0% found this document useful (0 votes)
91 views5 pages

03 Goal-Use Analysis Worksheet-V2.0 (Excel)

The document is a worksheet to help project teams develop BIM goals and select appropriate BIM uses. It lists potential goals such as increasing design and field productivity, accurate record models, and tracking construction progress. For each goal, it identifies relevant BIM uses like design reviews, 3D coordination, and 4D modeling. It then provides a BIM use analysis table to evaluate different uses for value, responsibility, capability, and resource needs. The analysis considers uses like record modeling, cost estimation, 3D coordination, and design authoring for various project stakeholders.

Uploaded by

ale10201
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
91 views5 pages

03 Goal-Use Analysis Worksheet-V2.0 (Excel)

The document is a worksheet to help project teams develop BIM goals and select appropriate BIM uses. It lists potential goals such as increasing design and field productivity, accurate record models, and tracking construction progress. For each goal, it identifies relevant BIM uses like design reviews, 3D coordination, and 4D modeling. It then provides a BIM use analysis table to evaluate different uses for value, responsibility, capability, and resource needs. The analysis considers uses like record modeling, cost estimation, 3D coordination, and design authoring for various project stakeholders.

Uploaded by

ale10201
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 5

BIM Goal and Use Worksheet - Version 2.

The purpose of this worksheet is to assist project team members in the development of BIM Goals
and the selection of BIM Uses based on project and team characteristics.
BIM Goals Worksheet
Priority (1-3)
Goal Description Potential BIM Uses
1- Most
Important Value added objectives
BIM Goals Worksheet
Priority (1-3)
1- Most Goal Description Potential BIM Uses
Important Value added objectives
Design Reviews, 3D
2 Increase Field Productivity Coordination
Design Authoring, Design
1 Increase effectiveness of Design Reviews, 3D Coordination
Record Model, 3D
3 Accurate 3D Record Model for FM Team Coordination
Engineering Analysis, LEED
3 Increase effectiveness of Sustainable Goals Evaluation
2 Track progress during construction 4D Modeling

1 Identify concerns accosiated with phasing on campus 4D Modeling


3 Review Design progress Design Reviews

3 Quickly Asses cost associated with design changes Cost Estimation


2 Eliminate field conflicts 3D Coordination
BIM USE ANALYSIS
Version 2.0

Value to Additional Resources /


Value to Responsible Capability
BIM Use* Resp Competencies Required to Notes
Project Party Rating
Party Implement
Scale 1-3
High / Med / High / Med (1 =
Low / Low Low)

Competency

Experience
Resources
Maintenance Scheduling

Building Systems Analysis

Record Modeling

Cost Estimation

4D Modeling

Site Utilization Planning

Layout Control & Planning

3D Coordination (Construction)

Engineering Analysis

Site Analysis

Design Reviews

3D Coordination (Design)

Existing Conditions Modeling

Design Authoring

Programming
BIM USE ANALYSIS

Value to Additional Resources /


Value to Responsible Capability
BIM Use* Resp Competencies Required to Notes
Project Party Rating
Party Scale 1-3 Implement
High / Med / High / Med (1 =
Low / Low Low)

Competency

Experience
Resources
Record Modeling HIGH Contractor MED 2 2 2 Requires training and software
Facility Manager HIGH 1 2 1 Requires training and software
Designer MED 3 3 3

Cost Estimation MED Contractor HIGH 2 1 1

4D Modeling HIGH Contractor HIGH 3 2 2 Need training on latest software High value to owner due to
Infrastructure needs phasing complications
Use for Phasing & Construction

3D Coordination (Construction) HIGH Contractor HIGH 3 3 3


Subcontractors HIGH 1 3 3 conversion to Digital Fab required Modeling learning curve possible
Designer MED 2 3 3

Engineering Analysis HIGH MEP Engineer HIGH 2 2 2


Architect MED 2 2 2

Design Reviews MED Arch LOW 1 2 1 Reviews to be from design model


no additioanl detail required

3D Coordination (Design) HIGH Architect HIGH 2 2 2 Coordination software required Contractor to facilitate Coord.
MEP Engineer MED 2 2 1
Structural Engineer HIGH 2 2 1

Design Authoring HIGH Architect HIGH 3 3 3


MEP Engineer MED 3 3 3
Structural Engineer HIGH 3 3 3
Civil Engineer LOW 2 1 1 Large learning curve Civil not required

Programming MED Planning Phase Complete

You might also like