0% found this document useful (0 votes)
618 views36 pages

GTAG 21 Auditing Applications

Uploaded by

Farid Abdelkader
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
618 views36 pages

GTAG 21 Auditing Applications

Uploaded by

Farid Abdelkader
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 36

Auditing Business

Applications
Supplemental Guidance | Practice Guide

GLOBAL TECHNOLOGY AUDIT GUIDE


About the IPPF
The International Professional Practices Framework®
(IPPF®) is the conceptual framework that organizes
authoritative guidance promulgated by The IIA for
internal audit professionals worldwide.

Mandatory Guidance is developed following an


established due diligence process, which includes a
period of public exposure for stakeholder input.
The mandatory elements of the IPPF are:

• Core Principles for the Professional Practice


of Internal Auditing.
• Definition of Internal Auditing.
• Code of Ethics.
• International Standards for the Professional
Practice of Internal Auditing.
Recommended Guidance includes
Implementation and Supplemental Guidance.
Implementation Guidance is designed to help internal
auditors understand how to apply and conform with the
requirements of Mandatory Guidance.

About Supplemental Guidance


Supplemental Guidance provides additional information, advice, and best practices for providing
internal audit services. It supports the Standards by addressing topical areas and sector-specific
issues in more detail than Implementation Guidance and is endorsed by The IIA through formal
review and approval processes.

Practice Guides
Practice Guides, a type of Supplemental Guidance, provide detailed approaches, step-by-step
processes, and examples intended to support all internal auditors. Select Practice Guides focus
on:

• Financial Services.
• Public Sector.
• Information Technology (GTAG®).
For an overview of authoritative guidance materials provided by The IIA, please visit
www.theiia.org.

theiia.org
Contents

Executive Summary ................................................................................................................................... 2

Introduction ................................................................................................................................................ 3
IT-IS Control Frameworks ................................................................................................................................................ 4
Previous GTAG and Terminology .................................................................................................................................. 4
Objectives .............................................................................................................................................................................. 6

Business Application Engagement Planning ........................................................................................ 6


Scoping the Engagement ................................................................................................................................................ 8

Performing the Engagement ................................................................................................................... 9


Technology Planning ......................................................................................................................................................... 9
System Development Life Cycle ..................................................................................................................................11
Production Support ..........................................................................................................................................................16
Other Relevant Control Types ......................................................................................................................................19
Using Computer-assisted Audit Techniques ......................................................................................................... 22

Conclusion ................................................................................................................................................. 23

Appendix A. Related IIA Standards and Guidance ............................................................................ 24

Appendix B. Glossary ............................................................................................................................... 25

Appendix C. References .......................................................................................................................... 32

Acknowledgements ................................................................................................................................. 33

1 — theiia.org
Executive Summary

Business applications may be a single software


Note
program or a collection of hardware, firmware, and
software applications operating as an integrated The cover, logo, and references in
system to enable the organization’s processes. this guide have been updated
Business applications are subject to common IT and since its original publication. The
information security (IS) control categories. Each content has not changed.
category consists of standard control processes,
which vary in relevance depending on the
specificities of the organization and application. Stakeholders such as senior management and
the governing body require assurance services to verify whether controls over business
applications are well designed and effectively implemented.

This guide categorizes control objectives over business applications as relating to:

1. Technology planning — IT-IS planners work with business unit leaders to design technology
solutions to meet business needs. Enterprise and security engineers determine requirements
for applications and component technologies, often documented in a technology roadmap.
Planning for component obsolescence is a critical step in the roadmap.
2. System development life cycle — Applications require coding that adheres to functional and
security requirements. The source code is written, tested, released into service, and revised
as needed to fix errors, address security flaws, accommodate new technology, or add
features.
3. Production support — System administrators, who are usually in IT, prepare business
applications for service and provide ongoing support. System administrators work with the
benefitting business units to create system roles for various job functions and implement
account authorization, reauthorization, and deactivation processes.
4. Application security — Controls over secure design and coding, patch management, user
access management, and event logging are part of planning, the system development life
cycle, and support processes.
Other significant control objectives over business applications include but are not limited to:

5. Records and information management (RIM) — Maintaining documentation of application


architecture, system interfaces, data flows, and source code.
6. Vendor management — Ensuring contracts provide sufficient terms for the performance and
security of applications purchased from or significantly modified by vendors.

2 — theiia.org
7. Software asset management — Maintaining an inventory of in-service applications and
related metadata to support various governance and operational needs.
8. Database administration and business intelligence — Controlling access to and use of
application data to support privacy and management reporting objectives.

Introduction
A business application may be a single software
Note
program or a collection of hardware, firmware, and
software applications operating as an integrated Appendix A lists other IIA
system to enable the organization’s processes. resources that are relevant to this
Common examples of business applications include Guide. Terms in bold are defined in
enterprise resource planning systems, point-of-sale the glossary in Appendix B.
systems, industrial control systems, and customer
relationship management and billing systems. Key features that distinguish a business
application from a simpler program — often called a tool — include (1) whether the software has
been programmed to perform specific business processes and (2) whether user accounts have
differentiated permissions.

Typically, the organization’s IT department administers business applications; however, it is not


uncommon for shadow IT functions to exist within other business units, especially as vendor-
managed and cloud-based applications become more prevalent. Regardless of the department
performing system administration and oversight, the business unit personnel that benefit from
the applications have roles to play in defining business needs, executing authorization controls,
and providing feedback on system performance.

As directed by a risk-based audit plan, internal auditors may evaluate how organizations develop
or acquire business applications to facilitate significant business processes. A single internal
audit engagement may assess whether management has implemented controls to ensure
adequate confidentiality, integrity, and availability of systems and data. Some technology
control frameworks, such as the AICPA’s Trust Services Criteria, add security and privacy as
additional objectives.

Auditing a business application involves a risk


Standard 1200 –
assessment, a specified engagement scope, and
Proficiency and Due
tests to evaluate the design and implementation of
Professional Care
relevant controls to determine whether any
significant risk exposures exist. Ideally, the internal Engagements must be performed
audit activity, IT-IS teams, and the benefitting with proficiency and due
business unit personnel collaborate to provide professional care.
valuable insight into inherent risks, the strength of
controls, and residual risks. An audit engagement covering a business application may be one of
a series of engagements that supports the internal audit activity’s ability to provide assurance
regarding whether the organization’s information technology governance supports its
strategies and objectives, as required by Standard 2110.A2. Following this approach helps

3 — theiia.org
internal auditors demonstrate conformance with Standard 1200 — Proficiency and Due
Professional Care.

IT-IS Control Frameworks


This guide mentions three external IT-IS control frameworks of standards, guidance, and best
practices (although there are many others). Each framework provides more information about
specific controls than is discussed here. Internal auditors are encouraged to identify frameworks
used by their organizations and to review common IT-IS control guidance to understand
common risks and controls. Appendix C provides details on these sources.

This GTAG refers to controls described in the following publications:

• COBIT 2019 Framework: Governance and Management Objectives from ISACA.


• NIST Special Publication (SP) 800-53, Revision 5: Security and Privacy Controls for
Information Systems and Organizations from the National Institute of Standards and
Technology (also referred to as NIST SP 800-53r5).
• CIS Controls Version 8 from the Center for Internet Security.
IT-IS personnel frequently benchmark operational and security controls against one or more of
these frameworks. Although each framework uses its own groupings of controls, the categories
and terminology share substantial commonalities.

This Global Technology Audit Guide (GTAG) references the guidance in these frameworks where
doing so may be helpful to an auditor. Readers of this guide are assumed to have a general
knowledge of IT-IS risks and controls, as described in the GTAG “IT Essentials for Internal
Auditors.” Additionally, readers are encouraged to incorporate a review of the full texts of one or
more IT-IS control frameworks in their engagement planning and test programs.

