0% found this document useful (0 votes)
63 views12 pages

1E ME0084RevD

This document is a datasheet for SW Drains Drum Slop Oil Pumps for the Offshore Gas Increment Program. It provides project information such as the contract number, location, plant, and unit. The datasheet also includes revision details and certification.

Uploaded by

karthickmectr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views12 pages

1E ME0084RevD

This document is a datasheet for SW Drains Drum Slop Oil Pumps for the Offshore Gas Increment Program. It provides project information such as the contract number, location, plant, and unit. The datasheet also includes revision details and certification.

Uploaded by

karthickmectr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

OFFSHORE GAS INCREMENT PROGRAM

Contract No.: 6600050846 (OOK)


BI-10-20857
DATASHEET FOR
SW DRAINS DRUM SLOP OIL PUMPS
D42-G-3504A/B

1E-ME0084

D 24-Apr-23 Issued For Design TY SSSSB/DE/RP SD


C 17-Jan-23 Issued For Design MBT SSSSB/SV/DE/RP SD
B 25-Nov-22 Issued for Client Review MBT SSSSB/SV/DE/RP SD
A 10-Nov-22 Inter Discipline Check MBT SSSSB/DE RP
Rev Date Revision Description Prepared By Checked By Approved By

Document Classification
Project: OFGI - OFFSHORE GAS INCREMENT Index: G - LIQUID HANDLING EQUIPMENT

Location FADHILI Discipline: ME - Mechanical Engineering


Plant: GAS PLANT Document Type: DAT - DATA SHEET(EXCEL ONLY)
Unit: D42

Proprietary – Third-party Confidential.


Paper copies of this document are uncontrolled.
REVISION CERTIFICATION EDSD VERIFICATION REV
DATE JO/EWO DESCRIPTION ENG'G CERT. PMT OPRNS

DATE
DATE
DATE
DATE
DATE
THIS INDICATES THAT REV NO NO.
D OF THIS DRAWING IS CONTROL NUMBER A 11/10/2022 BI-10-20857 ISSUED FOR INTER DISCIPLINE CHECK MBT SV/DE/RP RP
COVERED, FOR ALL

TY
B 25/11/2022 BI-10-20857 ISSUED FOR CLIENT REVIEW MBT SSSB/SV/ SD
APPROVAL/CERTIFICATION BY:
DE/RP
REQUIREMENT, BY DRAWING

CERTIFIED
SSSSB/SV

24/04/2023
C 17/01/2023 BI-10-20857 ISSUED FOR DESIGN MBT SD

OPERATIONS
COMPLETION CERTIFICATE /DE/RP

CONSTRUCTION
PROJECT ENGINEER
(DCC) NO. SSSSB/DE

DISCIPLINE ENGINEER
DATE: D 24/04/2023 BI-10-20857 ISSUED FOR DESIGN TY SD
/RP
Saudi Aramco 2616-ENG(10/2002)

ITEM N0. D42-G-3504A/B

OFFSHORE GAS INCREMENT PROGRAM


SERVICE : SW DRAINS DRUM SLOP OIL PUMPS
DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS
DAT
FOR

DWG.TYPE
BI-10-20857
DATASHEET

D42
D42-G-3504A/B

SAUDI ARABIA JO/EWO-


PLANT NO.
AND IS SUBJECT TO REVISION PENDING RECEIPT OF GIP LICENSOR DATA
SAUDI ARABIAN OIL COMPANY

G
INDEX

DOCUMENT CLASS 1
BI-10-20857
SW DRAINS DRUM SLOP OIL PUMPS

OFFSHORE GAS INCREMENT PROGRAM

DRAWING NO.

1E-ME0084
NOTE : THIS DOCUMENT IS BASED UPON EXISTING FADHILI EQUIPMENT DATA SHEET: D42-G-RE-459704 REV 003

DSN:
11
OF
SHT.NO.

4774
D
REV.NO.
THIS DRAWING AND THE INFORMATION CONTAINED WITHIN HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR PART SHALL BE OBTAINED FROM THE DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
Saudi Aramco 2741-ENG (07/2013)

SAUDI ARABIAN OIL COMPANY


OPRNS
PMT

SD

SD

SD
RP

SSSSB/SV/

SSSSB/SV/
SSSSB/DE

SSSSB/DE
TABULATION OF REVISED SECTIONS / PAGES
DE/RP

DE/RP
CERT.

/RP
REVISION PAGE / SECTION DESCRIPTION
ENG'G

A All Issued for Inter Discipline Check


MBT

MBT

MBT

TY

B All Issued for Client Review

C - Issued for Design. COMPANY comments clarified in CRS.


ISSUED FOR INTER DISCIPLINARY CHECK

C Page 6 of 11 Added 'IF REQ" for drawings


ISSUED FOR CLIENT REVIEW

ISSUED FOR DESIGN

ISSUED FOR DESIGN

C Page 7 of 11 Update BEDD document number


DESCRIPTION

D Page 7 of 11 Note 4,5,21,22,23,24,27,33,39,41,43 Deleted

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
D Page 7 of 11 Note 49 added

D - Issued for Design,Client E-review comments incorporated


BI-10-20857

BI-10-20857

BI-10-20857

BI-10-20857
JO/EWO

17/11/2022

02/12/2022

17/01/2023

24/04/2023
DATE
REV NO.

D
A

DISCIPLINE ENGINEER
TY
DATE 24/04/2023
PROJECT ENGINEER
TABULATION OF HOLDS
DATE

CERTIFIED HOLD NO. PAGE / SECTION DESCRIPTION

DATE

CONSTRUCTION AGENCY

DATE

OPERATIONS

DATE
EDSD VERIFICATION

CONTROL NUMBER

DATE:
BY:

REQUIREMENT, BY DRAWING COMPLETION


THIS INDICATES THAT REV NO D OF THIS

FOR ALL APPROVAL / CERTIFICATION


REVISION CERTIFICATION

CERTIFICATE (DCC) NO.


