Metro Rail Signal Systems Guide

The document provides an overview of the Computer Based Interlocking (CBI) system for the Ahmedabad Metro Rail Project Phase 1. The CBI system consists of electronic interlocking racks, terminal racks, I/O racks, and OT/FT racks installed at interlocking stations and depots. The CBI receives route setting information and track switch control from the Automatic Train Supervision system or local control panel to control signaling aspects and track switches through interlocking logic. The CBI configuration includes Operator Consoles for control and monitoring, Communication Blocks for interfacing with field equipment, and Power Boxes for power supply control.

Uploaded by

er.ras.ma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
174 views20 pages

Metro Rail Signal Systems Guide

The document provides an overview of the Computer Based Interlocking (CBI) system for the Ahmedabad Metro Rail Project Phase 1. The CBI system consists of electronic interlocking racks, terminal racks, I/O racks, and OT/FT racks installed at interlocking stations and depots. The CBI receives route setting information and track switch control from the Automatic Train Supervision system or local control panel to control signaling aspects and track switches through interlocking logic. The CBI configuration includes Operator Consoles for control and monitoring, Communication Blocks for interfacing with field equipment, and Power Boxes for power supply control.

Uploaded by

er.ras.ma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 20

Project: Ahmedabad Metro Rail Project Phase - 1

Design, Manufacture, Supply, Installation,

Scope of Testing, and Commissioning of Signalling

Contract: and Train Control Systems for Ahmedabad

Metro Rail Project Phase - 1

S&TC
NIPPON SIGNAL CO., LTD.
Contractor:

Employer MEGA CO LTD

Document
Sub-system Overview CBI
Title:

Document
AMDPJ-MEGA-SYS-2103
No.

Name Date Signature

Author K. Satyavenu 29/11/2017

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 1 of 20

Revision: A Title: Sub-System Overview (CBI)


Reviewer Tsuneaki Hashimoto 04/01/2018

Approver Tatsuya Ishikawa 04/01/2018

Revision History

Rev Author Date Reference Changes


.

A K. Sathyavenu 29/11/2017 First issue

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 2 of 20

Revision: A Title: Sub-System Overview (CBI)


INDEX
1. APPLICATION..................................................................................................................4
2. ABBREVIATION...............................................................................................................4
3. COMPUTER BASED INTERLOCKING (CBI)..................................................................5
3.1 General......................................................................................................................................................................5
3.2 Configuration............................................................................................................................................................5
3.2.2 Description..........................................................................................................................................................7
3.3 Function.....................................................................................................................................................................7
3.3.1 General Function................................................................................................................................................7
3.4 Equipment.................................................................................................................................................................8
3.4.1 OC.......................................................................................................................................................................8
3.4.2 Realization of Fail-safe.....................................................................................................................................13
3.5 LAN interface function..........................................................................................................................................13
3.6 CBI LAN..................................................................................................................................................................17
3.7 ATS Ethernet..........................................................................................................................................................17

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 3 of 20

Revision: A Title: Sub-System Overview (CBI)


1. Application
This document is applicable to sub-system CBI for Metro-Link Express for Gandhinagar and
Ahmedabad Gujarat, India, for implementation of the Ahmedabad Metro Rail Project Phase - 1.
This document applies to all aspects of NS scope of work for the contract; including works
conducted by the NS Sub-contractors and other appointed agencies. There is no activity
associated with the project, which is exempted from the application of this plan.

2. Abbreviation
ATO Automatic Train Operation
ATP Automatic Train Protection
ATS Automatic Train Supervision
CBI Computer Based Interlocking
CBTC Communication Based Train Control
DTO Driverless Train Operation
EKT Electric key transmitter

GEBR Guaranteed Emergency Brake Rate


Metro Link Express for Gandhinagar and Ahmedabad
MEGA
(MEGA) Company Limited, Gandhinagar
NS NIPPON SIGNAL CO., LTD
NSP Normal Stopping Point
PDC Power Distribution Center
SC Station Computer
SOD Schedule of Dimensions
SPK Staff Protection Key
SRJ Stock Rail Joint
TCMS Train Control Management System
Train Wayside Communication. It means CBTC
TWC
communication.
VCB Vacuum Circuit Breaker

