Bill of Quantities for Shops Building
Bill of Quantities for Shops Building
Setting
Hardcore beds
200mm thick average levelled
compacted and blinded
1,883 M2 Stones 376.6 m3 26,250
Soil sterilisation
Concrete work
Plain insitu concrete grade ‘15’
To collection
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY To collection
4 M3 Ramps.
a)cement 24.8 bags 14,000
b)sand 2.0 m3 35,000
c)aggregates 3.0 m3 80,000
(d)Clean water from DAWASCO 1237.5 litres 16
89 M3 Ground beam
a)cement 587.4 bags 14,000
b)sand 48.0 m3 35,000
c)aggregates 70.5 m3 80,000
(d)Clean water from DAWASCO 29370.0 litres 16
166 M3 Foundations.
a)cement 1195 bags 14,000
b)sand 86 m3 35,000
c)aggregates 134 m3 80,000
(d)Clean water from DAWASCO 59760 litres 16
2 M3 Lift base
a)cement 14 bags 14,000
b)sand 1 m3 35,000
c)aggregates 2 m3 80,000
(d)Clean water from DAWASCO 720 litres 16
3 M3 Concrete walls
a)cement 22 bags 14,000
b)sand 2 m3 35,000
c)aggregates 2 m3 80,000
(d)Clean water from DAWASCO 1076 litres 16
Reinforcements
High Tensile
Formwork
330 M2 To vertical side of column bases.
1" x 8" x 3 m softwood timber 367 Pcs 12,000
Mortar
10mm thick joints; (1:3) to foundation walling
a)cement 443.0 bags 14,000
b)sand 21.4 m3 35,000
(c)Clean water from DAWASCO 22151.1 litres 16
Plinth finishes;
12mm thick cement and sand mix (1:3)
backing to receive wall tiles
To collection
Expansion joint
To collection
Collection
Page No.1
Page No.2
Page No.3
Page No.4
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY
70 M3 Columns.
a)cement 504.0 bags 14,000
b)sand 36.5 m3 35,000
c)aggregates 56.5 m3 80,000
(d)Clean water from DAWASCO 25200 litres 16
Reinforcement;Bars;bs4461;
cold Worked High Yield Steel;
Straight or bent in any location
Formwork
To collection
To collection
Collection
Page No.1
Page No.2
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY
5 M3 Horizontal beam.
a)cement 33.0 bags 14,000
b)sand 2.7 m3 35,000
c)aggregates 4.0 m3 80,000
(d)Clean water from DAWASCO 1650 litres 16
Reinforcement;Bars;bs4461;
cold Worked High Yield Steel;
Straight or bent in any location
Formwork
To collection
204 M2 600 x 600 x 10mm Thick tiling; to floor (1 box; 7 nr @ 1.42 143 Pcs 50,765
square meters)
253 M Risers; 150 mm high 253.0 M 7,040
253 M Tread ; 300 mm wide 253.0 M 13,200
154 M Skirting; 100 mm high 154.0 M 13,200
To collection
Collection
Page No.1
Page No.2
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY
Roof Structure
1,188 M 150 x 50 x 20ft mm. Top, bottom and struts 1188.0 M 5,250
593 Kg Wire nails various size (50kg bag) 11.9 Bag 150,000
209 M 1.2 mm thick x 450 mm wide flushing sheet 116.1 pcs 21,000
Metal works
Marine plywood
To collection
- M 150mm Diameter UPVC half round rainwater gutter as per 0.0 pcs 10,000
Engineer’s instructions; including cramps and all accessories
200 M @ 3.6
150 mmmeters
Diameter PVC down pipe; fixing with and including 33.3 pcs 22,000
brackets @ 5.8 meters
15 No 150 mm diameter Bends 15.0 pcs 20,000
To collection
Collection
Page No.1
Page No.2
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY
Reinforcement;Bars;bs4461;
cold Worked High Yield Steel;
Straight or bent in any location
Formwork
Block work
Solid concrete blocks with strength
of 5.5kN/M2: bedded and
jointed in cement/sand mortar.