DRAWING IS COVERED,

DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS DWG.TYPE PLANT NO. INDEX DOC NO. SHT. REV.NO
ITEM NO. D42-G-3504A/B DAT 2
D42 G 1E-ME0084
SERVICE : SW DRAINS DRUM SLOP OIL PUMPS OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA JO/EWO- BI-10-20857 11
SAUDI ARABIA
Saudi Aramco 2748-ENG (11/2010)

THIS REVISION IS NOT TO BE USED


SAUDI ARABIAN OIL COMPANY

FOR CONSTRUCTION UNTIL


CERTIFIED AND DATED
CENTRIFUGAL PUMP DATA SHEET FOR VERTICAL LINE SHAFT PUMPS
NOTE:
INDICATES INFORMATION TO BE COMPLETED BY PURCHASER; BY MANUFACTURER OF PUMPS ACC. 31-SAMSS-4
REVISION DESCRIPTION

D BY MANFACTURER OF PUMPS ACC. MANF'R STD.


24/04/2023 ISSUED FOR DESIGN

PURCHASERS REFERENCES DESIGN OPERATING / INSTALLATION DATA


FIG. 1 CLOSED SUCTION SYSTEM
APPLICABLE TO: PROPOSALS PURCHASE AS BUILT AT NOZZLES CL

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
TOTAL SUCTION HEAD FT
/ PUMP Mfr. TOTAL DIFF. HEAD FT
/ SIZE & TYPE TOTAL DISCH. HEAD FT
/ SERIAL NO.
BI-10-20857
DATE

DRIVER TYPE ELECTRIC MOTOR (Note 8)


JOB ORDER/EWO NO.

THIS DATA SHEET COVER 2(1duty,1stand-by)(NOTE1) PUMP(S) NOZZLE CL ABOVE DATUM FT


PUMP MARK NO(S): D42 G 3504 A , D42 G 3504 B DATUM ELEVATION FT
G , G NPSHA AT DATUM FT
REV. NO.

G , G
D

DRIVER DATA SHEET SEE PAGE 9 & 10 OF 11


GEAR UNIT DATA SHEET
LUBE OIL SYST. DATA SHEET
SAFETY INSTRUCTION SHEET
BY/DATE
OTHER

LCC EF $ / kW
BARREL WALL THICKN. IN
DESIGN OPERATING DATA BARREL OD IN asd
BARREL LENGTH FT
SERVICE CL 1st STAGE IMPELLER
OPERATIONS/DATE

TO CL SUCTION NOZZLE FT
CONTINUOUS INTERMITTENT STANDBY
REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

ATTENDED UNATTENDED
PUMP FUNCTION SW DRAINS DRUM SLOP OIL PUMPS MOUNTED ON CONCRETE
INDIVIDUALLY IN SERIES IN PARALLEL MOUNTED ON STRUCTURAL STEEL
UPSTREAM OF PUMP NO(S). G
G
CONST. AGENCY/DATE

DOWNSTREAM OF PUMP NO(S). G


G

FIG. 2 OPEN SUCTION SYSTEM (FOR DRUM DRAWING REFER PAGE 8)


LIQUID CHARACTERISTICS CONCENTRIC RISER COLUMN
LIQUID PUMPED SLOP OIL(Note 2) TDS 120 PPM SIDE DISCHARGE PIPE
0
NORMAL FLOW TEMPERATURE F 46.6
0
MAX. FLOW TEMPERATURE (Note3) F 230 / NOZZLE CL ABOVE DATUM FT (*)
RELATIVE DENSITY AT NORMAL FLOW TEMP. 0.901 DATUM ELEVATION FT
CERTIFIED/DATE

VISCOSITY AT FLOW TEMP. (Note 29) CS / CP / SSU 23.6


VAPOR PRESSURE AT NORMAL FLOW TEMP. PSIA 15.69
DESIGN CERTIFICATION

V.P. AT MAX. FLOW TEMP. PSIA 15.69


(DESIGN AGENCY)

TSS NONE PPM UNKNOWN


CHARACTER OF SOLIDS: PULPY GRITTY HARD SOFT STATIC LEVEL FT (*)
GAS IN FLUID: NONE VOL. % UNKNOWN
PRINCIPAL CORROSIVES: (NOTE 2)
PH CI PPM PUMPING LEVEL FT (*)
ENGG./DATE

/ MIN. LIQUID LEVEL FT

OPERATING CONDITIONS / CL FIRST STAGE FT


CAPACITY NORMAL USGPM 34.7
RATED USGPM 34.7 BOTTOM OF BOOT (NOTE 42) FT (*)
TOTAL DIFFERENTIAL HEAD (Note 14) FT 136.9
VISCOSITY CORRECTION FACTORS CQ ; CH ;CE (Note 29) 0.921 0.92 0.7 MOUNTED ON CONCRETE
IS COVERED, FOR ALL APPROVAL

CLOSED OPEN SUCTION SYSTEM


AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

FOR CLOSED SUCTION SYSTEMS: ENTER DATA ON FIG. 1 MOUNTED ON VESSEL NOZZLE (NOTE 45)
NPSH AVAILABLE AT SUCTION FLG. (NOTE 25)
AT RATED CAPACITY FT 7.21
AT 120% OF RATED CAPACITY FT 7.21
REVISION VALIDATION

RATED SUCTION PRESSURE PSIA 18.5 SITE CONDITIONS


DRAWING COMPLETION CERTIFICATE NO.