Note: Please refer the document “AMDPJ-MEGA-MANAGE-1251 Master list of Abbreviations”.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 4 of 20

Revision: A Title: Sub-System Overview (CBI)


Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 5 of 20

Revision: A Title: Sub-System Overview (CBI)


3. Computer Based Interlocking (CBI)

3.1 General
CBI receives route setting information and track switch control from ATS or Local Control Panel
to control the aspect of ATP, shunting signal and track switch. Interlocking is performed by the
micro-processor to realise the safety functions. CBI also has such functions as self-checking,
monitoring, and storing the fault information. The CBI is an Entry-Exit system

3.2 Configuration
The CBI system proposed in this project consists of electronic interlocking rack, electronic
terminal rack, I/O rack, OT/FT rack, interlocking control panel, and interlocking monitor. This
system is installed at interlocking stations and Depot.
The main functions of the CBI system are:
1) Route control: switch control, ground signal control, interlocking, control command input
and state display output
2) Lock: detector lock, route lock, approach lock
CBI basic configuration for one station is as below.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 6 of 20

Revision: A Title: Sub-System Overview (CBI)


Figure 3-1: Configuration of CBI

The CBI system consists of OC, CB, PB, and VDU.


For large stations, like Depot and stabling area, each OC consists of Master and Slave
configuration. Only one Master OC is installed at one Interlocking station.
Details of network is shown in “System Configuration Drawing Overview”.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 7 of 20

Revision: A Title: Sub-System Overview (CBI)


3.2.2 Description
Table 3-1 Description
No Module Description
. name
1 OC Main rack of CBI. Interlocking logic is installed and
controls each Field equipment via CB and PB.
2 Logic card Interlocking logic software is installed in this card. CPU of
block this card calculates Interlocking logic.
3 IO card block This block converts between Serial data of Logic card and
parallel output of Field equipment.
4 Input block This block insulates internal connection.
Output block This block insulates outer connection.
5 Terminal WAGO terminal or screw terminal.
6 CB Interface and Insulation relay is installed in CB. Output
voltage of OC is fixed. Relay circuit of CB is necessary to
take Interface between OC and Field equipment.
7 PB Power supply control relay is installed in PB. OC can’t
output high voltage for Point machine directory. Interface
relay circuit is necessary.
8 VDU CBI control console which is independent from ATS.
9 FIT Failure rate in one hour.
10 CE An equipment of digital axle counter.

Table 3-2 Corresponding document list

No. Document name



Detail Interface Document (CBI-SC)

Detail Interface Document (ATS-CBI)

Detail Interface Document (CBI-Axle counter)

Detail Interface Document (CBI-Field equipment)

Detail Interface Document (CBI-CBI)

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 8 of 20

Revision: A Title: Sub-System Overview (CBI)


3.3 Function

3.3.1 General Function


OC has the following functions. These functions are required in SEM.
Functions of OC are shown as below.
OC responds to ATS/VDU in other SER or OCC, when OC receives command from VDU or
ATS.
OC receiving command from ATS or VDU controls route with following procedure.
1) As other Route Control, Route Locking, Approach Locking and Blocking do not have conflict,
Route Control is set.
2) OC controls the point in the direction of Route by setting Route Control.
3) OC locks Route’s Approach Locking and Route Locking /point on Route, after changing
Point direction.
4) OC changes Single Aspect to R, V or G, after locking Approach Locking and Route Locking.

