Elevation: Notes
Elevation: Notes
1. CONCRETE:
2. REINFORCEMENT:
450mm A. ALL REINFORCINGSTEELSHALLBE DEFORMEDBARSCONFORMINGTO AASHTOM31 (ASTMA615)
50
MANUFACTURER
450mm
BE 20 mm LARGER THAN 3. DRIVING
DOWELS A. PILE HEADSSHALLBE PROTECTEDFROM DIRECTIMPACT OF THE HAMMERBY CUSHION BLOCKS
1000mm
30
BY THE ENGINEER/CONSULTANT BASED ON THE LOADINGINFORMATIONGIVEN IN THE PIERS
DETAILS.
10 mmø SPIRAL ELEVATION
5. PILE SPLICE:
A. PILES MAY BE SPLICEDONLY IF STRICTLYNECESSARYAND APPROVEDBY THE ENGINEER.PILE
SPLICES SHALL BE LOCATED AT LEAST 10m BELOW THE EXISTING GROUND LEVEL.
B. PILE SPLICE SHALL DEVELOP100% AXIAL, AND 50% BENDINGOF THE CAPACITYOF THE PILE
4 PILE SPLICE DETAIL SECTION WHERE THE SPLICE IS LOCATED.
10 mmø SPIRAL
SP15 40
167 eh Eh Wr + 0.16 Wp
120 Pall =
WELD LENGTH S + 2.54 Wr + WP
8-28 mmø
450mm
LONGITUDINAL
BARS WHERE:
Pall = ALLOWABLE PILE BEARING CAPACITY (KN)
150 eh = HAMMER EFFICIENCY
LAP LENGTH Eh = HAMMER ENERGY RATING (KN-m)
1000mm
9. TEST PILES:
TEST PILES SHALLBE DRIVENWITH HYDRAULIC HAMMERUSED FOR DRIVINGREGULARPILES AND
5 MAY BE PART OF FOUNDATION IF APPROVED BY THE ENGINEER.
3 P I L E S E C T I O N
SP15 40 SCALE 1:5 3 MIN 10. PICK - UP POINTS:
IN PICK - UP POINTSSHALLBE MARKEDON ALL PILESAND ALL LIFTINGSHALL BE DONEAT THESE
50
POINTS.
300 x 300 3
0.30L 0.70L
ANCHOR BARS
1-POINT PICK-UP
SECTION
1 P I L E E L E V A T I O N 0.21L 0.58L 0.21L
SP15 40 SCALE 1:10
50
FULL WELD
150
2 PILE TIP FOR HARD DRIVING THE USE OF SPECIAL EMBEDDED OR ATTACHED LIFTING DEVICES SHALL BE SUBJECT TO THE
SP15 40 SCALE 1:10 APPROVAL OF THE ENGINEER.
PROJECT NAME AND LOCATION: SHEET CONTENTS: SURVEYED: PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
C.Y. 2023 PROJECT RONALD M. ABERIN
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS DETAILED ENGINEERING DESIGN PLAN FOR ENGINEER II
REGION - X WIDENING OF PERMANENT BRIDGES SP 41
CAGAYAN DE ORO 1st DISTRICT ENGINEERING OFFICE ARDENT B. DAGALA JOSE MARCOS S. DACANAY EVELYN A. TIRADO ANA LEE M. MANZANO,DM,A.Er
IPONAN BRIDGE 2 (B01397MN) PILE SECTIONS AND DETAIL DRAFTED:
ENGINEER II CHIEF, PLANNING AND DESIGN SECTION ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
10th RES Comp. Bulua, Cagayan de Oro City 15 23 57
ALONG BUTUAN CITY-CAGAYAN DE ORO CITY-ILIGAN CITY RD. ERIKA FAYE S. GUTIERREZ DATE: DATE: DATE: DATE:
CAGAYAN DE ORO CITY ENGINEER II
DATE :