MAX. SUCT. PR. AT RATED CAP. PSIA 21.2


MAX. SUCT. PR. AT SHUT-OFF PSIA 21.2 INDOOR OUTDOOR UNDER ROOF
RATED DISCHARGE PRESSURE PSIA ON SHORE COASTAL OFF SHORE
MAX. DISCH. PR. AT RATED CAP PSIA ELECTRICAL AREA CLASS Note15 , DIV. , GROUP
OPEN SUCTION SYSTEMS: ENTER DATA ON FIGURE 2
D

TOTAL DIFFERENTIAL PRESS. PSIA 53.84


THIS REVISION NO.

DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ITEM N0. D42-G-3504A/B DAT 3


SERVICE:SW DRAINS DRUM SLOP OIL PUMPS D42 G 1E-ME0084 OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA 11
EKRD/2748-1-1110.XLS
Saudi Aramco 2748-ENG (11/2010)

THIS REVISION IS NOT TO BE USED FOR


CONSTRUCTION UNTIL CERTIFIED AND
SAUDI ARABIAN OIL COMPANY

REV
CENTRIFUGAL PUMP DATA SHEET FOR VERTICAL LINE SHAFT PUMPS
PERFORMANCE DATA PUMP CONSTRUCTION DATA (CONT'D)

DATED
REVISION DESCRIPTION

ISSUED FOR DESIGN


PERFORMANCE (NOTE 32) NOZZLES SIZE RATING FACING LOCATION D
/ SUCTION IN
/ / DRIVER NAMEPLATE POWER RATING HP DISCHARGE IN
/ / RATED SPEED OF DRIVER RPM

MIN. CONT. FORCES AND MOMENTS


NORMAL 100% 120%
STABLE
FLOW FLOW FLOW / ALLOWABLE FORCES AND MOMENTS
FLOW

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
24/04/2023

BOWL ASS'Y HEAD FT SUCTION DISCHARGE EACH NOZZLE


DATE

COLUMN LOSS FT Fx lb Fx lb Mx ft-lb


BI-10-20857

EFFICIENCY % Fy lb Fy lb My ft-lb
JOB ORDER/EWO NO.

REQUIRED POWER HP Fz lb Fz lb Mz ft-lb

VEL. IN COLUMN FPM


REV. NO.

NPSHR FOR CLOSED SUCT. SYST. AT CL 1st ST. IMPELLER QTY. SIZE TYPE
D

3% DH ON WATER FT MISC. CONNECTIONS

40,000 HRS LIQ'D PUMPED FT BARREL VENT

NPSHR FOR OPEN SUCT. SYST. AT CL 1st ST. IMPELLER BARREL DRAIN D
3% DH ON WATER FT SEAL LIQUID INLET
BY/DATE
OTHER

MIN. SUBM. REQ'D. FT SEAL LIQUID DRAIN

STUFFING BOX VENT

PRESSURES (NOTE 3,17) MAX. ALLOW. D


SHUT-OFF HEAD AT ACTUAL IMP. DIA FT WORK. PRESS
HYDROST.
OPERATIONS/DATE

AT MAX. IMP. DIAM. FT AT O


F TEST PRESS.
/ PRESSURES
CAPACITY AT END OF CURVE US GPM

TOT. DIFF. HEAD AT END OF CURVE FT


REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

BOWL ASSEMBLY PSIG


RATIO-SHUT-OFF HEAD / RATED HEAD

RATIO-END OF CURVE CAPACITY / RATED CAP. COLUMN ASSEMBLY PSIG

MINIMUM CONTINUOUS STABLE FLOW US GPM HEAD ASS'Y (DISCH.) PSIG

MINIMUM CONTINUOUS THERMAL FLOW US GPM HEAD ASS'Y (SUCT.) PSIG


CONST. AGENCY/DATE

MAXIMUM OPER. TIME AT SHUT-OFF SECOND SUCTION BARREL PSIG

FIRST CRIT. SPEED. DRY RPM MECH. SEAL PSIG

FIRST CRIT. SPEED. WET RPM

MAX. ALLOWABLE SPEED (Note 24) RPM

MAX. UPTHRUST LBS SHAFT DATA D


MAX. DOWNTHRUST LBS SHAFT DIAMETER AT MECH. SEAL SLEEVE IN

MAX. POWER FULL CURVE ACTUAL IMP. DIAM. HP SHAFT DIAMETER AT BEARINGS IN

POWER AT SHUT-OFF HEAD HP TOTAL ROTOR LIFT IN


CERTIFIED/DATE

SHAFT COUPLING KEYED


DESIGN CERTIFICATION
(DESIGN AGENCY)

SHAFT SEALING (NOTE 9,28) D


PUMP CONSTRUCTION DATA (NOTE 30,45)
PACKED STUFFING BOX / PACKING MAT'L D
PROVIDED WITH LANTERN RING: YES NO

PUMPBOWL TYPE SEALING ARRANGEMENT / THROUGH SEALING


ENGG./DATE

/ SINGLE VOLUTE / DOUBLE VOLUTE / DEAD ENDED SEAL

/ QUADRANT VOLUTE / DIFFUSOR FLUSHED WITH / LIQUID PUMPED / GREASE

/ THREADED BOWLS / BOLTED BOWLS / FOREIGN LIQUID / BLEED OFF

LINE SHAFT MECHANICAL SEAL. API CODE C2A3A (3CW-FB)


/ OPEN / ENCLOSED API CODE MAT'L 3RD LETTER

/ FLANGED / THREADED 4TH LETTER

THRUST BEARING IN 5TH LETTER

/ PUMP / DRIVER / MAKE

SUCTION STRAINER / MANUFACTURER MAT'L CODE

/ BASKET / CONE / NONE MODEL


IS COVERED, FOR ALL APPROVAL

BARREL INSULATION PIPING FOR PRIMARY SEAL API FIG. D-2 PLAN 13 / 53B
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

YES, PROVISIONS ONLY NO PIPING FOR THROTTLE BUSHING OR

THICKNESS IN AUXILIARY SEAL API FIG. D-3 PLAN


REVISION VALIDATION

INTERMEDIATE TRANSMISSION COOLING WATER PIPING, API FIG. D-4 PLAN

/ RIGHT ANGLE GEARBOX RATIO CYCLONE SEPARATOR YES NO


DRAWING COMPLETION CERTIFICATE NO.