3.4 Equipment

3.4.1 OC
OC is a central equipment of CBI. It is set in the SER of interlocking stations. It connects to CB
to interface other equipment. OC doesn’t need relay for logic operation. OC controls SPARCS,
signal, point, PSD in a fail-safe manner as per the selection table and generate required output.
OC collects information about state of other equipment as follows to interlock each other.
(1) SPARCS Train existing
(2) Axle Counter Train existing
(3) Signal state of light
(4) Point machine state of position
(5) ESP state of button
(6) PSD state of Door
(7) EKT and SPK state of button

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 9 of 20

Revision: A Title: Sub-System Overview (CBI)


Table 3-3 Rating
No
.
1 Temperature -10℃ ~ +70℃
2 Input voltage 85 ~ 265VAC 47 ~ 63Hz
3 Number of input 180
5 Number of output 180 *1
6 Output voltage 24VDC
7 CPU 32 Bit Fail Safe CPU
8 Interface port RJ45 x 3/system
9 Interface port SM optic fiber SC-CN x 4
10 EMC IEC62236-4
IEC61000-6-4 class A 10m
IEC61000-4-2
IEC61000-4-3
IEC61000-4-4
IEC61000-4-6
IEC61000-4-9
1 Architecture Two sets of two out of two hardware with identical
1 hardware and common diverse software.
12 Software IEC 62279 Ed. 1.0:2002
13 V&V IEC 62425 Ed. 1.0:2007
14 Ventilation N/A
15 International IP20
Protection
16 Cycle time 200ms

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 10 of 20

Revision: A Title: Sub-System Overview (CBI)


17 Heat dissipation 6000W
*1: One OC has 180 input ports and 180 output ports. Including 25% spare, if more than 180
input ports or 180 output ports are necessary, additional OC will be installed.

Figure 3-2 : OC Configuration

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 11 of 20

Revision: A Title: Sub-System Overview (CBI)


Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 12 of 20

Revision: A Title: Sub-System Overview (CBI)


Table 3-4 Card Name
1 ACEH
2 AMLAN
3 SUB-ACE
4 CHR
5 APO
6 API

3.4.1.1 Interlocking processor


3.4.1.1.1 Route control
1) Switch control: Throws over the switch and controls it in the direction of route.
2) Ground signal control: Controls the aspect of the ground signal according to the route.
3) Interlocking: Provides interlocking between ground signal and switch and between ground
signals.
4) Control command input: Inputs and processes control commands from the interlocking control
panel and ATS.
5) State display output: Outputs track clear/occupied status, switch state, and signal aspect to
the interlocking control panel and monitor.
3.4.1.1.2 Lock
1) Detector lock: Disables the switch to be thrown over when a train occupies a track in the
detector section.
2) Route lock: Disables the switch to be thrown over within a section until a train has passed the
section completely after the route is clear.
3) Approach lock: Ensures the route for a given period when the signal aspect is changed to stop
aspect.
3.4.1.1.3 VEDIO DISPLAY UNIT (VDU)
VDU comprises of a personal computer and an operation panel. Normally, route setting and
track switching are performed by ATS. However, in case of ATS fault for example, VDU is used
to set routes and turn track switch etc. in manual mode.
The personal computer output such information as route setting and track switch to field
equipment. It input such information as track occupation information, signal aspect information
and fault information. These data are transmitted via LAN.
The operation panel output control information to the field equipment and input indication
information from the field equipment via I/O rack. Relay contact interface is utilised between the
operation panel and field equipment.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 13 of 20

Revision: A Title: Sub-System Overview (CBI)


Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 14 of 20

Revision: A Title: Sub-System Overview (CBI)


3.4.1.2 VEDIO DISPLAY UNIT
1) Control function of VDU
VDU has the following control functions and these functions are used in manual mode.

No Item Control Function

Route
1 Set a main signal route and a shunting route.
setting

Track switch Set a track switch control mode. There are two modes such
2
setting as “Route Control” and “Track Switch Control”.

Prohibition Halt usage of route setting and track switch. This function is
3
setting used when a particular route and switches are not used.
2) Indication function of VDU
VDU has the following indication functions and these functions are used in manual mode.

No Item Indication Function

1 Train location Indicate the status of No


occupancy/Occupancy/Route set. Train location fault
is specified on the display of train location of personal
computer.

2 Signal Indicate the status of Go/Stop. Signal fault is


displayed on the personal computer to be identified.

3 Emergency stop Indicate the status of Normal/Emergency stop by


by ATS ATS.