Mortar
10mm thick joints; (1:3) to foundation walling
a)cement 1165.7 bags 14,000
b)sand 69.9 m3 35,000
(c)Clean water from DAWASCO 77710.0 litres 16
Hand rails
Panel Doors
door finishing
Glazing
8mm thick ordinary clear sheet glass;
glazed with timber beads on
timber ground
52 M2 Panes over 0.5 but not exceeding
1.0 square metres 52.0 M2 30,000
Iron mongery
METAL WORK:
To collection
METAL WORK
To collection
Collection
Page No.1
Page No.2
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY
2,477 M2 600 x 600 x 10mm Thick tiling; to floor (1 box; 7 nr @ 1.42 1744 Pcs 110,880
square meters)
2,372 M Skirting; 300 x 100 mm high 2372.0 M 3,850
14 Boxes 54,432
3,725 M2 450 x 450 x 10mm Thick heavy duty Industrial tiling; to floor (1
box; 7 nr @ 1.42 square meters) 2623 Boxes 149,100
35 M2 450 x 450 x 8mm Thick tiling; to floor ( 1 box;7 nr @ 1.42 24.6 Boxes 45,000
square meters)
429 M2 200 x 400 x 8 mm Thick tiling; to walls( 1 box;16nr @ 1.28 335 Boxes 35,840
square meters)
169 M2 200 x 200 x 8 mm Thick tiling; to walls( 1 box;16nr @ 0.64 264 Pcs 17,920
square meters)
208 M Aluminium cover strips; aluminium; 25 x 3 mm 207.7 M 6,300
Wall finish:
Plastering in two coats, first coat 12mm thick
cement and sand mix (1:3) steel trowelled;
prepare and apply second coat 3mm thick
stucco steel trowelled to smooth finish,
including sanding with sand paper.
To collection
Ceiling finishing:
1,714 M2 12mm Thick Gypsum board ceiling in symmetrical manner 595.1 pcs 21,000
144 Kg Wire nails various size (50kg bag) 2.9 Bag 150,000
360 Item Aluminum frame to receive for aluco bond 360.0 Item 14,000
To collection
To collection
Collection
Page No.1
Page No.2
Page No.3
BOQ UNIT DESCRIPTION QTY UNIT PRICE
QTY
1,225,000
502,133
180,000
5,649,000
1,115,100
743,400
67,047,120
9,885,750
617,050
68,180
1,965,104
3,640,140
997,668
3,004,560
208,008
AMOUNT
96,848,214
26,334,000
5,376,525
18,057,600
1,504,800
346,500
70,744
237,600
19,800
8,223,600
1,678,985
5,639,040
469,920
16,732,800
3,027,010
10,716,960
956,160
22,276,800
4,029,935
14,267,760
1,272,960
201,600
36,470
129,120
11,520
301,392
54,523
193,034
17,222
9,853,846
11,593,927
35,722,085
26,087,600
AMOUNT
225,441,839
4,400,000
1,760,000
330,000
9,493,333
1,384,444
890,000
1,320,000
192,500
52,500
608,750
84,549
7,125,000
989,583
33,891,200
6,202,311
747,600
354,418
2,135,700
798,000
4,956,000
4,716,250
716,100
179,025
40,920
AMOUNT
83,368,184
132,479
264,957
529,914
546
535,500
1,463,395
96,848,214
225,441,839
83,368,184
1,463,395
AMOUNT
407,121,631
7,056,000
1,276,450
4,519,200
403,200
31,248,000
5,652,850
20,013,600
1,785,600
6,066,144
1,097,382
3,885,221
346,637
70,912,800
12,828,323
45,417,960
4,052,160
12,631,762
66,144,325
57,505,770
13,218,297
33,080,853
16,413,458
14,352,000
2,093,000
373,750
48,500,000
4,715,278
842,014
AMOUNT
486,432,033
83,941,667
8,160,995
1,457,321
1,272,500
176,736
1,980,000
96,989,219
486,432,033
96,989,219
AMOUNT
583,421,252
3,451,140
704,608
2,366,496
197,208
462,000
94,325