DIRECTION OF ROTATION: VIEWED FROM ABOVE FLOW ORIFICE IN SEAL FLUSH SUPPLY LINE YES NO

/ CW / CCW SEAL LEAKAGE PIPING WITH ORIFICE YES NO

BUFFER LIQUID SYSTEM YES NO

METHANOL DRIP SYSTEM YES NO


D

/ REQUIRED: PRESSURE PSIG; FLOW US GPM

/ CARTRIDGE DESIGN YES NO


THIS REVISION NO.

DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ITEM N0. D42-G-3504A/B DAT 4


SERVICE:SW DRAINS DRUM SLOP OIL PUMPS D42 G 1E-ME0084 OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA 11
EKRD/2748-2-1110.XLS
Saudi Aramco 2748-ENG (11/2010)

THIS REVISION IS NOT TO BE USED


SAUDI ARABIAN OIL COMPANY

FOR CONSTRUCTION UNTIL

REV
CERTIFIED AND DATED
CENTRIFUGAL PUMP DATA SHEET FOR VERTICAL LINE SHAFT PUMPS
PUMP CONSTRUCTION DATA (CONT'D) PUMP CONSTRUCTION DATA (CONT'D)

STUFFING BOX DATA MATERIALS OF CONSTRUCTION (NOTE 16)


REVISION DESCRIPTION

ISSUED FOR DESIGN

/ STUFFING BOX / INTERNAL / EXTERNAL

MATERIALS TO BE IN ACC. WITH CODE VSI (NOTE 44)

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
INSIDE DIAMETER IN OF STD. DRAWING AC-036821

DEPTH IN VENDOR TO COMPLETE FOLLOWING MAT'L LISTING

DISTANCE FACE OF STUFFING BOX IN

FLANGE TO NEAREST OBSTRUCTION / 1 BOWLS ASTM

2 IMPELLER(S) ASTM
BI-10-20857
24/04/2023
DATE

3 WEAR RING BOWL ASTM


JOB ORDER/EWO NO.

IMPELLER DATA 4 WEAR RING IMPELLER ASTM

/ CLOSED / SEMI ENCLOSED 5 BEARING, BOWL ASSEMBLY ASTM

/ KEY FITTED / COLLET FITTED / OPEN 6 SHAFT, BOWL ASSEMBLY ASTM


REV. NO.

7 LINE SHAFT (OIL LUBRICATED) ASTM


D

FIRST FOLLOW
/ STAGE STAGES LINE SHAFT (SELF LUBRICATED) ASTM
NUMBER OF STAGES
/ ACTUAL DIAMETER IN 8 BEARINGS, LINE SHAFT ASTM

MAXIMUM DIAMETER IN 9 SHAFT SLEEVE ASTM


BY/DATE
OTHER

MINIMUM DIAMETER IN 10 RISER COLUMN & SHAFT ENCL. TUBE ASTM

SINGLE / DOUBLE SUCTION 11 NOZZLE HEAD ASTM

TOTAL EYE AREA IMPELLER IN2 MOTOR SUPPORT & MOUNTING FLANGE ASTM

VANE ANGLE AT IMP. EXIT O


12 SUCTION BARREL ASTM

NUMBER OF VANES 13 SUCTION STRAINER ASTM


OPERATIONS/DATE

ACTUAL PERIPHERAL SPEED ft / sec 14 GLAND / MECH. SEAL FLANGE ASTM

PATTERN NUMBER 15 LANTERN RING ASTM


REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

PRECISION CAST YES - NO 16 SEAL & VENT PIPING / FITTINGS ASTM

CUT WATER DIAMETER IN 17 BOLTING MATL. STUDS / BOLTS ASTM

SPECIFIC SPEED NUTS ASTM

SUCTION SPECIFIC SPEED AT 3% DH (NOTE 35) 18 MECH. SEAL SPRINGS ASTM D


CONST. AGENCY/DATE

WIDTH IMPELLER DISCH. IN 19 MECH. SEAL OTHER METAL PARTS ASTM D

WEAR RINGS:

IMPELLER YES NO CASE YES NO NOISE SPECIFICATION (Note 7)


CLEARANCES INBOARD IN

CLEARANCES OUTBOARD IN
MAXIMUM ALLOWABLE SOUND LEVEL

BY PURCHASER AT 1 m DISTANCE 85 dBA


CERTIFIED/DATE

LINE SHAFT BEARINGS AND LUBRICATION MANUFACTURER GUARANTEED MAXIMUM


DESIGN CERTIFICATION

PUMP dBA
(DESIGN AGENCY)

GUIDE BEARING SPAN FT DRIVER dBA

OPEN LINE SHAFT BEARINGS, LUBR'D BY MED. PUMPED COMPLETE TRAIN dBA

ENCLOSED LINE SHAFT BEARINGS

LUBR'D BY WATER (EXT. SUPPLY) OIL (EXT. SUPPLY)


ENGG./DATE

OIL RESERVOIR CONTENT USG

MIN. L.O. SUPPLY USG / WEEK

INDIVIDUAL BEARING L.O. SUPPLY YES NO

LUBRICANTS
LINE SHAFT BEARINGS
LIQUID PUMPED WATER
IS COVERED, FOR ALL APPROVAL

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

OIL PER 26-SAMSS-45 GREASE PER 26-SAMSS-54


MOTOR BEARINGS
OIL PER 26-SAMSS-45 GREASE PER 26-SAMSS-54
REVISION VALIDATION

COUPLING
DRAWING COMPLETION CERTIFICATE NO.

