! ,CHONGGHAN, CI JANG, PUSAN KOREA
FEL) Barsteiz7-5s00"d, Fax) a281-727-5805°8
SPARE PARTS LIST