4 Traction power Indicate the status of Electricity supplied/ Electricity


not supplied.

5 Track switch Display the track switch direction. Broken switch is


identified on the display of the personal computer.

6 Track switch Display the remaining time for locking.


locking timer

7 Fault Display the fault section.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 15 of 20

Revision: A Title: Sub-System Overview (CBI)


3.4.2 Realization of Fail-safe
The CBI equipment realises fail-safe function adopting the bus synchronous duplicated system
which is the technology widely used in Japanese railways.
Conceptual composition of the bus synchronous duplicated system is shown below.
1) CPU-A and CPU-B are running on identical software.
2) The normal relay functions when operation of CPU-A matches that of CPU-B.
3) The power for the output section is supplied at contact point of the normal relay.

Above two CPUs are composed of duplex system to maintaining safety. This system is allocated
to a single logic unit and two logic units are composed of logic portion of the electronic
interlocking equipment in redundant composition.

3.5 LAN interface function


Each portion composing this equipment relates to a kind of LAN line to work during exchanging
various information. The outline of LAN line is shown as follows.
1) The connection of LAN is shown in the following drawing.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 16 of 20

Revision: A Title: Sub-System Overview (CBI)


Figure 3-3:Connection method of LAN

a) There are two kinds of nodes.


・ Boundary node: This is only one node existing on the LAN line to generate the
transmission frame at every transmission period.
・ General node: They indicate all nodes except boundary node to relay the received
transmission frame.
b) Whether the operation as boundary node or general node is designated by DIP SW on LAN
unit of each node.
c) The LAN line is composed of duplex lines called L-line and R-line. Each line flows the data
in reverse to each other.
d) Each node connects to each portion called HOST to process its own task and to exchange
the information from LAN line.
e) The HOST does not recognise whether own node is boundary node or general node.

2) Composition of node
Each node has the CPU for transmission circuit and the CPU for control. The composition block
of node is shown in the following drawing.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 17 of 20

Revision: A Title: Sub-System Overview (CBI)


3) Composition of node
Each node has the CPU for transmission circuit and the CPU for control. The composition block
of node is shown in the following drawing.

Figure 3-4:Block of node

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 18 of 20

Revision: A Title: Sub-System Overview (CBI)


4) Transmission frame
The composition of transmission frame is shown in the following drawing.

Figure 3-5:Transmission frame

a) Each HOST (Logic block) is a Seat Reservation System which has the fixed area (called
unit data).
b) The unit data length is determined at the time of system construction to have the constant
in ROM of node side.
c) The HOST makes the unit data allocated to its own system. When it requests the answer
from the node, the node stores the received frame of each line in the storing position in
accordance with the unit data number to relay-transmit to the related lower line.
d) The unit data to each HOST is allocated by the arrangement among the HOSTs.
e) The HOST CRCC is a check code for each HOST and the Hardware CRCC is a check
code between nodes.
f) The node checks the hardware CRCC to notify the HOST of only correct data.
g) The HOST adds the HOST CRCC to check, and repeal the related data if abnormal.
h) The sequence number is added to confirm the refreshment of related information. The node
judges the reception of additional information by updating the sequence number to notify
the HOST.
The HOST judges by having updated the sequence number of related unit data that the
counterpart device is normally operating.

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 19 of 20

Revision: A Title: Sub-System Overview (CBI)


3.6 CBI LAN
This chapter describes information of CBI LAN.
Here is an example. Details of designs will be made at the Final Design stage.
1) CBI-LAN VDU control
2) CBI-LAN ATS control
3) CBI-LAN ATS indication
4) CBI-LAN interlocking control

3.7 ATS Ethernet


This chapter describes information of ATS Ethernet.
It is one example. Details of the designs will be made at Final Design stage.
The interface between the CBI and ATS is of Ethernet communication.

1) CBI-LAN ATS indication


2) CBI-LAN interlocking control

Doc No: AMDPJ-MEGA-SYS-2103 Project: Ahmedabad Metro Rail Project Phase - 1 Page 20 of 20

Revision: A Title: Sub-System Overview (CBI)