RIGID ADJUSTABLE SPACER TYPE


SPACER LENGTH IN
HOLLOW SHAFT DRIVER
D THIS REVISION NO.

DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ITEM N0. D42-G-3504A/B DAT 5


SERVICE:SW DRAINS DRUM SLOP OIL PUMPS D42 G 1E-ME0084 OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA 11
EKRD/2748-3-1110.XLS
Saudi Aramco 2748-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

THIS REVISION IS NOT TO BE USED FOR

REV
CONSTRUCTION UNTIL CERTIFIED AND
CENTRIFUGAL PUMP DATA SHEET FOR VERTICAL LINE SHAFT PUMPS
UTILITIES (Note 34) DRAWINGS

ELECTRIC POWER AVAILABLE MANUF'S

DATED
AC VOLTS PHASE DRAWING REQUIRED
REVISION DESCRIPTION

DC Hz NUMBER YES NO
ISSUED FOR DESIGN

MAIN ELECTRIC DRIVER AC 460 3/60. DIMENSIONAL DRAWING OF

CONTROLS AND PROTECTION COMPLETELY ASSEMBLED UNIT

OPER. & MAINT. INSTRUCTIONS

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
CROSS SECT. DRAWING WITH PART NO'S.

AIR AVAILABLE MECHANICAL SEAL DRAWING

PSIG BILLS OF MATERIALS


24/04/2023
DATE

CONTROLS AND PROTECTION COMPL'D PUMP DATA SHEET


BI-10-20857

AUXILIARY PIPING DRAWING


JOB ORDER/EWO NO.

CERT'D TEST CURVE & DATA

AVAIL. COOLING PRESS. INLET OUTLET RECOMMENDED SPARES LIST


REV. NO

O O
WATER AVAIL. PSIG F F INSTR. WIRING DIAGRAM
D

REQ'D. SPEED TORQUE CURVE

WELL WATER TREATED WATER SEA WATER COLD ALIGNMENT CURVE IF REQ
ONCE THROUGH SYSTEM CLOSED LOOP SYSTEM DATA L. & T. VIBR. ANALYSIS IF REQ
BY/DATE
OTHER

INSTRUMENTATION & CONTROLS (NOTE 31,36) MISCELLANEOUS


SHAFT SEAL LEAKAGE CONTROL: YES NO

ELECTRICAL PNEUMATIC BUYER'S PAINT SPECIFICATION SAES-H-001,SAES-H-101


OPERATIONS/DATE

PRES. SWITCH MAKE MODEL VENDOR'S STANDARD:

PRESSURE SETTING "SHUTDOWN" PSIG

LEVEL SWITCH MAKE MODEL SPECIFICATION


REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

TIME DELAY SETTING CONTR. ORIFICE IN

PUMPS TO BE IN ACCORDANCE WITH: (NOTE 26)

INSPECTION AND TESTS (NOTE 13,37,40) 31-SAMSS-004 D

MANUFACTURER'S STANDARD
CONST. AGENCY/DATE

VENDOR'S STANDARD SHOP TEST

AS FOLLOWS
OBSER'D

CERT'D
WITN'D

NONE

HYDROSTATIC TEST

WATER KEROSENE

RUNNING TEST

PERFORMANCE TEST

MEASURE DP ACROSS STUFFING BOX


CERTIFIED/DATE

NPSH TEST

DISMANTLING
DESIGN CERTIFICATION

RADIOGRAPHIC INSPECTION IMPELLER


(DESIGN AGENCY)

DYE PENETRANT EXAMINATION IMPELLER

DYNAMIC BALANCE IMPELLER(S)

DYNAMIC BALANCE ROTOR

DYNAMIC BALANCE COUPLING


ENGG./DATE

VIBRATION MEASUREMENTS

TESTS TO BE CARRIED WITH:

ACTUAL DRIVER MANUFACTURER'S DRIVER

AT: RATED SPEED DERATED SPEED: RPM

MASSES
IS COVERED, FOR ALL APPROVAL

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

MASS OF PUMP LBS

MASS OF PUMP ROTATING ASSEMBLY LBS

MASS OF BARREL LBS


REVISION VALIDATION

DRAWING COMPLETION CERTIFICATE NO.

MASS OF COUPLING LBS

MASS OF DRIVER ROTATING ASSEMBLY LBS

MASS OF PUMP / DRIVER BASEPLATE LBS

TOTAL MASS. Pump, Driver, Coupling, Barrel, Base LBS


D THIS REVISION NO

DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.

ITEM N0. D42-G-3504A/B DAT 6


SERVICE:SW DRAINS DRUM SLOP OIL PUMPS D42 G 1E-ME0084 OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA 11
EKRD/2748-4-1110.XLS
Saudi Aramco 2616-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

REV
UNTIL CERTIFIED AND DATED
THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
NOTES

ISSUED FOR DESIGN


1. TWO PUMPS ARE PROVIDED PER TRAIN. PUMPS SHALL BE VERTICAL PUMP MOUNTED ON VESSEL NOZZLE. D
PUMP IS OPERATED AUTO MODE I.E. PUMP SHALL START AT HLL AND STOP AT LLL IN DRAIN DRUM D42-D-4503
REVISION DESCRIPTION

DESIGN REQUIREMENT STATED IS FOR ONE TRAIN.


2. SLOP OIL MAY CONTAIN SOUR WATER WHICH CONTAINS UP TO 5182 PPMW OF H2S.
3. MAXIMUM FLOW TEMPERATURE UP TO 230°F
PUMP DESIGN TEMPERATURE IS 230°F, MDMT IS 32°F. VENDOR TO CONFIRM

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
4. DELETED D

5. DELETED D
24/04/2023

6. NOT USED
DATE

7. PUMP / MOTOR SET SHALL NOT EXCEED 85 dB(A) AT A DISTANCE OF 3.28 Ft. D
BI-10-20857
JOB ORDER/EWO NO.

8. MOTOR SHALL BE SIZED FOR END OF CURVE (AT FLOW EQUAL TO OR GREATER THAN 120% OF RATED FLOW) WITH S.G. = 1
AND SELECTED RATING SHALL NOT LESS THAN 125% OF RATED POWER
9. MECHANICAL SEAL SHALL COMPLY WITH 31-SAMSS-012 AND API 682 3RD EDITION
REV. NO.