Previous GTAG and Terminology


This guide supersedes the GTAGs “Auditing Application Controls” and “Auditing User-developed
Applications,” which were published in 2009 and 2010 respectively. Some terminology has been
revised and content rearranged to broaden the scope of the previous guides. The GTAG now
includes risks and controls relevant to the “Applications” technical domain, as depicted in Figure
1 below, which was introduced in the GTAG “IT Essentials.”

4 — theiia.org
Figure 1: The IIA’s IT Competencies for Internal Auditors

Source: The Institute of Internal Auditors.

The previous definition of “application controls,” which this guide refers to as “application
functionality controls,” was primarily focused on transaction-level risks, while the term “IT
general controls” was used to refer to everything else. Although these terms are still widely used
among auditors, they are not used in COBIT 2019, NIST SP 800-53r5, or the CIS Controls and do
not align with The IIA’s IT Competencies for Internal Auditors construct depicted in Figure 1. They
also do not align well with the IT infrastructure of a modern enterprise, which often includes
vendor-managed, cloud-based, and on-premises solutions, with varying control responsibilities
in each environment. Therefore, this guide does not use the terms “application controls” and “IT
general controls,” even though they may remain in use among audit practitioners.

In The IIA’s Standards, “information technology controls” is used in the broadest sense to
describe the governance and management of technology. However, this guide favors the phrase
“IT-IS risks and controls” because it reflects the common practice of splitting information
security responsibilities from information technology by establishing a chief information security
officer (CISO) who does not report to the chief information officer, although both may report to a
chief technology officer or similar executive. The phrase “IT-IS risks and controls” also better
captures the notion that the technology management practices that are recommended in widely
used IT-IS control frameworks have evolved to mitigate common universally applicable risks.
Accordingly, this GTAG broadly covers risks and related controls in process-based groupings, as
outlined in the Executive Summary.

5 — theiia.org
Objectives
This guide is intended to help the reader:

• Define business applications and obtain a working knowledge of relevant processes,


including related administrative and operational controls.
• Understand risks and opportunities associated with business applications.
• Understand components of the system development life cycle, including:
o Coding to meet operational and security requirements.
o Testing for security and functionality.
o Controlling the release and storage of source code.
o Installing security patches and other updates.
• Understand components of production support, including:
o Configuring the application and connections to external systems.
o Administering system roles and accounts.
o Responding to user and operational feedback, including errors and outages.
• Understand some related controls for documentation, vendor management, asset
management, and reporting from application databases.
• Understand approaches to auditing business applications, including specific controls that
should be present and evaluated.

Business Application Engagement Planning


Before setting an engagement’s scope, internal auditors can take a methodical approach to
understand an application’s context and delivery model by assessing relevant risks. Asking a
series of questions about the application’s use and administration may help internal auditors
assess the inherent risks of a business application. Figure 2 shows potential questions and
describes their relevance to an application risk assessment.

Q# Question Relevance to Risk Assessment


1. Is the application a single software program An application platform is inherently riskier than a single
or a platform that consists of multiple application due to security and performance risks with
applications and products interfacing and component technologies — on top of risks associated with
operating together? the primary application.

2. What significant business processes does the Unclear or disengaged ownership may lead to suboptimal
application support, and who is/are the management of strategy, governance, business requirements,
business owner(s)? service delivery, or the prioritization or funding of
enhancements.

3. Does the application process financial Applications that process financial transactions may be
transactions? Is the process a significant subject to external audits of financial statements, so
input to the financial statement accounts? coordination of assurance services should be considered (per
Standard 2050 – Coordination and Reliance). Fraud is also a
likely risk.

6 — theiia.org
Q# Question Relevance to Risk Assessment
4. Does the application process or store Data privacy, compliance, and cybersecurity risks are
personally identifiable information (PII) or heightened when an application handles or stores PII.
other sensitive data?

5. Is the application internet facing? Controls over encryption, firewalls, secure coding,
connections to external systems, and monitoring are typically
more important for internet-facing applications.

6. To what extent are vendors involved in Nonemployees may execute controls related to the system
developing, administering, or hosting the development life cycle, system administration, database
application? administration, and hosting, which heightens vendor risk and
the importance of performance oversight as well as identity
and access management.

7. To what extent is the application included in Due to control inheritance, an internal audit assessment may
standardized control processes, such as not need to retest the controls of an application covered by
identity and access management, patch standardized controls that work in multiple systems and have
management, monitoring for availability, and been tested in a separate engagement.
cybersecurity?

8. Has the application been the subject of an Previously identified conclusions of design inadequacy or
internal audit engagement before? If so, what operating ineffectiveness can be retested, although a fresh
were the engagement objectives, scope, risk assessment and scope determination are advisable.
and results? Are there any open action plans?

9. Has the application been covered by a recent Considerations are similar to #8, although internal auditors
risk assessment performed by IT-IS or by an should evaluate the testing performed by other assurance
external assurance provider, such as for a providers (for example, external auditors) to reduce overlap
Payment Card Industry Data Security and efficiently utilize resources. Furthermore, the internal
Standards (PCI-DSS) or Service Organization audit activity may consider providing consulting services
Controls (SOC) audit? Have deficiencies or (advisory engagements) to reduce the client’s audit fatigue
excessive risk exposures been noted? while still promoting positive changes.

10. Is the application (and its component If the organization does not have an inventory system
applications) included in the organization’s integrated with governance, development, and support
software inventory, completely populated processes, there is a higher likelihood of manual processes,
with key metadata, such as business owner; which are inherently riskier than automated ones.
production support, development, and
security contacts; system criticality and data
classification ratings; and system
interfaces?

11. Is there a significant risk or history of fraud or Instances of fraud or cybersecurity breaches can highlight
cybersecurity breaches? Have the root deficiencies in the design or implementation of controls.
causes been identified and remediated?

12. Does there appear to be a robust control The existence of well-documented expectations, monitoring
environment, including but not limited to of outcomes, and corrective actions taken for variances
policies, procedures, designated personnel typically indicates a well-controlled environment, and the
for properly separated roles, management opposite is true.
reporting, and training?

7 — theiia.org
Scoping the Engagement Standard 2220 –
Engagement Scope
Business applications may enable, support, or
monitor business processes, which themselves may The established scope must be
be part of larger processes. Using and supporting sufficient to achieve the
business applications depends upon multiple objectives of the engagement.
controls that may be standardized throughout the
enterprise or tailored to the specific circumstances of an application under review. Therefore,
determining the scope of a business application engagement requires consideration of the
context, risks, and engagement objectives, as required by Standard 2220 – Engagement Scope.
Furthermore, Standard 2220.A1 requires the scope of the engagement to consider relevant
systems, among other specific considerations, during an assurance engagement.

Engagement objectives typically drive decisions about which business processes or controls to
include in the scope. An integrated audit of operational and technical controls may be desirable;
however, this guide covers only the assessment of business application controls.

Business Process Scoping Method


The business process scoping method evaluates all the systems that support a particular
business process. The focus of such an engagement would likely be on the applications’
functionalities and their ability to meet business needs. However, based on the engagement risk
assessment, the scope could include other aspects, such as vendor management or identity and
access management. As part of the scoping activity, the internal auditor identifies the input,
processing, and output systems of the process or area under review, including connections to
external systems. Sometimes, especially for complex business applications such as an enterprise
resource planning system, different modules of the same ecosystem can be considered similar
to external input or output applications, particularly for data flow mapping or data processing
reconciliations. Therefore, it may be important to identify the application modules supporting
the business process and the data that flows between them.

Single Application Scoping Method


Single application engagements could comprise an end-to-end view of the application
ecosystem, including technology planning, system development life cycle, production support,
application security, record and information management, vendor management, asset
management, and database administration controls. This approach might be preferred for
business applications that support processes whose operational controls are likely to be covered
in separate engagements, for example, an industrial control systems application.

