This document provides operation instructions for a hydraulic plate shearing machine. It includes sections on machine parameters, components, structure, electrical systems, installation, operation, safety and maintenance. The machine can shear plates from 0.5-8mm thick and 2500-4000mm wide using a hydraulic system of pumps, valves and cylinders to power cutting movements. Proper lubrication and adjustment of cutting gaps is described to optimize machine performance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
4K views37 pages

Operation Manual For QC12Y-8X3200

This document provides operation instructions for a hydraulic plate shearing machine. It includes sections on machine parameters, components, structure, electrical systems, installation, operation, safety and maintenance. The machine can shear plates from 0.5-8mm thick and 2500-4000mm wide using a hydraulic system of pumps, valves and cylinders to power cutting movements. Proper lubrication and adjustment of cutting gaps is described to optimize machine performance.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 37

Hydraulic Plate Shearing Machine Operation Instructions

2500
QC12Y—8×3200
4000
Hydraulic Swing Plate Shearing Machine

Operation Instructions

Product Number:

ANHUI ZHONGDE MACHINE TOOL CO. , LTD.


Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page1of
37
Hydraulic Plate Shearing Machine Operation Instructions

Special Notice

Dear Sir or Madam,


You’ve honoured us with purchasing our products. In order to help
you to master this machine, we hereby provide you with this operation
manual. Please be sure to read all the information on it before any
operation. It will be a great help.
We assure you that the information we provide on this operation
manual is correct and reliable. And try your best to avoid human error. If
there are still some faults and uncontrollable omission which we do not
find out before printing, please contact us immediately. At times, part of
the products will be adjusted or modified for improving the performance
and reliablity of the parts of and the whole machine. Hence we hereby
beg you understanding of inconformity with the machine on this manual.
If you find out any mistake on this operation manual by operating,
please contact us immediately. We will appreciate it very much!

Contact Us:
Add: Bowang Special Economic Industry Park, Ma’anshan, Anhui, China
P.C.: 243131
Tel: 86-555-6760699
Fax: 86-555-6760698
E-mail: [email protected]

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page2of


37
Hydraulic Plate Shearing Machine Operation Instructions

Contents

1. Photo of Machine-------------------------------------------------------------------4

2. Basic Parameters of Machine-----------------------------------------------------5

3. Main Usage , Performances and Characteristics of Machine-----------------6

4. Hydraulic Transmission System of Machine---------------------------------6-7

5. Structure of Machine-----------------------------------------------------------8-12

6. Electrical System of Machine------------------------------------------------13-16

7. Hoisting and Installation of Machine----------------------------------------17-19

8. Lubrication of Machine-----------------------------------------------------------17

9. Adjusting and O peration of Machine---------------------------------------20-21

10. Safety Technology and Maintenance of Machine----------------------------21

11. List of Rolling Bearings---------------------------------------------------------22

12. List of Gears----------------------------------------------------------------------22

13. List of Basic Accessories Carried with the Machine------------------------22

14. List of Customer-made Easy-to-wear Parts-----------------------------------23

Attachment: Drawings of Easy-to-wear Parts(seven in total)----------------24-30

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page3of


37
Hydraulic Plate Shearing Machine Operation Instructions

1. Photo of Machine Externals

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page4of


37
Hydraulic Plate Shearing Machine Operation Instructions

2. Basic Parameters of Machine


Serial Name Numerical Value Unit Remarks
No.
1 Maxium thickness of 8 mm
shearable plate
2 Maxium width of 2500 3200 4000 mm
shearable plate
3 Strength of sheared plate 500 Mpa
4 Shearing angle 1°30′
5 Number of strokes 22 17 10 mim-1
6 Distance between 2720 3420 4244 mm
vertical posts
7 Length of cutter blade 2600 3300 4100 mm
8 Height of working table 800 mm
above the ground

Type Y160M-4 B5 type


9 Main motor
Power 11 kw
Rotation 1460 r/min
speed

Type 25MCY14-1B
10 Axial plunger
pump Displacement 25 ml/r
Pressure 31.5 Mpa
Length 3140 3840 4664
Without front
11 External Width 1540 1660 1880 mm support
Dimensions material
Hight 1570 1620 1720

