COMMENT RESPONSE SHEET
PROJECT: CAP-2 OWNER: South Pacific Viscose
Discipline: Electrical
Document Title: Electrical cable routing and cable tray Layout LYE Storage Area
SPV Document No.: A-CA-2-E-EC-75-003 Revision: 1.0
TPE Document No.: 2924-B200-13C67-DWG-0003
Total Review Duration: 10 Working Days
Responsible / Consolidator: All:
Return Code: B Reviewed with comments
Section/ By
No. Rev. No. OWNER Comments EPCm CONTRACTOR Response OWNER Closed out
Page No. (Initials)
1 0.0 1 SYA Incorporated
Page 1 of 1
F -2
F-1
D -11
KEY PLANT
NOTES
LEGEND
Code Description
A Proceed-No. Comment
B Proceed-With Comment
C Do Not Proceed-Revise & Resubmit
D Cancelled
E Received as Information
Signature
NO DRAWING DESCRIPTION TPE DRAWING NUMBER
REFERENCE DRAWING
REV. No. REVISION DESCRIPTION DATE REVISED BY CHECKD BY APPROVED BY OWNER BY
REVISION
TPE DRAWING NUMBER
PT. TRIPATRA ENGINEERING 2924-A110-13C87-DWG-0003
Drawn by
CON
Project Document type
Reviewed by CS2 ADSORPTION PLANT 2 ELECTRICAL LAYOUT
Approved by (CAP-2) Project number
X-333004-023
Weight
Description
ELECTRICAL CABLE ROUTING
AND CABLE TRAY LAYOUT LYE Scale
STORAGE AREA 1 : 250
www.pt-spv.com
Document status Date of first issue Date of latest issue Plant classification Format Sheet Document ID Rev.
RELEASED 04.09.2021 14.01.2022 99 A1 1/1 A-CA-2-E-EE-45-003 1.0