Single Module Scoping Method


Sometimes, an audit of functionality in a single module, such as the fixed assets module in an
accounting application, may be desired. These engagements are narrow in scope, primarily
focusing on whether business rules are documented and adequately implemented. As such, a
single module engagement would likely focus on application functionality controls and the
working relationship between the benefitting business units, production support, and database
administration teams.

8 — theiia.org
Performing the Engagement

Scoping decisions determine which control types are relevant to the audit. The following
sections describe common risks and controls for each type.

Technology Planning
High-level planning controls enable the service relationship between IT-IS and other business
units and ensure that business applications are compatible with existing and future technologies
in the organization. Collaboration between technology and other business units typically results
in a technology roadmap, which plots the timeline for introducing upgrades or new component
technologies to a business application, together with plans for introducing other technologies in
the enterprise architecture or hosting environment. An assessment of business applications
should consider whether controls are documented and operating adequately to ensure
alignment with and sufficient support of business strategies. An engagement could also
determine whether the organization incorporates new technologies in a deliberate and
coordinated way, for example, as evidenced with technology roadmaps.

• In COBIT 2019 Framework: Governance and Management Objectives, technology planning


controls are primarily described in the Align, Plan, and Organize domain, especially in
objectives:
o APO02 Managed Strategy.
o APO03 Managed Enterprise Architecture.
o APO04 Managed Innovation.

• NIST SP 800-53r5 covers planning processes throughout the following control families:
o Planning.
o Program Management.
o Personally Identifiable Information Processing and Transparency.
o Risk Assessment.
o System and Services Acquisition.
o System and Communications Protection.

• CIS Controls covers technical planning in subcontrols called “safeguards,” specifically:


o 2.2 Ensure Authorized Software is Currently Supported.
o 16.5 Use Up-to-Date and Trusted Third-Party Software Components.

9 — theiia.org
Gathering Requirements and Build vs. Buy
The business owners and benefitting business units are responsible for identifying the need for a
business application, determining the capabilities needed to support business processes, and
selecting an overall approach or solution. IT or IS leaders may also be business owners for
applications that meet their department’s needs, such as supporting an IT service desk or event
log monitoring. Typically, IT leaders help business owners determine whether the organization
should develop the software internally, engage external developers, purchase commercially
available software, or seek vendor-provided solutions. Vendor-provided solutions may be cloud-
based, on-premises, or hybrid hosting models.

If an organization decides to develop software internally, using employees or contractors, IT


leaders typically engage with the benefitting business units to identify how the software needs
to enable the business processes and where controls are needed to enforce business rules and
implement automation. If the organization purchases an off-the-shelf or vendor-provided
solution, the benefitting business unit should verify that the software provides the necessary
capabilities. Otherwise, the business unit may decide to alter processes to match the software’s
functionalities.

• COBIT 2019 Framework: Governance and Management Objectives provides relevant control
guidance for solution identification in the practices:
o EDM02.02 Evaluate Value Optimization.
o APO02.03 Define Target Digital Capabilities.
o APO04.04 Assess the Potential of Emerging Technologies and Innovative Ideas.
o APO08.02 Align I&T Strategy with Business Expectations and Identify Opportunities
for IT to Enhance the Business.

• NIST SP 800-53r5 covers planning processes in these control families:


o Planning, particularly controls PL-7 Concept of Operations and PL-10 Baseline
Selection.
o Program Management, especially PM-7 Enterprise Architecture.

• CIS Controls indirectly addresses technical planning in safeguard 16.11 Leverage Vetted
Modules or Services for Application Security Components, which presumes the organization
has processes to vet technologies for use in its environment.

Security in Design
When planning the system design, security-related attributes to be considered include the
system’s security category, whether and where to deploy encryption, the risks associated with
potential vendors, cybersecurity risks, and more. If the application will be connected to the
internet, the placement and configuration of web application firewalls need to be determined.
Many of these IS controls are covered more extensively in the GTAG “Assessing Cybersecurity
Risk: The Three Lines Model” and other GTAGs.

An internal audit of a business application could determine whether the CISO has assessed the
information security risks and authorized the chosen mitigation approaches in the architecture,

10 — theiia.org
operating systems, application software, and communications technologies for the
application(s) under review. An audit could also verify whether the system architecture and data
flow documentation include IS measures.

• In COBIT 2019 Framework: Governance and Management Objectives, secure design controls
are covered mainly in practices:
o APO01.07 Define Information (Data) and System Ownership.
o BAI03.02 Design Detailed Solution Components.
o BAI08.01 Identify and Classify Sources of Information for Governance and
Management of I&T.
o DSS06.06 Secure Information Assets.

• In NIST SP 800-53r5, relevant controls are primarily found in the following control families:
o Risk Assessment, especially RA-2 Security Categorization.
o System and Services Acquisition, particularly control SA-5 System Documentation.
o System and Communications Protection, especially control SC-3 Security Function
Isolation.

• CIS Controls includes guidance on security in design in safeguards:


o 3.7 Establish and Maintain a Data Classification Scheme.
o 16.10 Apply Secure Design Principles in Application Architectures.

System Development Life Cycle


Application development is characterized as a life cycle because the process is usually circular:
software is planned, developed, tested, and implemented, and then operational feedback is
obtained, which informs further planning and development, and so on. There are many languages
and development methods used to create software programs. The following sections focus on
the generalized objectives and controls in creating integrated applications that meet business
needs. The GTAG “Auditing IT Projects” more extensively covers controls over program and
project management.

Guidance for system development life cycle controls primarily can be found in:

• COBIT 2019 Framework: Governance and Management Objectives in the Build, Acquire and
Implement domain.
• NIST SP 800-53r5 System and Services Acquisition and System and Communications
Protection control families.
• CIS Controls — control 16 Application Software Security.

Software Development
The processes to create a business application include coding and testing to meet business
requirements and integrating with other systems to provide a complete solution. A common
approach is a service management model, where the business owner and other benefitting

11 — theiia.org
business units are the customers and authorizers. In such a model, the IT function performs
client management, systems development, and service delivery functions; and the IS group
reviews security mechanisms in the design, coding, and configuration of solutions.

When an organization develops a business application or has a vendor develop a customized


solution, the IT team typically manages updates in the coding as different releases, also known
as production versions. A version control system may be used to automate the release approval
and implementation workflows and to ensure other documentation controls are enacted. An
assessment of an internally developed application should determine whether controls exist to
ensure that the requirements and approvals for each release have been documented.

Another essential consideration for development includes establishing a separate coding


environment, which should not be directly connected to the production environment. Static and
dynamic code testing tools are often used in a test environment to improve the quality,
efficiency, and security of software code. Developers should not have access to code or systems
that are currently operating because such access could allow them to insert unauthorized code
or security bypass mechanisms or to otherwise subvert the authorized operations of the
application. Restricting developers from testing their own code is part of maintaining a
separation of duties, which is necessary to mitigate the risk of intentional or unintentional
vulnerabilities. Internal audits of business applications should verify whether separate
environments are maintained for developing, testing, and hosting applications and should
determine whether duties have been separated appropriately for the testing of new coding or
releases.

Business applications that are purchased as commercial, off-the-shelf programs or as cloud-


based services (the software as a service, or SaaS, model) may limit the amount of input or
direction the vendor takes from each customer. For example, enterprise resource platforms,
industrial control systems, and other large-scale application platforms may be offered with
automatic version updates; or they may allow the customer to control which version of the
software runs in its environment but provide limited or no access to the application source code.
Therefore, a review of software development risks and controls — on its own or within an audit of
a business application — should consider the extent of the organization’s control over the timing,
quality, and security of the source code. Other guidance more extensively covers the IS controls
that address risks related to purchased applications. These include vulnerability scans and other
preventive and detective controls.