12 Weight of Machine 5200 6800 9200 kg

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page5of


37
Hydraulic Plate Shearing Machine Operation Instructions

3. Main Usage , Performance and Characteristics


The machine is used for shearing the plates with a thickness of 0.5-8mm
and width of 2500mm , 3200mm or 4000mm.
The standard strength of the sheared plate is 500N/mm2. If plates with other
strength need to be sheared their thickness should be reduced accordingly.
The machine adopts steel plate-welded structure , hydraulic transmission
and nitrogen return strode cylinder , ensuring a stable and reliable operation . It
is compact , light and regid .
The cutter edge gap can be adjusted rapidly and cvnveniently as the
machine has front and back plate bafflers . The front baffler is measured by
scale and positioned by dog while the back plate baffler is drived mechanically
and can be fine-tuned manually , with values displayed on revolution counter .
The stroke of the upper cutter seat can be stepless adjusted to raise the
efficiency of short plate shearing . The machine is equipped with protection
fence to ensure the safety of operation .

4. Hydraulic Transmission System of Machine


The hydraulic system of machine ( see Fig 1. ) mainly consists of
25MCY14-1B axial plunger pump 2 , electromagnetic overflow valve 5 etc.
The system-required pressure is supplied by axial plunger pump 2 , with
the maxium work pressure beiong 18 Mpa . The return stroke of the upper
cutter seat is accomplished by nitrogen return-stroke cylinder 12 whoes gas
filling pressure is 4.5Mpa。Special attention: Only nitrogen is allowed to be
filled into the return-stroke cylinder . Oxygen filling is strictly prohibited .
The working principle of the hychranlic system is : the oil is pumped by
the oil pump into the material pressing cylinder 8 and electromagnetic overflow
valve 5 through the pipe . When the electromagnetic valve is set at normally
open position (disenergizde) , the whole system is unloaded and the machine
has no any operation . When the valve is energizde , set at normally close
position , the oil enters the overflow control state . As at the set value of
pressure , the overflow valve is closed , the pressure is gradually going-up in
the oil circuit .The plate pressing cylinder first overcomes the spring’s pulling
force and presses down . The working oil cylinder overcomes the supporting
force and begins the down stroke . When the upper cutter seat goes to the down
limit , the stroke switch is made to act . The overflow valve is restored to
disenergizde position , the whole oil circiuit is unloaded , the upper cutter seat
is set on its return stroke under the action of the return-stroke cylinder and the
material pressing cylinder is reset under the action of spring force.

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page6of


37
Hydraulic Plate Shearing Machine Operation Instructions

List of Hydraulic Components

Fig. 1 Hydraulic Schematic Diagram


Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page7of
37
Hydraulic Plate Shearing Machine Operation Instructions

5. Structure of Machine
1 Framework:
The steel plate-welded frame structure is very rigid . Two cylinders are
fived on the left and right vertical posts . There is an auxiliary cutter slide on the
working table , facilitating the fine tuning of the lower cutter seat . There is also
plate feeding balls on the table which are light and easty to operate .

2 Upper Cutter Slide : it is a steel-plate welded structure with good


rigidity . With the eccentric sleeve(8) as the point of support and driven by the
left and right cylinders and nitrogen return-stroke cylinder , it swings
reciprocally to complete the shearing .