10. NOT USED


D

11. NOT USED


12. NOT USED
13.MINIMUM SUBMERGENCE TEST & NPSHR TEST SHALL BE CARRIED OUT. D
14 TOTAL DIFFERENTIAL PRESSURE REQUIRED AT PUMP DISCHARGE NOZZLE IS 131.46 FT AND TOTAL DIFF. PRESSURE FOR DIFF.
BY/DATE
OTHER

HEAD DEVELOPED BY PUMP (BY SUPPLIER) AT BOWL ASSEMBLY INLET IS 136.9 FT


15. HAZARDOUS AREA CLASSIFICATION: ZONE 2, IIB, T3
16. MATERIALS OF CONSTRUCTION SHALL BE COMPLIANT WITH NACE-0175 & SAUDI ARAMCO STANDARD DRAWING NO. AD-036821
17. PUMP CASING SHALL BE DESIGNED FOR FULL VACUUM IN STATIONARY CONDITION
OPERATIONS/DATE

18. NOT USED


19. NOT USED
20. NOT USED
REVIEW FOR KEY DRAWINGS

21. DELETED
REQUIRED (SAUDI ARAMCO)

22.DELETED
CONST. AGENCY/DATE

23. DELETED
24. DELETED
25. NPSHA VALUE IS CORRECTED AT PUMP CL EQUAL TO 7.21 FT (CONSIDERING PUMP CENTRELINE AT 1.65 FT (BY SUPPLIER)
BELOW VESSEL BOTTOM TANGENT LINE).
26 . NOT USED
27. DELETED

28. SUPPLIER TO PROVIDE A START-UP SPARE CARTRIDGE SEAL UNIT COMMON TO THE SET OF PUMP
CERTIFIED/DATE

29. SUPPLIER SHALL APPLY VISCOSITY CORRECTION FACTOR ON THE PUMP HEAD, CAPACITY AND EFFICIENCY AS PER HYDRAULIC
INSTITUTE STANDARD HI 9.6.7 WHILE DESIGNING THE PUMP. VISCOSITY @ 46 °F IS 27.31 cP
DESIGN CERTIFICATION

30. PUMP TYPE: VS1, VERTICALLY SUSPENDED DIFFUSER TYPE PUMP


(DESIGN AGENCY)

31. FOR ANY INSTRUMENTS / PROBES ON SEAL SYSTEM AND AUXILIARIES, SUPPLIER SHALL SUPPLY AND INSTALL INSTRUMENTS WITH
REQUIRED INSTALLATION HARDWARE, IMPULSE TUBES AND FITTINGS, CABLING, JUNCTION BOX, ETC.
32. CENTRIFUGAL PUMP SHUT OFF HEAD SHALL NOT EXCEED 125% OF SPECIFIED DIFFERENTIAL HEAD INCLUSIVE OF 0%
SHUT OFF HEAD TOLERANCE AND ESTIMATED PUMP SHUTOFF PRESSURE SHALL BE LIMITED TO 101.6 PSIA
33.DELETED
ENGG./DATE

34. FOR SITE DATA & UTILITIES REFER TO BEDD 1E-EM0001-001 Rev A
35. DELETED

36. EACH PUMP AND MOTOR SHALL BE PROVIDED WITH A SEISMIC TRANSDUCER CONNECTION (DRILLED AND TAPPED
3/8"-24 TPI X3/8" DEEP) ONLY IN X,Y DIRECTION ON EACH BEARING HOUSING AS PER 31-SAMSS-004 SEC 7.4.2
37. THE PUMP SHALL BE TESTED IN ACCORDANCE WITH 175-310600 AND MOTOR IN ACCORDANCE WITH 175-170200.
38. NOT USED
39. DELETED
IS COVERED, FOR ALL APPROVAL

40. SOUR WATER DRAIN DRUM (D42-G-1503) DIAMETER IS 8.5 FT (2591 MM) WITH A 1.51 FT (700 MM) DEEP BOOT
FOR THE PUMP (PRELIMINARY DATA).
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

41. DELETED
REVISION VALIDATION

42. NOT USED


43.DELETED
44. MATERIAL GRADE "VSI" EXCEPT MATERIAL OF CONSTRUCTION OF CASING, IMPELLER WEAR RINGS AND CASING WEAR RINGS
45. EQUIPMENT CLASS IDENTIFICATION : "C"
DRAWING COMPLETION CERTIFICATE NO.

46. MOUNTING PLATE SHALL BE PARALLEL TO TRUE HORIZONTAL CENTRLINE OF VESSEL WITH 0 mm TOLERANCE OR SHALL SPECIFY
ACCEPTABLE LEVEL OF TOLERANCE AT MOUNTING PLATE.
47. VENDOR SHALL RETURN THE EQUIPMENT NOISE DATA SHEETS ADEQUATELY FILLED IN
48. PUMP SHALL ALSO COMPLY TO THE REQUIREMENTS SPECIFIED IN SAES-G-005.
D

49. P&ID REFERENCE: D42-A-1A-PRO153-015 D


THIS REVISION NO.

DATA SHEET FOR SW DRAINS DRUM SLOP OIL PUMPS DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO REV.NO.

