PROGRESS REPORT SUMMARY REPAIR Update 21/07/2023
CONVERSION PRIMA NUSANTARA
Start Contract 13/12/2022 Akumulasi Hari Kerja 150 Realisasi
Total Contract Deadline 11/05/2023 Sisa Hari dari Deadline -71 Delivery
Start Docking 25/12/2022 Durasi Docking Realisasi 209 Docking 25/12/2022
Undocking Deadline 24/05/2023 Sisa Durasi Docking -58 Undocking
ITEM PROGRESS PROYEK Sub Total Done WIP Cancel Not Yet % Kini % Lalu
TOTAL ITEM
Item Kerja Original Ori 442 162 54 0 226 42.8% 39.8%
Item Kerja Additional Add 122 53 22 1 46 53.3% 53.3%
Total Item Kerja 564 215 76 1 272 45.0% 42.7%
ITEM PROGRESS UNDER WATER Sub Total Done WIP Cancel Not Yet % Kini % Lalu
UNDOCKING
Underwater Item Original Ori 0 0 0 0 0 0.0% 0.0%
Underwater Item Additional Add 0 0 0 0 0 0.0% 0.0%
Total Item Kerja Under Water 0 0 0 0 0 0.0% 0.0%
DETAIL ITEM PEKERJAAN PER DEPARTEMEN & PIC
No Departemen / PIC Deadline Sub Total Done WIP Cancel Not Yet Progress
Progress Kini
Lalu
A. General 7/31/2023 33 0 0 0 33 0.0% 0.0%
B. Hull
condro 7/31/2023 10 9 0 1 0 100.0% 100.0%
PJMS 7/31/2023 72 47 11 0 14 72.9% 72.9%
Kahono 3/19/2023 1 1 0 0 0 100.0% 100.0%
BLJ 7/31/2023 9 9 0 0 0 100.0% 100.0%
GTM 3/19/2023 1 1 0 0 0 100.0% 100.0%
MKB 7/31/2023 6 0 6 0 0 50.0% 50.0%
C. Outfitting
Andi Daeng 3/19/2023 15 15 0 0 0 100.0% 100.0%
Bambang S 7/31/2023 106 20 17 0 69 26.9% 14.5%
MKB 7/31/2023 4 0 0 0 4 0.0% 0.0%
D. Piping
Erizon 7/31/2023 30 12 7 0 11 51.7% 51.7%
Masri 7/31/2023 28 18 8 0 2 78.6% 78.6%
E. Mechanic
Dodi 7/31/2023 44 10 10 0 24 34.1% 33.0%
F. Electric
Hazky 7/31/2023 90 1 10 0 79 6.7% 6.7%
CODE DESCRIPTION OF WORK Ori/Add Group PIC
CONVERSION PRIMA NUSANTARA
STEEL WORK
S001 FABRICATE AND INSTALL MAIN CABLE TANK CAP. 2900 TON
1 To remove wooden deck at maindeck all. Total area 61661 mm x 16798 mm Ori Outfitting Andi Daeng
2 To cut deck plate iwo Fr. 41/42 - 86/87 (PLAN). Size 27000 mm x 4990 mm x 10 mm Ori Hull PJMS
3 Remove Dry Bulk Tk. No. 1, No.2, no.3, no.4, and no.5 Ori Hull Condro
1 Fabricate and install Main Cable Tank as drawing included with scantling structure. Dia 16.8 m
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
2 To crop and renewed maindeck plate iwo Fr. 46/47 - 78/79. Size 18430mm x 8100 mm x 20 mm
Crop Ori Hull PJMS
Renewed Ori Hull BLJ
3 To fabricate and install new section Fr. 51,54,57,60,63,66,69,72,75 as drawing (DB and Main deck)
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
4 To fabricate and install new long section (STBD) 600 mm of CL iwo Fr.42 - 80 as drawing
Fabrikasi Ori Hull BLJ
Install Ori Hull BLJ
5 To fabricate and install new long section (PS) 1200 mm of CL iwo Fr.48 - 80 as drawing
Fabrikasi Ori Hull BLJ
Install Ori Hull BLJ
6 To fabricate and install new long section (PS) 1400 mm of CL iwo Fr.42 - 80 as drawing. STBD Similar
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
7 To fabricate and install new long section (PS) 2050 mm of CL, Fr. 48 - 78 as drawing. STBD Similar
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
8 To fabricate and install new long section (PS) 2550 mm of CL, Fr. 48 - 78 as drawing. STBD Similar
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
9 To fabricate and install new combined long section (PS) 3000 mm of CL, Fr. 50 - 76 as drawing. STBD Similar
Fabrikasi Ori Hull BLJ
Install Ori Hull BLJ
10 To fabricate and install new long section (PS) 4800 mm of CL, Fr. 50 - 76 as drawing. STBD Similar
Fabrikasi Ori Hull BLJ
Install Ori Hull BLJ
11 To fabricate and install new long section (PS) 5400 mm of CL, Fr. 48 - 77 as drawing. STBD Similar