The vertical bearing face of the blade in the upper cutter seat is proccssed
into a curved shape to ensure the consistence of the gap between the upper and
lower blades in the process of shearing .
3 Plate Pressing device : it consists of 10 ~ 15 material-pressing oil
cylinders (see Fig. 4) installed on the front supporting board of the framework .
When the oil is filled into the material-pressing oil cylinders , the pressing
heads will overcome the force of the pulling spring (18) and move downward to
press the plate to be sheared . After the shearing , they will reset by means of
the pulling springs .
The pressing force will increase with the increase of the thickness of the
sheared plate .
4 Front and back bafflers :
Front plate baffler : it is set on the working table and its value is indicated
by scale . It reaches the required value by adjusting the movable dog . It will be
more convenient to use the front baffler in shearing thin steel plates .
Back plate baffler (see Fig.6) :It is installed on and moves up and down
with the upper cutter slide . Its adjusting is realized by 0.55 KW motor’s
driving , gear reducing and leading screw transmission . Pressing the adjusting
button “十” (or“一” )can realize the backward (foreward) adjustment of the
plate baffler . When the required value cann’tbe reached by mechanical
adjustment . Manualadjustment by turning manual adjusting wheel (41) can be
used . Therefore , the adjustment of back baffler is bots convenient and
reliable .
The adjustment range of the back baffler is 20-600mm . When the length
of the sheared plate is larger than the maximal baffling distance of the back
baffler , move the baffler (29) to the last position and raise it by bearing (36)
and the inclined surface of supporter (33) . Then the plate with any length can
be sheared .
Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page8of
37
Hydraulic Plate Shearing Machine Operation Instructions

Fig. 2 Adjusting Structure for Gap Between the Cutter Slide and Blade Edge

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page9of


37
Hydraulic Plate Shearing Machine Operation Instructions

Fig. 3 Oil Cylinder and Return-stroke Cylinder

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page10of


37
Hydraulic Plate Shearing Machine Operation Instructions

Fig. 4 Plate-pressing oil Cylinder

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page11of


37
Hydraulic Plate Shearing Machine Operation Instructions

Fig.5 Back gauge

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page12of


37
Hydraulic Plate Shearing Machine Operation Instructions

6. Electrical System of Machine


The machine uses 50HZ , 380Vthree-phase four-wire system of power
supply , with 380V three-phase for the machine moter , 220V single-phase for
line lights and 380V two-phase for control transformer . The output of the
control transformer is for use of control circuit , of which 24V is for control of
back plate baffler , 29V , after rectification , for electromagnetic commutating
valve and count relay , 6V for indicators and 220V for other control
components .
The electrical cabinet is at the left side of the machine , which contains the
mechanical interlocking mechanism and control the power supply of the
machine . All the operational components except the foot switch SA4 are
concentrated on the push-button station in the front of the machine , with the
function of each camponent marked by the above fignaral symbol .
The operational sequence of the machine is as follows:
Open the mechanical interlocking in the electrical cabinet by key . Turn its
handle to “close” position , the power source of the machine is swithed on .
Then , Open the key button SA1( )to switch on the control circuit . The
indicator light HL2( )lights , showing power-on .
Press push-button swith SB3 or SB4( ) to increase or decrease
the open distance of the back plate baffler to the required size . The size of the
open distance of the back baffler is displayed on the counter at the left lower
part of the push-button station . At the maxium and minium sizes , there are
stroke switches (SQ4 , SQ5)to limit the maxium open distance to be 600mm
and the minium to be 20mm .
Press push-button switch SB2( ) to start the motor of oil pump . The
swith SB2 has indicator light itself to indicate wether the motor works .
Turn the rotary switch SA3( ) to select shearing modes . When SA3
( ) is turned to position , “one stroke” mode is selected , and SA3( ) to
position ,“continuous stroke”is selected . When SA3 is at one-stroke position ,
step-on the foot switch SA4 , the upper cutter seat will shear downward .
Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page13of
37
Hydraulic Plate Shearing Machine Operation Instructions