ITEMS NO. : D42-G-3504A/B DAT 7


SERVICE SW DRAINS DRUM SLOP OIL PUMPS D42 G 1E-ME0084 OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA 11
EKRD/2616-1110.XLS
REVISION VALIDATION DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS REV. NO. DATE REVISION DESCRIPTION
OTHER
THIS REVISION NO. D IS COVERED, FOR ALL APPROVAL (DESIGN AGENCY) REQUIRED (SAUDI ARAMCO)
D 24/04/2023 ISSUED FOR DESIGN
AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER ENGG./DATE CERTIFIED/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

DRAWING COMPLETION CERTIFICATE NO. JOB ORDER/EWO NO. THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION
BI-10-20857 UNTIL CERTIFIED AND DATED
Saudi Aramco 2616-ENG (11/2010)

OIL PUMPS
ITEMS NO. D42-G-3504A/B

OFFSHORE GAS INCREMENT PROGRAM


SERVICE : SW DRAINS DRUM SLOP OIL PUMPS
MECHANICAL DATA SHEET FOR 'SW DRAINS DRUM SLOP

DAT

SAUDI ARABIA
DWG. TYPE

D42
2010 mm

PLANT NO.

G
INDEX
SAUDI ARABIAN OIL COMPANY

Sour Water Drain Drum Outline Drawing (D42-D-4503) (Preliminary)

DRAWING NO.

1E-ME0084
8

11
OF
SHT.NO
24", 150# RF
PUMP NOZZLES

D
REV.NO.

EKRD/2616-1110.XLS
REV
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
JOB NO. BI-10-20857 ITEM NO. D42-GM-3504 A/B

APPD.

RP

SD

SD

SD
SAUDI ARAMCO PURCHASE ORDER NO.

SPECIFICATION NO.

Severe Duty Totally Enclosed Squirrel Cage Induction REVISION NO. D DATE 24/04/2023
CERT.

Motors Smart Datasheet PAGE 9 11 BY TY

17-SAMSS-503 PLANT NO D42 INDEX G DRAWING NO 1E-ME0084


SSSSB/DE/
SSSSB/SV/

SSSSB/SV/
SSSSB/DE

1 APPLICABLE TO: PROPOSAL PURCHASE AS-BUILT


DE/RP

DE/RP
CHKD.

RP
2 FOR OFFSHORE GAS INCREMENT PROGRAM UNIT D42
3 SITE Fadhili Saudi Arabia SERIAL NO.
4 SERVICE SW DRAINS DRUM SLOP OIL PUMPS NO. REQUIRED 2
5 DRIVEN EQUIPMENT TYPE: COMPRESSOR GENERATOR OTHER PUMP
6 NOTE: INFORMATION TO BE COMPLETED BY: PURCHASER MANUFACTURER
7
8 Purchaser's Data to Be Supplied With Inquiry:
ISSUED FOR INTER DISCIPLINE CHECK

9 BASIC DATA:
ISSUED FOR CLIENT REVIEW

10 Volts: 460 Phase: 3 Hertz : 60 Nameplate: kW HP


ISSUED FOR DESIGN

ISSUED FOR DESIGN

11 Full Load RPM: Speed Range for Variable Speed Drive


DESCRIPTION

12 Rotation When Facing Motor Opposite Drive End: Clockwise Counter-Clockwise Bi-Directional
13 Motor Thrust Loads: None Other (specify) Type Load: Direct Coupled Belt Driven Other
14 NEMA Torque Design "B" (normal) Other (specify)
15 SITE DATA:
16 Site average temperature: (NOTE 34) °C

17 Area Classification: Non-Hazardous


18 Hazardous (Note 15) (Classified) Class: Group: Div

19 Ignition Temperature: Elevation (Specify if Above 1000 m.): m


20 STARTING:

21 Full Voltage Reduced Voltage % Type Adjustable Frequency Drive Unit Type
22 AFD Details Attached (If motor purchased separately from drive unit.)
BI-10-20857

BI-10-20857

BI-10-20857

BI-10-20857
JO/EWO

23 MOUNTING:

24 Horizontal Vertical Shaft Up Vertical Shaft Down Foot Mounted Flange Mounted, NEMA Type
25 ENCLOSURE:
MBT

MBT

MBT
BY

TY

26 TEFC TENV Explosion Proof Other


27 Main Terminal Box Conduit Hub Size: in
11/10/2022

25/11/2022

17/01/2023

24/04/2023
DATE

28 Space Heaters:
29 Space Heater Required for motors rated less than 75kW (100HP)
30 Heater Leads: Main Terminal Box Separate Heater Terminal Box
REV NO.

D
A

31
32 Note :
#SPILL! 33 (1) NOT USED
34 (2) Unless and otherwise specified Motor shall be suitable for S1 duty.
DRAWN 35 (3) Coating and painting shall be suitable for severely corrosive environment.
BY 36 (4) Motor colour shade shall be Green colour (RAL 6021)
DATE 37 (5) The maximum relative humidity to be considered for design shall be 100%
CHKD BY 38 (6) Seismic conditions (site class shall be "C" as per ASCE 7-2005)
OPRG. DEPT. 39 (7) The starting time curve to be proivded for 100% and 80% voltage alongwith Torque speed curve
BY 40 (8) Motors shall be suitable to start with 80% of rated voltage at the motor terminals
DATE 41 (9) The ingress protection for Motor and Terminal box shall be IP55
42 (10) Motors for use in Zone 2 hazardous (classified) locations shall be of the Totally Enclosed type, per NEMA, or Ex-n, per IEC,
ENG. DEPT. 43 as a minimum
BY 44 (11) Motors for use in Zone 1 hazardous locations shall be flameproof motors EEx d.
DATE 45
APPD. FOR 46
CONSTR. 47
BY 48
DATE 49
50
CERTIFIED 51
BY 52
DATE 53
APPD.
JOB NO. BI-10-20857 ITEM NO. D42-GM-3504 A/B

RP

SD

SD

SD
SAUDI ARAMCO
PAGE 10 OF 11 BY TY
Severe Duty Totally Enclosed Squirrel Cage Induction PLANT NO D42 INDEX G DRAWING NO 1E-ME0084
CERT.