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
12 To fabricate and install new long section (PS) 6600 mm of CL, Fr. 54 - 73 as drawing. STBD Similar
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
13 To fabricate and install new long section (PS) 8400 mm of CL, Fr. 57 - 69 as drawing. STBD Similar
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
14 To crop and renewed second deck plate iwo Fr. 41/42 - 49/750 with angle bar & checker plate as drawing
Crop Ori Hull Condro
Renewed Ori Hull GTM
15 To crop and renewed second deck plate iwo Fr. 76/77 - 87/88 with angle bar & checker plate as drawing
Crop Ori Hull PJMS
Renewed Ori Hull PJMS
16 To crop and renewed tank top plate iwo Fr. 47/48 - 77/78. Size 18600 x 5400 x 14 mm
Crop Ori Hull PJMS
Renewed Ori Hull PJMS
17 To carried out leaking test at deck plate and BHD Ori Hull PJMS
18 To carried out NDT at deck plat and BHD Ori Hull PJMS
19 Cleaning and Fre gas DB TK 2 PS & STBD and DB 3 PS & STBD Ori Cleaning Saiful
20 Cleaning and Free Liquid Mud TK 2 PS & STBD Ori Cleaning Saiful
21 Comperdam TK 1 P/S Ori Cleaning Saiful
22 LM Methanol TK 3 P/S Ori Cleaning Saiful
Access Work :
1 Tent cover fro deck opening iwo Fr.47-79 Ori Outfitting Andi Daeng
2 Safety railing Ori Outfitting Andi Daeng
3 Access crane to remove dry bulk. Est weight/each +/- 8 ton Ori Outfitting Andi Daeng
4 To remove wooden deck at maindeck all. Total area 61661 mm x 16798 mm Ori Outfitting Andi Daeng
5 Remove Dry Bulk Tk. No. 1, No.2, no.3, no.4, and no.5 Ori Hull Condro
6 To cut Long. BHD PS & STBD included stiffener iwo Fr.50 - 76 Ori Hull PJMS
7 Relocated all cable at Long BHD PS & STBD then reposition back Ori Electric Hazky
8 Remove all exixting piping, pump, and electrical panel for mud tank Ori Piping Erizon
9 Cleaning and free gas DB Tk. 2 PS & STBD and DB Tk. 3 PS & STBD Ori Cleaning Saiful
10 Cleaning and gas free Liquid Mud Tk. 2 PS &STBD, Cofferdam Tk. 1 PS & STBD, LM/Methanol Tk. 3 PS & STBD Ori Cleaning Saiful
11 Staging as per location Ori Scaffolding Rahmadoni
S002 FABRICATE AND INSTALL SPARE CABLE TANK, CAP. 2 x 120 TON
1 Install structure for strengtening main cable tank as drawing Ori Hull PJMS
1 Fabricate Spare Tank as drawing. Dia. 4314 mm x 7400 mm x 2 tank Ori Hull PJMS
2 To cut and refit back maindeck plate iwo Fr. 78/79 - 86/87 PS & STBD. Size Dia. 5000 x 5400 x 9 mm
Cutting Ori Hull PJMS
Refit Ori Hull PJMS
3 To fabricate second deck iwo Fr. 78/79 - 86/87 PS & STBD with profile and grating plate. Ori Hull PJMS
4 To cut and renewed tank top plate iwo Fr.77/78 - 96/97. Size 10800 x 5500 x 14 mm (PS & STBD)
Cutting Ori Hull PJMS
Renewed Ori Hull PJMS
5 To install new inner bottom long. Iwo Fr 77/78 - 96/97. 8 unit each PS and STBD Ori Hull PJMS
6 To fabricate and install inner bottom side long. PS & STBD Iwo Fr 77/78 - 96/97 as drawing
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
7 To fabricate and install new brackets iwo inner bottom long PS & STBD iwo Fr. 78 - 96 as drawing
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
8 To fabricate and install new floor in DB iwo Fr.81, 84,87,90,93
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
9 To carried out leaking test at deck plate and BHD Ori Hull PJMS
10 To carried out NDT at deck plat and BHD Ori Hull PJMS
11 Cleaning and Free Liquid Mud TK 1 PS & STBD Ori Cleaning Saiful
12 Cleaning and Fre gas TK 1 PS & STBD Ori Cleaning Saiful
Access Work :
1 Tent cover fro deck opening iwo Fr. 78/79 - 86/87 PS & STBD Ori Outfitting Andi Daeng