Release SA4 , the upper cutter seat will stop move downward and return
immediately to the upper dead point . Step-on SA4 again for another shearing .
It should be noted that the foot switch SA4 cann’t be released if the plate is not
fully sheared for fear of the wrong shearing of the plate . When SA3 is at the
position of continuous stroke , Make a step-on on the foot switch SA4 ( the
step-on time cann’t be too long . Otherwise it will become one shearing), the
machine will make continuous shearing . Make another step-on SA4 , the
continuous shearing will stop .
The machine has also shearing length adjusting device , shearing times
number counting device , Turn potentiometer RP ( ) to adjust the
shearing length .
Turn the rotary switch SA5( ) to position“1”to count the
shearing times number . At position “0”, no counting is made . The number of
shearing times can be set by the counter relay . Press the reset push-button of
the relay , push open the digital window , turn the digital wheels of vovrious
places to required value and then close the digital window , completing the
setting . When the number shearing times reaches the set value , the machine
will stop . Only by pressing the reset push-button , can the machine shears
according the original set value . Counted shearing can be made when the
machine works in “one stroke” or “continuous stroke” mode . However , it
should be noted that when the machine is in “continuous stroke” mode , press
the reset button will make the machine to shear according to the original set
value (without stepping-on the foot swtich) . Therefore , if no need for shearing ,
SA4 should be turn to the position of “one stroke” before resetting .
Turn the rotary switch SA2( ) to switch on the fluoresent light for
moving the plate for shearing .
Don’t forget to lock SA1 key switch SA1 key switch and the interlocking
mechanism of electrical cabinet , before leaving the machine .
The machine should be reliably earthed .

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page14of


37
Hydraulic Plate Shearing Machine Operation Instructions

2
2

2
2
2

2
2

PE
2

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page15of


37
Hydraulic Plate Shearing Machine Operation Instructions

Fig.6

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page16of


37
Hydraulic Plate Shearing Machine Operation Instructions

7. Hoisting and Installation of Machine


1. The hoisting of the machine should be done according to Fig.8 .
2. Foundation of the machine
(1). Foundation size may refer to Fig.9 , the installation foundation .
(2). The soil around the foundation should be compacted . The depth shall be
determined in accordance with the conditions of the soil .
3. Installation of machine
When installing the machine , the rolling ball cover on the working table
should be removed . Put a one-meter ruler on two packing blocks and use a
horizon for correction in longitudinal and transversal directions . The allowable
error in 1000mm should not be greater than 0.2mm .

8. Lubrication of Machine
1. The main lubrication points of the machine are lubricated by oil gun
injection , which are shown as follows :
Types and brand
Serial No. of Interval of
Name of lubricant points Oil amount names of lubricant
lubricant points oil filling
oils
One at each upper and lower
1 end of both left and right Small 16 Cacium base grease
return-stroke cylinders
One to both the left side or the
2 right side of the swing support Small 24
ZG 3 GB491-65
point of the upper cutter slide
Machine oil
One at both the left or the right
3 Small 48 N46GB443-84
side of gap adjusting shaft sleeve
4″graphite lithium
One in each piston rod of both
4 Medium 8 base grease
left and right oil cylinders
Q/SY1000-65
One in each packing block of
5 Medium 8
both left and right oil cylinders

Note:
1. Cacium base grease and machine oil are mixed in a ratio of 50% to 50%
for use .
2. Graphidte lithium base grease should be mixed with 30% machine oil
for use .
3.The oil in the oil container is changed every half a year in principle .

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page17of


37
Hydraulic Plate Shearing Machine Operation Instructions

hoisting position

Fig.8 Hoisting of Machine

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page18of


37
Hydraulic Plate Shearing Machine Operation Instructions

Note:The depth of foundation should


be selected according to the
oil properties.

Fig.9 Installation Foundation

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page19of


37
Hydraulic Plate Shearing Machine Operation Instructions

9. Adjustment and Operation of Machine

1). Adjustment of the cutter edge gap


The right adjustment of the cutter edge is an important factor influencing
the shearing quality and the prolonging of the cutter blade life . It is suggested
to select the gap values from the following table .

clearanceδ(mm)

0.6

0.5

0.4

0.3

0.2

0.1

0
1 2 3 4 5 6 7 8 Plate thickness h(mm)
For gap adjustment(see Fig.2) , loose the lock screw (3) , turn the handle to
the required graduation value and tight the screw (3) .
Ball valve (see Fig.1) is for measuring the uniformness of the edge gap
between the upper and lower cutter blades . The method is in one-time stroke
mode , when the upper cutter slide moves to the lower dead point , rapidly turn
the ball valve to close the oil circuit so as to let the upper cutter slide stop at the
lower dead point . Then open and close the ball valve little by little to make the
upper cutter slide complete the whole stroke by rising in steps , when the
uniformness of the cutter edge gap can be measured by steps .
2). Preparation for operation:
(1) Clean out the oil contamination on the surface of parts . Make sure the
gradation line on the ball valve point to the open position .
(2) Fill grease into lubrication points .