Controls over software development or procurement are described in:

• COBIT 2019 Framework: Governance and Management Objectives in objectives:


o BAI03 Managed Solutions Identification and Build.
o BAI07 Managed IT Change Acceptance and Transitioning.

• NIST SP 800-53r5 control families that cover software development or procurement include:
o System and Services Acquisition, most notably SA-3 System Development Life Cycle
and SA-8 Security and Privacy Engineering Principles.

12 — theiia.org
o System and Communications Protection, especially SC-2 Separation of System and
User Functionality.

• CIS Controls covers software development mainly in safeguard 16.1 Establish and Maintain a
Secure Application Development Process.

Application Functionality Controls


Organizations often manage operational risks using programmed or configurable controls, such
as enabling a three-way match control and acceptable variance tolerances for invoices going
through the accounts payable process. The IIA and others have historically referred to these
types of controls as “application controls.” However, “application functionality controls” is a
more specific term because the control functions are programmed according to the business
owner’s documented requirements, known as business rules. These controls enable business
processes through the validation of input data, separation of business functions, balancing of
processing totals (for example, the count and dollar value of a batch of invoices approved for
cash disbursement), transaction logging, and error reporting. The controls are usually preventive
or detective, but they may also enable forensic analysis.

Types of application functionality controls include:

• Input controls – Used mainly to check the integrity of data entered into a business
application to ensure that it remains within specified parameters, is limited to valid data
types, and is properly authorized.
• Processing controls – Used to ensure processing is complete, accurate, authorized, and
timely.
• Output controls – Used to ensure accuracy and completeness by comparing output results
to inputs and properly recording output data.
• Integrity controls – Used to monitor data in process and at rest to ensure it remains
consistent and persistent.
• Interface controls – Used to ensure proper connections to separate systems that provide
inputs or receive outputs.
• Transaction and event logging – Used to assign unique identifiers (IDs) to transactions and
events to enable forensic investigation and ensure accountability.

In engagements that include a review of application functionality controls, internal auditors


evaluate whether these controls are documented and implemented appropriately due to their
importance to operations. One way to do that is to compare business requirements to the design
and results of user acceptance testing; another is to verify whether management analyzes the
root causes of performance issues and determine whether frequent or high-impact events led to
configuration or code changes.

• In COBIT 2019 Framework: Governance and Management Objectives, controls to ensure


application functionality meets business requirements are covered mainly in practices:
o APO08.04 Coordinate and Communicate.
o BAI03.07 Prepare for Solution Testing.

13 — theiia.org
• NIST SP 800-53r5 guidance mainly focuses on security and privacy, rather than service
management or meeting operational requirements; however, control PL-10 Baseline
Selection establishes a relevant control objective: that system functionality requirements
should be reflected in the control baseline.
• Similarly, CIS Controls primarily focuses on cybersecurity, not service management, so
application functionality guidance is not directly covered.

User Acceptance Testing


In addition to the static and dynamic code testing mentioned previously, the benefitting
business units should test software to ensure application functionality controls meet
documented business rules and that the application interacts with input and output systems as
intended. The business owner may categorize issues identified in user acceptance testing as
either:

1. Needing to be resolved before acceptance.


2. Authorized to be addressed in a subsequent release.

Procured business applications also go through user acceptance testing before being placed into
service for the same reasons as developed software. Identified issues may need to be negotiated
with the vendor to determine whether the delivered program meets contractual terms. Managing
the documentation of requirements and plans for enhancements is an ongoing process for the
benefitting business units and developers, whether in-house or external. An assessment of
business applications may check whether user acceptance tests are designed to verify
compliance with business requirements, whether results are documented, and whether the
issues identified during testing are either resolved to the business owner’s satisfaction or
accepted, usually to be resolved in a subsequent release.

• COBIT 2019 Framework: Governance and Management Objectives describes controls over
user acceptance testing in objective BAI07 Managed IT Change Acceptance and
Transitioning, especially in practices:
o BAI07.01 Establish an Implementation Plan.
o BAI07.05 Perform Acceptance Tests.

• NIST SP 800-53r5 controls related to establishing system requirements, testing, and


acceptance criteria focus on security and privacy rather than functionality objectives; these
are covered primarily in controls:
o SA-4 Acquisition Process.
o SA-11 Developer Testing and Evaluation.

• CIS Controls does not cover user acceptance testing directly.

Release Management and Software Escrow


Code that has been tested and approved for use is compiled into an approved software version,
which should be protected from unauthorized modification. Typically, a version control system is
used to manage this process and enforce security objectives. Approved versions should be

14 — theiia.org
stored off-site with a software escrow service to be used in the event that files or hardware are
damaged or corrupted. An internal audit of business applications could verify whether
management has ever tested the ability to recover operations from an escrowed version of
production software and whether the in-service version has been escrowed.

• COBIT 2019 Framework: Governance and Management Objectives describes controls over
approved versions of software in practices:
o BAI07.06 Promote to Production and Manage Releases.
o APO10.04 Manage Vendor Risk.

• In NIST SP 800-53r5, relevant guidance is found in controls:


o CM-7 Least Functionality.
o SA-10 Developer Configuration Management.
o SC-34 Non-modifiable Executable Programs.

• CIS Controls does not directly address controls over the release or off-site storage of
software versions.

Security in Development
In addition to the security-related steps mentioned previously, a vulnerability scan should be
performed on an application after launching it into the production environment (but before
opening it to full service) to identify configuration or component weaknesses. IT-IS personnel and
the business owner should evaluate the results of the scan to determine whether the residual
risk is acceptable. Other GTAGs will cover controls over vulnerability scanning more extensively.

In a business application ecosystem, vendor-provided software, including firmware, is often


updated to address security flaws in the code or interactions with component technologies in a
new version called a patch. The controls over implementing patches are generally the same as for
other new software versions, except there may be internal deadlines for patches that are not
expected of other updates. The IS team typically has some responsibility for monitoring or
enforcing those expectations.

Patch management controls are covered in:

• COBIT 2019 Framework: Governance and Management Objectives in objectives:


o BAI03 Managed Solutions Identification and Build.
o DSS05 Managed Security Services.

• NIST SP 800-53r5 control SI-2 Flaw Remediation.


• CIS Controls safeguard 7.4 Perform Automated Application Patch Management.

15 — theiia.org
Production Support
Controls to manage an in-service application include several significant IT-IS processes,
including:

• Working with IS to implement encryption, identity, and authentication technologies.


• Establishing system backup and recovery processes.
• Hosting an approved version on a server and putting new versions into service.
• Connecting the application to its databases.
• Connecting the system to internal or external interfaces, including application
programming interface (API) middleware.
• Working with the benefitting business units to establish necessary system roles and
authorization processes.
• Monitoring system performance and responding to errors and outages.

This guide and the GTAG “Auditing Identity and Access Management” cover certain aspects of
identity and access management. This guide also covers other control types, such as
configuration management and system performance monitoring, as they pertain to applications.
Additionally, other GTAGs will detail processes including system hosting, database
administration, middleware management, encryption, and system backup and recovery.

One aspect to consider when scoping a business application engagement is whether the
standardized control processes that apply to other applications in the enterprise have been
applied to the application under review. As stated in Figure 2: Questions to Support Internal
Audit’s Risk Assessment, question 7, due to control inheritance, an audit of a business
application may exclude from its scope any controls effected by standardized processes that are
audited separately. However, during planning, the internal audit team should verify the extent to
which the business application is covered.

Configuration Management
One step in designing a business application is establishing a baseline configuration, which
documents the set of approved component technologies, interface settings, and other controls
that make the application operational. A service management application may help coordinate
and record changes and automatically update the baseline configuration. Configuration changes
may cause or fix processing and output errors and other system performance issues.