316,800
26,400
8,525,633
750,000
109,375
19,531
1,316,667
192,014
34,288
983,333
95,602
17,072
177,500
12,326
36,250
5,035
316,250
43,924
10,887,500
5,505,500
AMOUNT
36,646,776
2,880,000
384,300
96,075
29,280
-
128,100
256,200
9,000
15,000
293
-
7,281,560
1,781,120
3,339,600
2,032,800
1,907,528
178,831
54,501
20,374,187
36,646,776
20,374,187
AMOUNT
57,020,963
6,237,000
3,732,750
1,212,750
4,586,400
7,805,700
1,779,030
14,817,054
2,438,333
22,974,000
772,975
3,063,200
287,175
87,520
1,344,000
1,176,000
144,000
6,930,000
1,392,000
AMOUNT
80,779,888
733,333
300,000
300,000
300,000
160,000
1,793,333
80,779,888
1,793,333
AMOUNT
82,573,221
6,791,400
1,386,578
4,656,960
388,080
2,732,305
9,138,961
7,819,990
2,318,056
118,896,300
16,319,100
2,447,865
1,243,360
21,334,500
204,000,000
AMOUNT
399,473,454
6,107,850
5,188,050
1,560,000
834,000
300,000
480,000
480,000
120,000
200,000
200,000
960,000
12,056,352
48,122,651
2,328,480
156,435,300
AMOUNT
235,372,683
58,212,000
13,860,000
38,640,000
10,626,000
39,508,560
55,104,000
1,701,000
AMOUNT
1,701,000
756,000
220,108,560
1,228,500
1,228,500
546,000
3,003,000
220,108,560
3,003,000
AMOUNT
223,111,560
193,415,324
9,132,200
766,648
391,125,000
1,109,155
12,012,000
4,732,000
1,308,321
35,039,200
3,284,925
1,001,120
1,403,136
438,480
133,632
31,827,600
7,956,900
2,424,960
AMOUNT
697,110,601
8,276,100
2,069,025
630,560
12,497,917
612,500
533,500
146,914
110,186
196,000
4,999,167
1,225,000
130,200
28,000
122,500
432,878
AMOUNT
50,400,000
5,040,000
2,079,000
89,529,446
2,436,000
2,436,000
697,110,601
89,529,446
2,436,000
AMOUNT
789,076,047
9,430,000
18,860,000
45,264
37,720,000
18,860
12,070
129,336,667
506,100
84,350
53,984
315,000
630,000
6,300
120,000
336
197,138,931
SUMMARY OF MATERIAL ESTIMATE
S.37
LABOUR CHARGES
ITEM DESCRIPTION QTTY UNIT PRICE(Tshs) AMOUNT(Tshs)
ELEMENT NO. 1– SUBSTRUCTURE
A Clearing site 2,050.00 sm 100.00 205,000.00
B Site setting 2,050.00 sm 300.00 615,000.00
C Excavation of trenches and pits 2,843.00 cm 1,500.00 4,264,500.00
D Backfilling and Earthfilling to make up levels 2,361.03 cm 1,000.00 2,361,030.00
E Laying hardcore
spraying bed treatment to hardcore and backfilling
anti termite 1,883 sm 2,000.00 3,766,000.00
F surfaces 1,763.00 sm 800.00 1,410,400.00
G casting Grade 15 concrete 48.15 cm 35,000.00 1,685,250.00
H Casting Grade 25 concrete to Column bases or the like 377.75 cm 35,000.00 13,221,250.00
I Casting Grade 30 concrete to Ground beam 391.99 cm 35,000.00 13,719,650.00
J Fixing formwork to cocncrete works 2,801.00 sm 3,000.00 8,403,000.00
K Fixing the rebars to positions 37,266.00 kg 630.00 23,477,580
L Construction of 230mm thick foundation wall 19,936.00 blocks 500.00 9,968,000.00
M Laying DPC;230mm wide 1,017.00 m 300.00 305,100.00
N Laying DPM 1,925.00 sm 300.00 577,500.00
O Casting Grade 15 concrete bed 1,900.00 sm 3,500.00 6,650,000.00
P Rendering to plinth wall 341.00 sm 1,000.00 341,000.00
Q painting to plith wall 341.00 sm 1,000.00 341,000.00
ELEMENT NO. 2 – FRAME.