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page20of


37
Hydraulic Plate Shearing Machine Operation Instructions

(3) Fill into the oil tank 40# low condensation hydraulic oil .
(4) Earth the machine switch on the machine to check the action
coordination of various electrial appliances .

3. Operation
(1) Start the machine for several no-load running cycles . When it is sure
there are no abnormalities , try the shearing of plates with different thickness
(from thin to thick)
(2) Open the switch of pressure gange during the shearing process and
observe the pressure value of oil circuit . If there are any abnormalities , adjust
the overflow value to make it meet the specified requirement .
(3) If any abnormal noise or the overheat of oil tank is found during the
operation , immediately stop and inspect the machine . The maxium
temperature of the oil tank should be less than 60℃.

10. Safety Technology and Maitenance of Machine


1 The operators should be familiar with the structure and performances of
the machine . As the operation of the machine involves several people , there
should be a person specially assigned for the commanding of production .
2 Never to put the hand between the blades to avoid accidents .
3 Don’t put any articles or tools on the working table to avoid any
accidents caused by cutting into the cutter edge .
4 Check periodically the sharpness of the cutter edge . If found blunt , the
blade should be ground or changed timely . Only grind the thickness of the
blade .
5 Periodically check the various parts of the machine . Keep the machine
and the environment clean and make sure the wire is in good insulation
condition .
6 Often check and clean the net oil filtex on the suctivn inlet of the oil
pump to make it keep a normal oil through-flow . If the filter is blocked , the oil
through flow will be reduced , which could lead to the air suction of the oil
pump that will affect its life .
7 Filling oxygen , pressed air or other flammable gases into the
return-stroke cylinder is prohibited . Nitrogen filling should be made slowly .
8 Nitrogen filling into the return-stroke cylinder should be made with gas
filling tool with a filling pressure of 4.5Mpa .
Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page21of
37
Hydraulic Plate Shearing Machine Operation Instructions

9 Pressure gas should be released before taking-down the return-stroke


cylinder .

11. List of Rolling Bearings

Accuracy
No. Type Name Size Piece No. Installation Position
grade

Double-row centripetal D=90 D=160


7 3518 2 Upper cutter slide
spherical roller bearing H=40

12. List of Gears


Hand of Piece Heat
No. Name B a m z da ß f H Accuracy grade Material
spiral No. treatment

5 Pinion 20 20 2 25 50 1 4.5 9FHGB10095 45 2

Sector
6 18 20 2 250 500 1 4.5 9HKGB1005 45 2
gear

13. List of Basic Accessories carried with the Machine


No. Name Size Type Piece Number Remark

Oil gun 200Cm JB288--60 1

Gas filling pipe 1 set

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page22of


37
Hydraulic Plate Shearing Machine Operation Instructions

14. List of Customer-made Easy-to-wear Parts

Pieces Per
No. Name Material Weight Local Part
Machine

4 Half-round block ZznAl—6 1.1 2 Framework

Return-stroke
15 Guide bush ZznAl--6 1.2 2
cylinder
Return-stroke
17 Half-round block ZznAl--6 0.24 4
cylinder
Palte pressing
18 Tension spring 65Mn 0.72
cylinder

1 Upper cutter blade 9crsi 1 Cutter slide

2 Lower cutter blade 9crsi 1 Framework

Ether Palte pressing


Packing block 0.03
polyurethane cylinder

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page23of


37
Hydraulic Plate Shearing Machine Operation Instructions

1 Upper cutter blade 9CrSi 1:2

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page24of


37
Hydraulic Plate Shearing Machine Operation Instructions

1 Lower cutter blade 9CrSi 1:2

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page25of


37
Hydraulic Plate Shearing Machine Operation Instructions

Technical requirement :
All are chamferred to 1×45°

17 Half-round block ZznAl--6 1:1 0.24

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page26of


37
Hydraulic Plate Shearing Machine Operation Instructions

Half-round block ZznAl--6 1:1 0.24

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page27of


37
Hydraulic Plate Shearing Machine Operation Instructions

Technical Requirments
1. Hand of spiral : right
2. Number of effective turns : n=5
3. Total turn number : nl=11.5
4. Unfolding length of metal wire : L=2311
5. Heat treatment : (1) HRC43-48
(2) Bluing

