7 Storey BOQ

The document is a bill of quantities for a seven-story building with penthouse project. It includes costs for general requirements, earthworks, formworks and scaffolding, structural works, doors and windows, tile works, painting works, and a total project cost of over 11 million. The costs are broken down into items, quantities, unit costs, total costs, and a grand total.

Uploaded by

jaleen pio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
458 views2 pages

7 Storey BOQ

The document is a bill of quantities for a seven-story building with penthouse project. It includes costs for general requirements, earthworks, formworks and scaffolding, structural works, doors and windows, tile works, painting works, and a total project cost of over 11 million. The costs are broken down into items, quantities, unit costs, total costs, and a grand total.

Uploaded by

jaleen pio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project : Seven-Storey Building with Penthouse

Owner :
Location

BILLING OF QUANTITIES

ITEM DESCRIPTION QTY UNIT UNIT TOTAL INDIRECT GRAND


NO COST COST COST TOTAL
I Gen. Requirements
Permits , Fee's & Utilities 1 lot 500,000.00 500,000.00
Mobilization 1 lot 300,000.00 300,000.00
Sub-Total 1 800,000.00

II Earthworks
Excavation 60 cubic 30,000.00
Backfill 60 cubic 30,000.00
Compaction 150 m2 12,000.00
Soil treatment 1 lot 10,000.00
Sub-Total 2 82,000.00
III Formworks &Scaffoldings
Materials:
1/2" thk. Phenolic plywood 1000 pcs 850 850,000.00 850,850.00
2"x2"x8 Coco lumber 2000 pcs 110 220,000.00 220,000.00
Assorted CWN 200 kgs 80 16,000.00 16,000.00
Assorted Concrete Nail 75 kgs 150 11,250.00 11,250.00
g.i Tie wire 5 roll 1800 9,000.00 9,000.00
Sub-Total 3 1,107,100.00
IV Stuctural Works
Materials: Ground Floor
Foundation
Concrete 4000psi
Mat Foundation 60 cubic 5000 300,000.00 300,000.00
32mm Deformed bars 110 pcs 900 99,000.00 99,000.00
#16 G.I tie wire 150 kgs 100 15,000.00 15,000.00

Columns
25mm Deformed bars 300 pcs 500 150,000.00 150,000.00
20mm Deformed bars 200 pcs 300 60,000.00 60,000.00
12mm Deformed bars 300 pcs 180 54,000.00 54,000.00
#16 G.I tie wire 15 roll 1800 27,000.00 27,000.00
Concrete 85 cubic 5000 425,000.00 425,000.00

Beams and Girders


25mm Deformed bars 500 pcs 250 125,000.00 125,000.00
20mm Deformed bars 300 pcs 180 54,000.00 54,000.00
#16 G.I tie wire 25 roll 1500 1,200.00 1,200.00
Concrete 4000psi 90 cubic 5000 450,000.00 450,000.00

Slab
12mm deformed bars 880 pcs 180 158,400.00 158,400.00
Concrete 23 cubic 5000 115,000.00 115,000.00
#16 G.I tie wire 15 rolls 1500 1,200.00 1,200.00

Septic Vault 1 set


4" CHB 215 pcs 17 3,655.00 3,655.00
10mm deformed bars 30 pcs 180 5,400.00 5,400.00
Cement 15 bags 240 3,600.00 3,600.00
White Sand 2 cubic 800 1,600.00 1,600.00
Concrete 1.5 cubic 5000 7,500.00 7,500.00

Interior Stair
16mm Deformed bars 900 pcs 400 360,000.00 360,000.00
10mm Deformed bars 300 pcs 180 54,000.00 54,000.00
Concrete 7 cubic 5000 35,000.00 35,000.00
#16 G.I tie wire 1 rolls 1500 1,500.00 1,500.00

Masonry Works 1300 m2


CHB Laying 4" 20000 pcs 17 340,000.00 340,000.00
10mm deformed bars 1200 pcs 180 216,000.00 216,000.00
40kg cement 1000 bags 240 240,000.00 240,000.00
Vibro Sand 80 cubic 900 72,000.00 72,000.00
Plastering Works 2600 m2
White sand 50 cubic 800 40,000.00 40,000.00
Cement 1000 bags 240 240,000.00 240,000.00

Doors & Windows


Panel door 1800mmx2100mm w/jamb 6 set 50000 300,000.00 350,000.00
Flushed door w/Jamb 38 sets 10000 380,000.00 390,000.00
Steel door 2 sets 7000 14,000.00 14,000.00
uPVC Windows 1000mmx 1000mm 1 lot 300000 300,000.00 300,000.00

Tile Works (Owners design choice)


600mmx600mm glazed granite tiles 4000 pcs 310 1240000 1,240,000.00
300mmx600mm glazed tiles (Toilet& Bath) 2000 pcs 215 430000 430,000.00
Tile adhesive 1500 bags 350 525000 525,000.00
Consumbles (grout, cutting tools) 1 lot 20000 10,000.00

Painting Works
ABC Skimcoat 1500 bags 400 600000 600,000.00
Boysen Flat Latex 500 pails 2200 1100000 1,100,000.00
Boysen Semi-gloss latex 500 pails 2800 1400000 1,400,000.00

Sub-Total 4 10,014,055.00

Total Material Cost 11,203,155.00


Total Indirect Cost 20000.00
Total Labor Cost 424,599.60
Grand Total 11,647,754.60