A Casting Grade 30 concrete works 1,143.68 cm 35,000.00 40,028,800.00
B Cut,bend and fixing the steel bars to required areas 94,369.00 kg 600.00 56,621,400.00
C Fixing formwork to cocncrete works 8,843.50 sm 2,000.00 17,687,000.00
ELEMENT NO. 3 – STAIRCASE
A Casting Grade 25 concrete 42.35 cm 35,000.00 1,482,250.00
B Cut,bend and fixing the steel bars to required areas 4,023.25 kg 600.00 2,413,950.00
C Fixing formwork to cocncrete works 183.00 sm 2,000.00 366,000.00
D Fixing stainless steel pipes 221.00 lm 50,000.00 11,050,000.00
E Plaster work to surfaces of staircase 183.00 sm 1,500.00 274,500.00
F Painting to surfaces of staircase 183.00 sm 1,000.00 183,000.00
G Tiles fixing to landing 203.68 sm 5,500.00 1,120,240.00
H Tiles fixing to risers and steps 506.00 lm 3,500.00 1,771,000.00
I Skirting 154.00 lm 3,500.00 539,000.00
Flat roofing
D Installation of Xypex 547.00 sqm 8,000.00 4,376,000.00
E Damp proof membrane 315.50 sqm 1,500.00 473,250.00
F Beds for xypex 547.00 sqm 1,500.00 820,500.00
G Metal works + marrine ply wood 2,460.00 No 1,200.00 2,952,000
H Down water pipes 200.00 m 6,285.71 1,257,143
I Bends, outlets, emergency discharge 53.00 No 5,714.29 302,857.14
to collection 361,650,350.00
ITEM DESCRIPTION QTTY UNIT PRICE(Tshs) AMOUNT(Tshs)
A Apply one coat of textured with two coats of pigment (as 3,772.00 sqm 7,600.00
per client's satisifaction) on plastered walls 28,667,200.00
to collection 308,024,100.13
ITEM DESCRIPTION QTTY UNIT PRICE(Tshs) AMOUNT(Tshs)
Collection
PROVISIONAL
1 Spades 60 no 10,000.00
2 Nail hummer 35 no 5,000.00
3 10litres buckets 20 no 3,000.00
4 Wheel barrow 20 no 30,000.00
5 Msumeno 25 no 25,000.00
6 High speed exsaw complete with frame 10 no 17,000.00
7 Oil lubricant 180 litres 35,000.00
8 Sululu complete 15 no 15,000.00
9 Temporary sim tank 5000ltr (New) 4 no 800,000.00
10 Generators ; 2 No, new 2 no 20,000,000
11 Tiles cutter 5 no 150,000
12 Bulldozer 40 hrs 100,000
13 Wheel Loader 40 hrs 100,000
14 Motor Grader 40 hrs 90,000
15 Water bowser 40 hrs 100,000
16 Tiper truck (7 tonne and under) 1440 hrs 100,000
17 Dump Truck (more than 7 ton Capacity) 1440 hrs 40,000
18 Concrete mixer 1440 hrs 100,000
19 Concrete vibrator 1440 hrs 50,000
20 Excavator 72 hrs 150,000
21 Low Loader 10 hrs 100,000
22 petrol 175 litres 2,100.00
600,000
175,000
60,000
600,000
625,000
170,000
6,300,000
225,000
3,200,000
40,000,000
750,000
4,000,000
4,000,000
3,600,000
4,000,000
144,000,000
57,600,000
144,000,000
72,000,000
10,800,000
1,000,000
367,500
498,072,500
BILL No. 03 (SHOP BUILDING) - SUMMARY