Tension spring 65Mn 1:1 0.72

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page28of


37
Hydraulic Plate Shearing Machine Operation Instructions

Packing block Ether polyurethane 1:1 0.03

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page29of


37
Hydraulic Plate Shearing Machine Operation Instructions

Guide bush ZznAl—6 1:1 1.2

No. Name Material Scale Weight

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page30of


37
Hydraulic Plate Shearing Machine Operation Instructions

2500
QC12Y—8× 3200
4000
Hydraulic Swing Plate Shearing Machine

Certificate of Qualification

Product Number:

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page31of


37
Hydraulic Plate Shearing Machine Operation Instructions

ANHUI ZHONGDE MACHINE TOOL CO. , LTD.

The machine is proved qualifide for delivery


Product Number:

Quality inspector

General Manage

Month Date Year

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page32of


37
Hydraulic Plate Shearing Machine Operation Instructions

1. Testing of geometrial Accuracy mm

Serial Accuracy
Test item Testing method
No. Allowable Practical
error measurement

Move the cutter slide to


where the edges of the upper
and lower blades overlaps .
At a same gap at both ends ,
Uniformty measure the blade gap δ
0.06mm on
of gap every 150mm with feeler
1 the whole
between gange from the point 50mm
length
blade edges distant to the blade end face .
The error is calculated
according to the difference
between the maxium and
minium gap values

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page33of


37
Hydraulic Plate Shearing Machine Operation Instructions

Move the plate baffler to the


maxium and minium
positions respectively .
Measure the distance between
Parallelism the baffler and the lower
0.50mm on
of upper cutter blade at many points
2 a length of
blade with with inside micrometer and
1000mm
plate baffler feeler gange , at lest three
points per meter . The error is
calculated according to the
maxium difference of reading
value at any 1000mm length .

2. Testing of Work Accuracy mm

Accuracy
Serial
Test item Testing method
No. Allowable Practical
error measurement

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page34of


37
Hydraulic Plate Shearing Machine Operation Instructions

Lay the workpiece sample on


a plateform . Put 1000mm
long testing ruler against the
Linearity of sheared face of the 1.00mm on
1 workpiece workpiece . Measure the gap a 1000mm
sample between them with feeler length
gauge. The error is calcnlated
according to the maxium gap
value .

Measure the width of the


workpiece at many points (at
Parallelism lest three points per meter)
0.75mm on
of with vernier caliper . The
2 a 1000mm
workpiece error is calculated according
length
sample to maxium readings
difference in any 1000mm
length .

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page35of


37
Hydraulic Plate Shearing Machine Operation Instructions

2500
QC12Y—8× 3200
4000
Hydraulic Swing Plate Shearing Machine

Packing List

Product Number:

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page36of


37
Hydraulic Plate Shearing Machine Operation Instructions

ANHUI ZHONGDE MACHINE TOOL CO. , LTD.

Product Number:

QC12Y— × Hydraulic Swing Plate Shearing


Machine
Thickness of shearable plate
Width of shearable plate
Container No. 1/1 ( Fittings container )

Container size(Length×Width×Height) cm
Serial
Name Size or Mark Quantity
No.
1 Operation instructions one
Certificate of
2 one
qualification
3 Packing list one
4 Main frame one
M20×500 including nuts and
5 Foot screw four
washers
6 Foot switch one
3
7 Oil gun 200Cm JB288-60 one
8 Push-button key two
9 Dook lock key two
10 Overshoes twelve
11 Unlock key two

Packing Inspector (Signature)


Date : Year Month Date

Anhui Zhongde Machine Tool Co.,Ltd. http://englsih.zdmt.cn Page37of


37

You might also like