Techscm Presentation
Techscm Presentation
2020 –CONSULTING
End to end Supply chain
consulting solution under
Paragon solutions
Business
Exploit
Processes
Next
Generation
SAP/ERP
SC
Top Enhance Enable
Management
ERP Usages
Quantification
ERP Usages
Quantification and
Understanding Plant
Gap Against BPR and SAP Revamp
Challenges
Benchmarked
Practices
Downtime
• 10-15% reduction • Integrated supply chain planning
Packaging Cost
• 12-15 % reduction • Augmented analytics and AI
Outbound freight
• 5-7% reduction • Intelligent recommendations
Inbound freight
• 8-10% reduction • Automated decision support
Bridging the gap between existing systems
Space
andUtilization
business requirements using
• 5-10% of storage space reduction •Digital execution support of improvement measures
thorough process mapping, synchronizing
different
Delivery operations requirements to
Performance
deliver
• 100 maximum
% On-time value for shareholders
delivery • Check of compliance regulations
Manpower Optimization
• 8-10% reduction
PACKGING- CONSULTING
Cost Savings Cost Containment
Use AI to Predict Faults in Equipment Real time Production Monitoring Identify Build Traceability /history of process
before they happen using Predictive production bottlenecks based on ‘real’ parameters for every Part. Precisely
Maintenance. Increase Plant uptime data from the machines. Take corrective identify reason for failure during part
measures recall and warranty. Optimize the
process parameters.
Corporate Training – SAP Operational Modules Asset Management Tool- Under Development
• Digital Transformation – Logistics consultant and team lead for Procurement and Plant Maintenance at an Oil and Gas storage company implementing a
Craig van der Walt Greenfield's SAP system that is based on a Hana database. This included the development and design of an customer portal for order intake and is
Solutions Architect based on SAP Hana Cloud Platform. This portal was hosted on a customized FIORI Launchpad and covers basic procurement and sales entry
functionality with the intention to increase the FIORI tiles to further functionality as the company matures in its adoption of the mobile platform. This
has provided important experience in the management of the SAP HCP and the user on the system.
INDUSTRY EXPERTISE:
• Automotive manufacturing companies - Various production environments including demand planning and characteristics-based planning on both
• Automotive
standard SAP and APO characteristics-based planning. The work included the development of variant configuration to support a characteristics planning
• FMCG (Cosmetics, model that was not SAP standard.
White products) • Integration of the supply chain along with batch determination for stamping plants. There were a number of implementations at the two leading
• Pharmaceutical Automotive companies as well as development and implementation of the supply chain supporting all tiers of the OEM distribution model.
• Chemical (Paint)
• Beverage • Cosmetics company - Team lead for production planning and data migration. This project included the development of a customized SOP planning
structure that worked with both financial figures as well as SKU volumes for budgeting and actuals. The SOP hierarchy also included numerous product
• Oil and gas
mixes of a common base product with percentage splits into various SKU’s based on characteristics of the product. It also included historical data
• Paper and Pulp updating of percentage splits across a product brand and product hierarchy.
• Mining
• Logistics • Paper and pulp company – Project manager - This project involved the verification of over 50 000 engineering spares and the classification according to
international standards. The project included the implementation of a mobile application that was used for photographing and verifying the engineer
spares.
• Mining company – Team leader - Procurement team leader and involved in the implementation of an interface for tracking and processing of fuel
consumption. Other roles included EAM lead for various mines within South Africa.
• Paint company - Team lead for production planning and Quality management on a template roll out. This included the development of a direct
interface into the production control SCADA system based on a demand plan received from SAP APO. The system was implemented without the need
for redesigning the control system. This project also provided important experience in the interfacing of demand management and production systems
TEAM STRENGTH
Module Strength
PP 2
After Implementation or revamp, we
MM 2
have been engaged in supporting the
WM 3 clients on troubleshooting.
SD 1
ABAPER Part time
SCM Consultants 2
TECHSCM TEAM