Motors Smart Datasheet SITE Fadhili Saudi Arabia


17-SAMSS-503 SERVICE SW DRAINS DRUM SLOP OIL PUMPS
SSSSB/DE/ Vendor Data:
SSSSB/SV/

SSSSB/SV/
SSSSB/DE

1
CHKD.

DE/RP

DE/RP

RP
2 MANUFACTURER MODEL DRIVEN EQ. ITEM NO. D42-G-4207 A/B

3 MOTOR DATA

4 Rating Data at 1.0 Service Factor:

5 Nameplate Power kW (HP) Voltage 460 Phase 3 Hertz 60

6 Full Load Speed RPM Enclosure Type Frame Size

7 Rotation When Facing Motor Opposite Drive End: Clockwise Counter-Clockwise Bi-Directional

8 Torque:
ISSUED FOR INTER DISCIPLINE CHECK

Speed-Torque Curve No Speed-Current Curve No


ISSUED FOR CLIENT REVIEW

9
ISSUED FOR DESIGN

ISSUED FOR DESIGN

10 Design Data at 1.0 Service Factor and Rated Voltage:


DESCRIPTION

11 No Load Current Amps

12 Load 25% 50% 75% Full

13 Amperes

14 Power Factor

15 Nominal Efficiency

16 Guaranteed Efficiency

17

18 Locked Rotor Amps at Rated Voltage:

19 Insulation System:

20 Class Temperature Rise °C above ambient at 1.0 SF

21 Bearing Information:

22 Coupling End Bearing:


BI-10-20857

BI-10-20857

BI-10-20857

BI-10-20857

Manufacturer's Type Part No


JO/EWO

23 Outboard End Bearing: Manufacturer's Type Part No

24 Certification: Class Group Zone Agency

25 Weights/Dimensions:
MBT

MBT

MBT
BY

TY

26 Net Weight: kg Rotor Weight kg


17/01/2023

24/04/2023

27 Shaft Data
10/11/2022

25/11/2022
DATE

28 Shaft extension (load end) (in/cm)

29 Space Heaters: (Operating Conditions)

30 Wattage kW Max. Surface Temp °C


REV NO.

D
A

31

32
REVISIONS 33

DRAWN 34

BY 35

DATE 36

CHKD BY 37
OPRG. DEPT. 38

BY 39

DATE 40
ENG. DEPT. 41

BY 42

DATE 43

44
APPD. FOR 45
CONSTR. 46

BY 47

DATE 48
CERTIFIED 49

BY 50

DATE 51
Saudi Aramco 7305-ENG (11/2010)

SAUDI ARABIAN OIL COMPANY

UNTIL CERTIFIED AND DATED


THIS REVISION IS NOT TO BE
USED FOR CONSTRUCTION

REV
ISSUED FOR DESIGN EQUIPMENT NOISE DATA SHEET
REVISION DESCRIPTION

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
GENERAL INFORMATION

Project Designation: OFFSHORE GAS INCREMENT PROGRAM Inquiry/Purchase Order No.:


Location: FADHILI SAUDI ARABIA Manufacturer:
Equipment Type: SW DRAINS DRUM SLOP OIL PUMPS Model No.:
Equipment Serial No.:
24/04/2023
DATE

BI-10-20857
JOB ORDER/EWO NO.

PURCHASER'S REQUIREMENTS
REV. NO.

This form shall be completed for each piece of equipment (or integrated unit) that is likely to generate noise in excess of 85 dBA at a
D

distance of one meter. If the noise level is greater than 90 dBA, the cost of special design and/or acoustic treatment should be
supplied. Measurements are to be made in accordance with ANSI S1.13 and at full design load, unless otherwise indicated. For
rotating electric machinery, use points defined in IEEE Standard 85.
BY/DATE
OTHER

OPERATIONS/DATE

Also measure at: 50% load 120% load Other load


REVIEW FOR KEY DRAWINGS
REQUIRED (SAUDI ARAMCO)

SUPPLIER, MANUFACTURER OR VENDOR INFORMATION


Sound Pressure Level, dBA

Standard Design: (NOTE 7, 47) Special Design: With Acoustic Treatment:


CONST. AGENCY/DATE

Octave Band Sound Pressure Levels, dBA (Ref. 0.02 mPA)


(Supplier's Guaranteed Maximum Sound Pressure Level at One Meter)

Center Frequency Standard Special With Acoustic


Octave Band
(Hz) Design Design Treatment
(Hz)
CERTIFIED/DATE
DESIGN CERTIFICATION

20 - 75 63
(DESIGN AGENCY)

75 - 150 125
150 - 300 250
300 - 600 500
ENGG./DATE

600 - 1200 1000


1200 - 2400 2000
2400 - 4800 4000
4800 - 9600 8000
IS COVERED, FOR ALL APPROVAL

AND CERTIFICATION REQUIREMENTS, PER SAEP-334, UNDER

Description of Special Design: Added Cost:

Description of Acoustic Treatment: Added Cost:


REVISION VALIDATION

DRAWING COMPLETION CERTIFICATE NO.

Supplier, Manufacturer or Vendor:


Represented by: Title:
Signature: Date:
D
THIS REVISION NO.

MECHANICAL DATA SHEET FOR SW DRAINS DRUM SLOP OIL


DWG. TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
PUMPS
ITEM N0. D42-G-3504A/B DAT 11
SERVICE: SW DRAINS DRUM SLOP OIL PUMPS D42 G 1E-ME0084 OF D
OFFSHORE GAS INCREMENT PROGRAM SAUDI ARABIA 11
EKRD/7305-1110.XLS