LAPORAN KESELAMATAN DAN KESIHATAN
PEKERJAAN
JULY 2020
PROJECT:
PROPOSED 20 LOTS 3 STOREY SHOPLOT (90 UNITS SUBSIDIARY TITLES TO BE APPLIED FOR), 2 LOTS 5
STOREY HOTEL BLOCK F & G AND 1 LOT 12 STOREY HOTEL BLOCK H (WITH SUBDIVIDED LOT TITLES TO BE
APPLIED FOR BLOCK F, G, & H) ON CL. 125346081 AT MILE 1.5, JALAN BUBUL, SEMPORNA. (PHASE 3 –
BLK H : 12 STOREY HOTEL)
PREPARED BY, VERIFIED BY,
MUHD SOFIE BIN PALEMBANG PHILIP MOH
SSS PROJECT MANAGER
JKKP NO:HQ/18/SSS/00/02770
:SB/17/PP/02/00292
TARIKH: 05/08/2020 TARIKH: 05/08/2020
1
1.0 PENGENALAN
NAMA PROJEK: PROPOSED 20 LOTS 3 STOREY SHOPLOT (90 UNITS SUBSIDIARY
TITLES TO BE APPLIED FOR), 2 LOTS 5 STOREY HOTEL BLOCK F
& G AND 1 LOT 12 STOREY HOTEL BLOCK H (WITH SUBDIVIDED
LOT TITLES TO BE APPLIED FOR BLOCK F, G, & H) ON CL.
125346081 AT MILE 1.5, JALAN BUBUL, SEMPORNA. (PHASE 3
– BLK H : 12 STOREY HOTEL) .
PEMILIK: SERTA JADI & TOUR SDN BHD
TB 882, Jalan Abaca 9100 Tawau, Sabah Tel:089 768282
KONTRAKTOR: HYWAY GROUP (MALAYSIA) SDN BHD
Lot 12, Ground Floor, Donggongon AVENUE, Lorong Donggongon
AVENUE A1, Penampang, 89509 Kota Kinabalu Sabah. Tel:088
715811 Fex:088 720699
PERUNDING:
a. ARCHITECT INOTECH DESIGN ARCHITECTS SDN BHD
2nd Floor,Lot 5, Block A, Phase 1, Damai Plaza,88300 Kota Kinabalu,
Sabah. Tel:088 268607 Fax:088 268609
b. CIVIL DAN STRUKTUR KS ENGINEERING CONSULTANT
Lot 8,2nd Floor ,Bunga Raja Shop Office. Jalan Lintas 89350
Inanam,Kota Kinabalu, Sabah. Tel:088 428972 Fax:088 431222
d. ELEKTRIKAL DAN MEKANIKAL NOA CONSULT
1ST Floor,Lot 6,Evergreen Park,Jalan Gunung Bintang, Off Jalan
Penampang,Lama,88300 Kota Kinabalu Sabah. Tel:088 713164
Fex:088 719366
f. JURUUKUR BAHAN SP PERUNDING
Lot 27,2nd Floor, Block B,Towering Koidupan Perdana,89500
Penampang, Sabah Tel:088 719816 Fex:088 720699
NILAI KONTRAK ASAL: RM 41,180,588.00
TARIKH MILIK TAPAK: 16HB DECEMBER 2019
TARIKH SIAP ASAL: 17HB JUNE 2021
NO PENDAFTARAN JKKP: SB/19/03/148942
2
2.0 SKOP KESELAMATAN DAN KESIHATAN PEKERJAAN
Skop KKP mencukupi semua kerja-kerja kejuruteraan dan pembinaan bagi projek ini dan
HYWAY GROUP (MALAYSIA)S/B akan melaksanakan semua aktiviti tersebut berdasarkan
semua undang-undang dan peraturan yang berkaitan dengan Keselamatan dan Kesihatan
Pekerjaan.
3.0 PERUNDANGAN, TATACARA DAN LAIN-LAIN PERATURAN
Perundangan, tatacara dan Peraturan di bawah akan dijadikan rujukan dalam menjalankan
semua aktiviti kerja di tapak:
• Akta Keselamatan dan Kesihatan Pekerjaan 1994 (Akta 514)
• Akta Kilang dan Jentera 1967 (Akta 139)
• Environmental Quality Act 1974
• Fire Service Act 1988 (ACT 341)
• Notification of Accident, Dangerous Occurrence, Occupational Poisoning and Occupational
Disease Regulations 2004 (NADOOPOD)
• Manual keselamatan dan kesihatan
• Peraturan-peraturan/undang-undang yang berkaitan
4.0 OBJEKTIF
Objektif Keselamatan, kesihatan dan alam sekitar HYWAY GROUP adalah:
a. Untuk mencapai sasaran Sifar kemalangan fataliti dan kemalangan yang menyebabkan
kehilangan jam bekerja.
b. Untuk mengurangkan impak negatif ke atas Alam Sekitar
c. Mematuhi semua Perundangan berkaitan
3
5.0 DASAR KESELAMATAN DAN KESIHATAN
4
6.0 PROGRESS OF WORK SAFETY
General Condition Safety
1. Site Office -Completed
2. Temporary Electricity Supplay -Completed
3. Temporary Water Supplay -Completed
4. JKKP Registration -Completed
5. CIDB Levy -Completed
6. Tower Crane PMA -On-Going
7. Insurance-contractor all risk and workman -Completed
8. Project Signboard -Completed
9. Storage Diesal-approval bomba and permit from KPDNKK -On-Going
5
7.0 CARTA ORGANISASI JAWATANKUASA KESELAMATAN DAN KESIHATAN
SAFETY & HEALTH COMMITTEE ORGANISATION CHART
Mr. PHLIP MOH
Project Manager
Mr. Loren Yusop
Safety and Health officer
(SHO)
Employer’s Representative Employee’s Representative
Charles R.M. Marjanan Zhong Xue Ping
Muhd Sofie Samuel Goh Teck Ho
Leonardo Ling Choi Seng Albisil Bin Asmad
Masar Bin Abdul Rakman Al Rashid bin Ahmad
6
8.0 SAFETY & HEALTH STATISTIC & INFORMATION –JULY 2020
HG(M) SDN BHD Sub-contractor
No. Description Total
Cumulative This Cumulative This
Last Month Month Last Month Month
Man hours
1 3,120 1,456 19,760 8,320 32,656
Worked (Direct)
Lost Time
2 0 0 0 0 0
Injuries Incident
Medical
3 0 0 0 0 0
Treatment Case
Restricted
4 0 0 0 0 0
Worker Case
5 First Aid Case 0 0 0 0 0
Property
6 0 0 0 0 0
Damage
7 Near Miss 0 0 0 0 0
8 CIDB Green Card 0 5 0 2 7
HSE Induction
9 0 0 0 0 0
for New Workers
10 Total Manpower 7 40 47
9.0 AKTIVITI KESELAMATAN DAN KESIHATAN
7
Activity site.
1 TOOLBOX-TALK
ToolBox-Talk.
Topik:
1. Prosedur SOP
Covid-19.
2. PPE
3. Penggenalan
safety induction
8
Pembasmian kuman di Tapak bina
Kawasan
1. Bahagian office
2. Kawasan tandas
3. Kawasan bangunan
4. Kawasan kantin
Sekian Terima Kasih.
&
Thank you
9
10