An internal audit engagement focused on a particular business application may consider whether
configuration management controls are applied generally, meaning that the application’s
configuration is centrally managed (through an enterprisewide tool, such as a service
management application). If the application’s configuration controls are not integrated and
configuration is managed separately, internal auditors may have an opportunity to consult on
feasible alternatives to strengthen controls by implementing enabling technology. For example,
the configuration management controls of legacy systems and vendor-managed systems may
not be integrated through the enterprisewide tool.

16 — theiia.org
The GTAG “IT Change Management” further describes the controls over configuration
management and changes to in-service systems. Configuration management controls are also
covered in:

• The COBIT 2019 Framework: Governance and Management Objectives, mainly:


o Practice BAI03.05 Build Solutions.
o Objective BAI10 Managed Configuration, primarily practice BAI10.01 Establish and
Maintain a Configuration Model.

• In NIST SP 800-53r5, mainly in the Change Management control family, especially controls:
o CM-2 Baseline Configuration.
o CM-3 Configuration Change Control.

• In CIS Controls, throughout the 12 safeguards in control 4 Secure Configuration of Enterprise


Assets and Software.

User Access Management


The GTAG “Auditing Identity and Access Management” discusses user access management
controls at length, including the idea that if a business application is federated with
standardized tools, then such controls may be excluded from the scope of an application audit.
However, in certain higher-risk applications, internal auditors may desire an analysis of users with
elevated privileges, even in federated applications, to determine whether users’ supervisors are
exercising meaningful, rather than perfunctory, oversight. In the context of a business
application, elevated privileges may mean higher financial approval thresholds or the ability to
unmask protected data. In contrast, a privileged account usually refers to a system
administrator, superuser, or database administrator role.

If a business application is not federated with the human resources information system for user
IDs, then the application’s inherent risk is higher because user access management will have to
rely more heavily on manual processes. Also, if nonemployees, especially individuals not issued a
network ID, have access to a business application, there is a higher inherent risk because the
process for role and employment status updates is probably manual and reliant on vendor
personnel to notify the system administrator timely, which may not always happen. A business
application audit should evaluate controls over nonemployee accounts, which could belong to
contractors or temporary personnel managed by the organization, vendor, partner, or other
individuals not recognized as employees in the human resources database of record.

System roles within business applications may be predefined and unalterable in some off-the-
shelf or vendor-provided software but are more likely to be configurable by administrators to
meet the needs of the benefitting business units. Administrators should document the roles,
related permissions, and intended users based on input from the benefitting business units.
During authorization processes, user supervisors should use this information to guide
authorization decisions.

17 — theiia.org
• COBIT 2019 Framework: Governance and Management Objectives describes user access
management controls in the practice DSS06.03 Manage Roles, Responsibilities, Access
Privileges and Levels of Authority.
• In NIST SP 800-53r5, relevant guidance is found in control families:
o Access Control.
o Identification and Authentication.
o Personnel Security.

• CIS Controls covers similar measures in the following safeguards:


o 4.7 Manage Default Accounts on Enterprise Assets and Software.
o 5.4 Restrict Administrator Privileges to Dedicated Administrator Accounts.
o 6.1 Establish an Access Granting Process.
o 6.2 Establish an Access Revoking Process.
o 6.8 Define and Maintain Role-Based Access Control.

Security in Production
In business applications, one security-related control that is usually configurable is the recording
in log files of transactions and other events, such as the creation of new roles or user accounts or
the initiation and termination of user sessions. The IS and production support teams should work
together to identify what types of events and information should be logged, undertake agreed-
upon solutions, and connect application logs to organizationwide log monitoring tools. Logging
event information provides data for other controls, such as those for monitoring and analyzing
event logs. Such controls will be covered in other GTAGs.

Event logging and log monitoring controls are primarily described in:

• COBIT 2019 Framework: Governance and Management Objectives practices:


o DSS06.05 Ensure Traceability and Accountability for Information Events.
o DSS01.03 Monitor I&T Infrastructure.

• NIST SP 800-53r5 provides excellent guidance for controls over logging in the Audit and
Accountability control family, especially in controls:
o AU-2 Event Logging.
o AU-3 Content of Audit Records.

• CIS Controls primarily covers similar measures in safeguards:


o 8.5 Collect Detailed Audit Logs.
o 8.10 Retain Audit Logs.

18 — theiia.org
Other Relevant Control Types
Other control types that are relevant to, embedded in, or built on business application control
processes include but are not limited to those described below.

Records and Information Management


The organization’s records and information management (RIM) program should recognize the
following items as official records and establish requirements for their retention:

• Application architecture diagrams.


• Data flow diagrams.
• Quality assurance and user acceptance testing routines and results.
• Source code for approved versions.
• Baseline configurations.
• System roles and user account and permissions authorizations.
• Event logs.

A business application engagement should verify whether requirements for retaining the listed
document types are established and whether the necessary documentation for the
application(s) under review is retained properly.

Controls over record retention are mainly described in:

• COBIT 2019 Framework: Governance and Management Objectives in practices:


o BAI08.01 Identify and Classify Sources of Information for Governance and
Management of I&T.
o DSS06.05 Ensure Traceability and Accountability for Information Events.

• NIST SP 800-53r5 in controls:


o SI-12 Information Management and Retention.
o SA-5 System Documentation.

• CIS Controls covers similar guidance in safeguards:


o 3.4 Enforce Data Retention.
o 12.4 Establish and Maintain Architecture Diagram(s).

Vendor Management
Wherever external personnel or entities help develop or support business applications, contracts
and related documents should explain security and performance requirements sufficiently. A
business application engagement should verify whether contracts include service level
agreements and whether ongoing oversight, communication, and remediation processes have
been exercised, as appropriate. The GTAG “Information Technology Outsourcing” describes
controls over vendors in detail.

19 — theiia.org
• COBIT 2019 Framework: Governance and Management Objectives — controls over vendors
are described throughout objectives:
o APO08 Managed Relationships.
o APO09 Managed Service Agreements.
o APO10 Managed Vendors.

• NIST SP 800-53r5 — similar guidance is found in several control families, primarily:


o Program Management, especially control PM-30 Supply Chain Risk Management
Strategy.
o Personnel Security, such as control PS-6 Access Agreements.
o System and Services Acquisition, especially control SA-9 External System Services.
o System and Communications Protection; for example, control SC-8 Transmission
Confidentiality and Integrity.
o Supply Chain Risk Management, especially SR-3 Supply Chain Controls and
Processes.

• CIS Controls — control 15 Service Provider Management offers relevant guidance in several
safeguards, such as 15.2 Establish and Maintain a Service Provider Management Policy.

Asset Management
Maintaining an inventory of business applications with sufficient metadata to support
governance, security, and operational needs is a fundamental enabler of many IT-IS processes. In
the absence of a specifically designated software inventory tool, a service management
application may serve as a de facto inventory because it contains a good amount of
configuration and management details. However, the service management application may not
capture all cloud-based applications or have all the desired metadata. A business application
engagement should determine whether a sufficient software inventory system is in place and
whether the application(s) under review are fully integrated with the inventory system, with all
required data present, accurate, and current.

With vendor-provided applications, the unauthorized use of software licenses or the


underutilization of purchased licenses may also be relevant concerns. An audit test could
reconcile license assignees against the human resources information system to evaluate
compliance with contract terms and cost management objectives. This reconciliation could
determine whether the number of licenses is managed properly, for example, by verifying
whether licenses are sufficiently utilized and only assigned to organization-managed devices or
personnel.

Controls over a system inventory are mainly described in:

• COBIT 2019 Framework: Governance and Management Objectives in the following practices:
o APO09.02 Catalog I&T-enabled Services.
o APO14.03 Establish the Processes and Infrastructure for Metadata Management.
o BAI09.01 Identify and Record Current Assets.

