7 Storey BOQ
7 Storey BOQ
Owner :
Location
BILLING OF QUANTITIES
II Earthworks
Excavation 60 cubic 30,000.00
Backfill 60 cubic 30,000.00
Compaction 150 m2 12,000.00
Soil treatment 1 lot 10,000.00
Sub-Total 2 82,000.00
III Formworks &Scaffoldings
Materials:
1/2" thk. Phenolic plywood 1000 pcs 850 850,000.00 850,850.00
2"x2"x8 Coco lumber 2000 pcs 110 220,000.00 220,000.00
Assorted CWN 200 kgs 80 16,000.00 16,000.00
Assorted Concrete Nail 75 kgs 150 11,250.00 11,250.00
g.i Tie wire 5 roll 1800 9,000.00 9,000.00
Sub-Total 3 1,107,100.00
IV Stuctural Works
Materials: Ground Floor
Foundation
Concrete 4000psi
Mat Foundation 60 cubic 5000 300,000.00 300,000.00
32mm Deformed bars 110 pcs 900 99,000.00 99,000.00
#16 G.I tie wire 150 kgs 100 15,000.00 15,000.00
Columns
25mm Deformed bars 300 pcs 500 150,000.00 150,000.00
20mm Deformed bars 200 pcs 300 60,000.00 60,000.00
12mm Deformed bars 300 pcs 180 54,000.00 54,000.00
#16 G.I tie wire 15 roll 1800 27,000.00 27,000.00
Concrete 85 cubic 5000 425,000.00 425,000.00
Slab
12mm deformed bars 880 pcs 180 158,400.00 158,400.00
Concrete 23 cubic 5000 115,000.00 115,000.00
#16 G.I tie wire 15 rolls 1500 1,200.00 1,200.00
Interior Stair
16mm Deformed bars 900 pcs 400 360,000.00 360,000.00
10mm Deformed bars 300 pcs 180 54,000.00 54,000.00
Concrete 7 cubic 5000 35,000.00 35,000.00
#16 G.I tie wire 1 rolls 1500 1,500.00 1,500.00
Painting Works
ABC Skimcoat 1500 bags 400 600000 600,000.00
Boysen Flat Latex 500 pails 2200 1100000 1,100,000.00
Boysen Semi-gloss latex 500 pails 2800 1400000 1,400,000.00
Sub-Total 4 10,014,055.00