20 — theiia.org
o BAI09.05 Manage Licenses.
o BAI10.05 Verify and Review Integrity of the Configuration Repository.

• NIST SP 800-53r5 controls:


o PM-5 System Inventory.
o CM-8 System Component Inventory.

• CIS Controls safeguards:


o 1.1 Establish and Maintain Detailed Enterprise Asset Inventory.
o 1.4 Use Dynamic Host Configuration Protocol (DHCP) Logging to Update Enterprise
Asset Inventory.
o 1.5 Use a Passive Asset Discovery Tool.

Database Administration and Business Intelligence


Application databases may store confidential information about transactions, customers,
vendors, employees, or other sensitive data types critical to business operations. Many controls
related to configuration management, identity and access management, and backup and
recovery apply at the database layer. Additionally, personnel with database administrator roles
may be in IT or the benefitting business units. Therefore, planning a business application audit
typically includes assessing the design and implementation of the various data management
controls.

Organizationwide processes often manage database administration controls, so a business


application engagement might be primarily concerned with verifying the justifications for
individual and system IDs, including APIs and middleware services, to have access to confidential
records. Assessments may also verify the use of encryption on tables or specific fields or review
who is authorized to view encrypted data in plaintext.

The usage of data, sometimes referred to as


business intelligence, entails creating Standard 2220 – Engagement
standardized and ad hoc reporting capabilities Scope
to support governance, risk management,
monitoring, and other objectives. A business 2220.A2 – If significant consulting
application engagement may determine opportunities arise during an
whether the system(s) under review support assurance engagement, a specific
critical management reporting processes or written understanding as to the
whether other financial or operational metrics objectives, scope, respective
are derived from the application’s database. If responsibilities, and other
so, internal auditors may verify whether expectations should be reached and
reporting processes provide reliable, accurate, the results of the consulting
and timely data. Internal auditors with engagement communicated in
knowledge of advanced data analytics tools or accordance with consulting
techniques may find advisory opportunities
when reviewing the organization’s use of
business intelligence. When such opportunities arise, it may be necessary to formalize an

21 — theiia.org
agreement between the internal audit activity and the engagement client on the nature of
additional consulting services, as recommended in Standard 2220 – Engagement Scope.

The GTAG “Fraud Prevention and Detection in an Automated World more thoroughly covers
controls to detect fraud. A separate GTAG on cybersecurity operations details controls that
monitor cybersecurity, including those that monitor database administration actions.

Controls over database management and business intelligence are primarily covered in:

• COBIT 2019 Framework: Governance and Management Objectives practices:


o APO14.06 Ensure a Data Quality Assessment Approach.
o APO14.08 Manage the Life Cycle of Data Assets.
o MEA01.03 Collect and Process Performance and Conformance Data.
o MEA01.04 Analyze and Report Performance.

• NIST SP 800-53r5 control families:


o Change Management, especially control CM-12 Information Location.
o Program Management, especially control PM-6 Measures of Performance.
o System and Communications Protection, especially control SC-28 Protection of
Information at Rest.
o System and Information Integrity, especially control SI-12 Information Management
and Retention.

• In the CIS Controls similar guidance is mainly found in safeguards:


o 3.3 Configure Data Access Control Lists.
o 3.12 Segment Data Processing and Storage Based on Sensitivity.
o 3.14 Log Sensitive Data Access.

Using Computer-assisted Audit Techniques


Many off-the-shelf applications and tools enable internal auditors to enhance the breadth and
efficiency of the audit process with computer-assisted audit techniques (CAATs). In an
assessment of business applications, CAATs can enable a review of an entire population of
transactions or records in a given period, identify anomalies in user access management, or
perform other possible audit tests. A well-designed and documented engagement supported by
CAATs demonstrates conformance with the following standards:

Standard 1210.A3 – Internal auditors must have sufficient knowledge of key information
technology risks and controls and available technology-based audit techniques to perform
their assigned work. However, not all internal auditors are expected to have the expertise of an
internal auditor whose primary responsibility is information technology auditing. (emphasis
added)

Standard 1220.A2 – In exercising due professional care internal auditors must consider the use of
technology-based audit and other data analysis techniques.

22 — theiia.org
Conclusion
Business application controls cover the full life cycle of the application, from planning and
development to support and management reporting. When considering the risks and scope of an
engagement to audit a business application, it is important to understand how the application
supports business needs and the role of external parties in every control category. This
understanding helps internal auditors provide value-added insight by focusing on the most
significant risks. Given the critical role of applications as enablers of business processes, a risk-
based audit plan should include engagements that evaluate standardized and system-specific
controls to determine whether significant risks are adequately managed.

23 — theiia.org
Appendix A. Related IIA Standards and
Guidance

The following IIA resources were referenced directly or indirectly throughout this practice guide.
For more information about applying the International Standards for the Professional Practice of
Internal Auditing, please refer to The IIA’s Implementation Guides.

Code of Ethics
Principle 1: Integrity

Principle 2: Objectivity

Principle 3: Confidentiality

Principle 4: Competency

Standards
Standard 1200 – Proficiency and Due Professional Care

Standard 1210 – Proficiency

Standard 1220 – Due Professional Care

Standard 2050 – Coordination and Reliance

Standard 2110 – Governance

Standard 2120 – Risk Management

Standard 2130 – Control

Standard 2130 – Control

Standard 2220 – Engagement Scope

Guidance
TAG “IT Essentials for Internal Auditors,” 2020

GTAG “Assessing Cybersecurity Risk: The Three Lines Model,” 2020

GTAG “Auditing IT Projects,” 2009

GTAG “Auditing Identity and Access Management,” 2021

GTAG “IT Change Management,” 2020

GTAG “Information Technology Outsourcing, 2nd Edition,” 2012

GTAG “Fraud Prevention and Detection in an Automated World,” 2009

24 — theiia.org
Appendix B. Glossary

Definitions of terms marked with an asterisk are taken from the “Glossary” of The IIA’s
International Professional Practices Framework®, 2017 edition. Other definitions are either
defined for the purposes of this document or derived from the following sources:

• Internal Auditing: Assurance & Advisory Services, 4th edition,


https://bookstore.theiia.org/internal-auditing-assurance-advisory-services-fourth-edition.
• ISACA, Glossary, accessed August 3, 2021, https://www.isaca.org/resources/glossary.
• NIST SP 800-63-3: Digital Identity Guidelines, Glossary, https://doi.org/10.6028/NIST.SP.800-63-3.
• NIST SP 800-53: Security and Privacy Controls for Information Systems and Organizations,
Revision 5, Glossary, https://doi.org/10.6028/NIST.SP.800-53r5.

Application — A computer program or set of programs that performs the processing of records
for a specific function. Contrasts with systems programs, such as an operating system or
network control program, and with utility programs, such as copy or sort [ISACA Glossary].

application functionality controls — The programmed routines and related parameters that
enable software to execute according to business rules.

application programming interface (API) — A set of routines, protocols and tools referred to as
“building blocks” used in business application software development. A good API makes it
easier to develop a program by providing all the building blocks related to functional
characteristics of an operating system that applications need to specify, for example, when
interfacing with the operating system. A programmer utilizes these APIs in developing
applications that can operate effectively and efficiently on the platform chosen [ISACA
Glossary].

application security — The set of system-specific and inherited IS controls applied to the
development, operation, and usage of an application.

asset management — A set of processes to record, safeguard, and optimize the use of
resources.

assurance services* — An objective examination of evidence for the purpose of providing an


independent assessment on governance, risk management, and control processes for the
organization. Examples may include financial, performance, compliance, system security,
and due diligence engagements.

authentication — Verifying the identity of a user, process, or device, often as a prerequisite to


allowing access to resources in a system [NIST SP 800-53r5 Glossary].

25 — theiia.org
authorization — Access privileges granted to a user, program, or process or the act of granting
those privileges [NIST SP 800-53r5 Glossary].

availability — Ensuring timely and reliable access to and use of information. [NIST SP 800-53r5
Glossary].

baseline configuration — An approved set of components, system settings, and connections to


other systems.

business intelligence — The use of data to present, analyze or predict business activities.

business owner — The leader of the business unit that receives the primary benefit from an IT
resource. The business owner determines business requirements and authorizes acceptance
of the resource. (See also “authorizing official” in NIST SP 800-53r5 Glossary).

business rules — Representations of business processes and constraints that are encoded into
applications to fulfill user requirements.

compliance* — Adherence to policies, plans, procedures, laws, regulations, contracts, or other


requirements.

component technologies — Discrete technology assets that represent a building block of a


system and may include hardware, software, or firmware. (See also “system component” in
NIST SP 800-53r5 Glossary.)
confidentiality [of systems or data] — Preserving authorized restrictions on access and
disclosure, including means for protecting privacy and proprietary information [ISACA
Glossary].

control environment* — The discipline and structure for the achievement of the primary
objectives of the system of internal control. The control environment includes the following
elements:

• Integrity and ethical values.


• Management’s philosophy and operating style.
• Organizational structure.
• Assignment of authority and responsibility.
• Human resource policies and practices.
• Competence of personnel.

control inheritance — A situation in which a system or application receives protection from


security or privacy controls (or portions of controls) that are developed, implemented,
assessed, authorized, and monitored by entities other than those responsible for the
system or application; entities either internal or external to the organization where the
system or application resides. [NIST SP 800-53r5 Glossary].

control processes* — The policies, procedures (both manual and automated), and activities that
are part of a control framework, designed and operated to ensure that risks are contained
within the level that an organization is willing to accept.

26 — theiia.org
customer relationship management — A way to identify, acquire and retain customers. CRM is
also an industry term for software solutions that help an enterprise manage customer
relationships in an organized manner [ISACA Glossary].

database administrator (or administration) — An individual or department responsible for the


security and information classification of the shared data stored on a database system. This
responsibility includes the design, definition and maintenance of the database [ISACA
Glossary].

dynamic code testing — Analysis of software in operation, by using specified test routines and
observing the results.

ecosystem — The hardware, firmware, software and connections that make up a business
application’s environment.

encryption — The process of taking an unencrypted message (plaintext), applying a


mathematical function to it (encryption algorithm with a key) and producing an encrypted
message (ciphertext) [ISACA Glossary].

engagement* — A specific internal audit assignment, task, or review activity, such as an internal
audit, control self-assessment review, fraud examination, or consultancy. An engagement
may include multiple tasks or activities designed to accomplish a specific set of related
objectives.

engagement objectives* — Broad statements developed by internal auditors that define


intended engagement accomplishments.

enterprise resource planning system — A packaged business software system that allows an
enterprise to automate and integrate the majority of its business processes, share common
data and practices across the entire enterprise, and produce and access information in a
real-time environment [ISACA Glossary].

event logging — Chronologically recording system activities, like access attempts, role creation,
user account creation or deactivation, etc. (See also “audit log” in NIST SP 800-53r5
Glossary.)

federated — integrated with an identity and authentication information process across a set of
networked systems [Adapted from “federation” in NIST SP 800-63-3 Glossary].

firewall — A system or combination of systems that enforces a boundary between two or more
networks, typically forming a barrier between a secure and an open environment such as
the internet [ISACA Glossary].

firmware — Computer programs and data stored in hardware — typically in read-only memory or
programmable read-only memory — such that the programs and data cannot be
dynamically written or modified during execution of the programs [NIST SP 800-53r5
Glossary].

framework — A body of guiding principles that form a template against which organizations can
evaluate a multitude of business practices. These principles are comprised of various
concepts, values, assumptions, and practices intended to provide a yardstick against which
an organization can assess or evaluate a particular structure, process, or environment or a

27 — theiia.org
group of practices or procedures. [Internal Auditing: Assurance & Advisory Services, 4th
edition]

fraud* — Any illegal act characterized by deceit, concealment, or violation of trust. These acts
are not dependent upon the threat of violence or physical force. Frauds are perpetrated by
parties and organizations to obtain money, property, or services; to avoid payment or loss
of services; or to secure personal or business advantage.

governance* — The combination of processes and structures implemented by the board to


inform, direct, manage, and monitor the activities of the organization toward the
achievement of its objectives.

hosting — Providing the physical and logical infrastructure to run software applications that have
distributed users.

identifier — Unique data used to represent a person’s identity and associated attributes. A name
or a card number are examples of identifiers. A unique label used by a system to indicate a
specific entity, object, or group [NIST SP 800-53r5 Glossary].

industrial control system — General term that encompasses several types of control systems,
including supervisory control and data acquisition systems, distributed control systems,
and other control system configurations such as programmable logic controllers found in
the industrial sectors and critical infrastructures. An industrial control system consists of
combinations of control components (like electrical, mechanical, hydraulic, and pneumatic)
that act together to achieve an industrial objective (such as manufacturing, or the
transportation of matter or energy) [NIST SP 800-53r5 Glossary].

information technology controls* — Controls that support business management and


governance as well as provide general and technical controls over information technology
infrastructures such as applications, information, infrastructure, and people.

information technology governance* — Consists of the leadership, organizational structures,


and processes that ensure that the enterprise’s information technology supports the
organization’s strategies and objectives.

inherent risk — The combination of internal and external risk factors in their pure, uncontrolled
state, or, the gross risk that exists, assuming there are no internal controls in place [Internal
Auditing: Assurance & Advisory Services, 4th ed.]
integrity [of systems or data] — The guarding against improper information modification or
destruction, and includes ensuring information nonrepudiation and authenticity [ISACA
Glossary].

interface — Common boundary between independent systems or modules where interactions


take place [NIST SP 800-53r5 Glossary].

internal audit activity* — A department, division, team of consultants, or other practitioner(s)


that provides independent, objective assurance and consulting services designed to add
value and improve an organization’s operations. The internal audit activity helps an
organization accomplish its objectives by bringing a systematic, disciplined approach to

28 — theiia.org
evaluate and improve the effectiveness of governance, risk management and control
processes.

log monitoring — Using specialized software to scan event logs for patterns or anomalies that
may indicate unauthorized accounts, access or activities.

metadata — Information that describes the characteristics of data, including data format,
syntax, semantics, and contents [NIST SP 800-53r5 Glossary].

middleware — Another term for an API, it refers to the interfaces that allow programmers to
access lower- or higher-level services by providing an intermediary layer that includes
function calls to the services [ISACA Glossary].

patch — Fixes to software programming errors and vulnerabilities [ISACA Glossary].

persistent — A characteristic of stored data that keeps it the same, enabling later retrieval.

plaintext — Digital information, such as cleartext, that is intelligible to the reader [ISACA
Glossary].

point-of-sale system — Enables the capture of data at the time and place of transaction; such
terminals may include use of optical scanners for use with bar codes or magnetic card
readers for use with credit cards. Point-of-sale systems may be connected online to a
central computer, or used as stand-alone terminals that hold the transactions until the end
of a specified period, then sending data to the main computer for batch processing
[adapted from ISACA Glossary].

privacy — The rights of an individual to trust that others will appropriately and respectfully use,
store, share, and dispose of his or her associated personal and sensitive information within
the context, and according to the purposes, for which it was collected or derived. Scope
notes: What is appropriate depends on the associated circumstances, laws, and the
individual’s reasonable expectations. An individual also has the right to reasonably control
and be aware of the collection, use, and disclosure of his or her associated personal and
sensitive information [adapted from ISACA Glossary].

privileged account — A system account with the authorizations of a privileged user [NIST SP
800-53r5 Glossary].
privileged user — A user that is authorized (and therefore, trusted) to perform security-relevant
functions that ordinary users are not authorized to perform [NIST SP 800-53r5 Glossary].

production support — Processes to configure, administer and troubleshoot applications. (See


also “IT service,” ISACA Glossary).

records and information management — An enterprisewide program to identify official record


types and their storage locations, and establish retention and destruction requirements.

residual risk — The portion of inherent risk that remains after management executes its risk
responses (sometimes referred to as net risk) [Internal Auditing: Assurance & Advisory
Services, 4th ed.].
risk* — The possibility of an event occurring that will have an impact on the achievement of
objectives. Risk is measured in terms of impact and likelihood.

29 — theiia.org
risk management* — A process to identify, assess, manage, and control potential events or
situations to provide reasonable assurance regarding the achievement of the organization’s
objectives.

security category — The characterization of information or an information system based on an


assessment of the potential impact that a loss of confidentiality, integrity, or availability of
such information or information system would have [excerpted from NIST SP 800-53r5
Glossary].

separation of duties — A basic internal control that prevents or detects errors and irregularities
by assigning to separate individuals the responsibility for initiating and recording
transactions and for the custody of assets [adapted from “segregation/separation of
duties,” ISACA Glossary].

shadow IT — Personnel or resources performing an IT function outside of the IT management


hierarchy.

source code — The language in which a program is written. Source code is translated into object
code by assemblers and compilers [adapted from ISACA Glossary].

Standard* — A professional pronouncement promulgated by the International Internal Audit


Standards Board that delineates the requirements for performing a broad range of internal
audit activities and for evaluating internal audit performance.

static code testing — An automated analysis of code, usually in the development environment,
to detect potential errors, vulnerabilities, or inefficient coding.

superuser — A type of system administrator role that has all permissions, including root access
to the operating system.

system administrators — Personnel authorized to configure and support the operation of an IT


resource.

system development life cycle (SDLC) — The phases deployed in the development or
acquisition of a software system. Typical phases of SDLC include the feasibility study,
requirements study, requirements definition, detailed design, programming, testing,
installation and post-implementation review, but not the service delivery or benefits
realization activities [adapted from ISACA Glossary].

system roles — Sets of permissions within an application that typically correspond to job
functions.

technology planning — Activities to align IT-IS resources with business needs, ensuring
objectives of confidentiality, integrity, availability, privacy, and security are met. (See also
ISACA’s definition for “strategic planning,” and NIST SP 800-53r5’s definition of “enterprise
architecture).

technology roadmap — A plan for a business application’s version and component updates,
aligned with the enterprise architecture plan. (See also ISACA’s definitions for “IT strategic
plan” and “IT tactical plan”).

30 — theiia.org
technology-based audit techniques* — Any automated audit tool, such as generalized audit
software, test data generators, computerized audit programs, specialized audit utilities, and
computer-assisted audit techniques (CAATs).

user acceptance testing — A phase of the SDLC where application users run a series of tests to
verify whether the solution meets the business requirements.

vendor management — A set of processes to procure goods and services, ensure acceptable
delivery or performance, and resolve disputes.

version control system — An application used in SDLC to manage changes to the source code
and facilitate approvals to promote code from the development environment to the test
environment, and then to the production environment.

vulnerability scan — Automated routine to detect known weaknesses in software code or


configurations. The vulnerabilities may be assigned a score to facilitate prioritization of
resolution efforts.

web application firewall — A firewall placed between the internet and an application server to
filter traffic and prevent various types of cyberattacks.

31 — theiia.org
Appendix C. References

References
Anderson, Urton L., Michael J. Head, Sridhar Ramamoorti, Cris Riddle, Mark Salamasick, and Paul
J. Sobel. Internal Auditing: Assurance & Advisory Services, 4th edition. Lake Mary, FL: The
Internal Audit Foundation, 2017.

Association of International Certified Professional Accountants. “TSP Section 100 2017 Trust
Services Criteria for Security, Availability, Processing Integrity, Confidentiality, and Privacy,”
March 2020.
https://www.aicpa.org/content/dam/aicpa/interestareas/frc/assuranceadvisoryservices/d
ownloadabledocuments/trust-services-criteria.pdf..

Center for Internet Security. “The 18 CIS Controls,” interactive guide to CIS Controls, Version 8.
Accessed August 13, 2021, https://www.cisecurity.org/controls/cis-controls-list/.

Grassi, Paul A., Michael E. Garcia, and James L. Fenton. NIST SP 800-63-3: Digital Identity
Guidelines. Gaithersburg, MD: NIST, June 2017. https://doi.org/10.6028/NIST.SP.800-63-3.
ISACA. Control Objectives for Information Technologies (COBIT) 2019. Online framework and
guidance. https://www.isaca.org/resources/cobit.

ISACA. Glossary. Information technology terms and definitions. Accessed July 15, 2021,
https://www.isaca.org/resources/glossary.

Joint Task Force. NIST SP 800-53: Security and Privacy Controls for Information Systems and
Organizations, Revision 5. Gaithersburg, MD: NIST, September 2020.
https://doi.org/10.6028/NIST.SP.800-53r5.

The Institute of Internal Auditors. International Professional Practices Framework. 2017 ed. Lake
Mary, Florida: The Institute of Internal Auditors, 2017.

32 — theiia.org
Acknowledgements
IT Guidance Development Team
Susan Haseley, CIA, United States (Chairman)

Justin Pawlowski, CIA, CRMA, Germany (Team Lead)

Brad Ames, CISA, CPA, United States

Jim Enstrom, CIA, United States

Ruth Mueni Kioko, CIA, Kenya

Mike Lynn, CIA, CRMA, United States

Scott Moore, CIA, United States

Sajay Rai, CISM, CISSP, CISM, United States

Manoj Satnaliwala, CIA, CPA, CISA, United States

Terence Washington, CIA, CRMA, United States

IIA Global Standards and Guidance


David Petrisky, CIA, CRMA, CISA, CPA, Director, (Project Lead)

Dr. Lily Bi, CIA, QIAL, CRMA, CISA, Executive Vice President

Anne Mercer, CIA, CFSA, CFE, Senior Director

Pam Stroebel Powers, CIA, CRMA, CPA, Director

Daniel Walker, CIA, CISA, CISSP, CPA, Director

Shelli Browning, Manager

Lauressa Nelson, Senior Editor

Christine Janesko, Content Writer and Technical Editor

The IIA thanks the following oversight bodies for their support: Information Technology Guidance
Committee, Professional Guidance Advisory Council, International Internal Audit Standards
Board, and the International Professional Practices Framework Oversight Council.

33 — theiia.org
About The IIA
The Institute of Internal Auditors (IIA) is the internal audit profession’s most widely recognized advocate, educator, and provider of standards,
guidance, and certifications. Established in 1941, The IIA today serves 200,000 members from nearly 200 countries and territories. The
association’s global headquarters are in Lake Mary, Fla., USA. For more information, visit www.theiia.org.
Disclaimer
The IIA publishes this document for informational and educational purposes. This material is not intended to provide definitive answers to specific
individual circumstances and as such is only intended to be used as a guide. The IIA recommends seeking independent expert advice relating directly to any
specific situation. The IIA accepts no responsibility for anyone placing sole reliance on this material.

Copyright
Copyright © 2021 The Institute of Internal Auditors, Inc. All rights reserved. For permission to reproduce, please contact [email protected].

First editions, “Auditing Application Controls,” published 2009, and “Auditing User-developed Applications,” published 2010

Second edition September 2021

Note: The cover, logo, and certain references were updated November 2021. There were no changes to the original content. Questions may be directed to
[email protected].

34 — theiia.org