2 Safety railing Ori Outfitting Andi Daeng
3 Cleaning and free gas Liquid Mud Tank 1 PS & STBD Ori Cleaning Saiful
4 Cleaning and free gas DB Tk. 1 PS & STBD Ori Cleaning Saiful
5 Staging as per location Ori Scaffolding Rahmadoni
S003 REMOVED CARGO RAIL STRUCTURE P/S & FABRICATE AND INSTALL ROPE TANK - 3 UNIT Ori
1 To remove cargo rail structure PS & STBD Ori Outfitting Andi Daeng
1 Fabricate Rope Tank as drawing. Dia. 3175 mm x 4700 mm x 3 tank Ori Hull PJMS
2 To cut and refit back maindeck plate iwo Fr. 80 - 85/86 Center. Size 3500 x 9 mm
Cutting Ori Hull PJMS
Refit Ori Hull PJMS
3 To cut and refit back maindeck plate iwo Fr. 87/88 - 92/93 PS & STBD. Size 3500 x 9 mm - 2 sheet
Cutting Ori Hull PJMS
Refit Ori Hull PJMS
4 To fabricate second deck iwo Fr. 78/79 - 86/87 PS & STBD with profile and grating plate. Ori Hull PJMS
5 To fabricate second deckiwo Fr. 87/88 - 92/93 PS & STBD with profile and grating plate. Ori Hull PJMS
6 To carried out leaking test at deck plate Ori Hull PJMS
7 To carried out NDT at deck plat Ori Hull PJMS
8 Cleaning Liquid Mud Tk.1 PS & STBD Ori Cleaning Saiful
9 Cleaning and free gas DB Tk. 1 PS & STBD Ori Cleaning Saiful
Access Work :
1 Tent cover fro deck opening iwo Fr. 90 - 92/93 Center & PS & STBD Ori Outfitting Andi Daeng
2 Safety railing Ori Outfitting Andi Daeng
3 Cleaning and free gas Liquid Mud Tk.1 PS & STBD Ori Cleaning Saiful
4 Cleaning and free gas DB Tk. 1 PS & STBD Ori Cleaning Saiful
5 Staging as per location Ori Scaffolding Rahmadoni
S004 REMOVED BULWARK STRUCTURE PS & SUPERSTRUCTURE DECKHOUSE
1 To remove bulwark include stay brackets PS & STBD Ori Outfitting Andi Daeng
1 To fabricate and install new deckhouse superstructure as drawing, with include room in below :
a Workshop no.39 refer in GA (Blok 1) Ori Hull PJMS
b Jointing room (Blok 2) Ori Hull PJMS
c Testing room + dark room (Blok 3) Ori Hull PJMS
d LCE + CDE Control Room (Blok 5) Ori Hull MKB
e CO2 room Ori Hull PJMS
f HPU Equipment room Ori Hull PJMS
g Cable Entry door PS & STBD (Blok 2) Ori Hull PJMS
h Mech Workshop (Blok 4) Ori Hull MKB
i Stores (Blok 5) Ori Hull MKB
j Cable Engg./Survey room (Blok 4) Ori Hull MKB
k HVAC Equipemnt room Ori Hull PJMS
l Workshop spares Ori Hull PJMS
m Transformer room (Blok 1) Ori Hull PJMS
n Hyd. Power Station (Blok 3) Ori Hull PJMS
Access Work :
1 Shifted Air Vent Head Ballast Tank Ori Piping Erizon
2 Removed Tugger Winch PS & STBD Ori Mechanic Dodi
3 Shifted emergency hatch azimuth thruster room Ori Mechanic Dodi
4 Removed Rescue Boat+Crane Ori Mechanic Dodi
5 Removed Provision Crane Pedestal and unit Ori Mechanic Dodi
6 To cut Cargo Rail PS & STBD Ori Outfitting Andi Daeng
7 To remove bulwark include stay brackets PS & STBD Ori Outfitting Andi Daeng
8 To remove locking plate for wooden deck Ori Outfitting Andi Daeng
9 Staging as per location Ori Scaffolding Rahmadoni
S005 REMOVED LOCKING PLATE FOR WOODEN DECK & CRANE PEDESTAL AND BOOM REST
1 To remove locking plate for wooden deck Ori Outfitting Andi Daeng
1 To fabricate and install Crane Pedestal as drawing (Roll Plate)
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
2 To fabricate and install Boom Rest Foundation as drawing
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
3 To fabricate new strengtening structure and install as drawing Ori Hull PJMS
4 Cleaning and free gas DB Tk. 7 PS Ori Cleaning Saiful
Access Work :
1 Cleaning and free gas DB Tk. 7 PS Ori Cleaning Saiful
2 Staging as per location Ori Scaffolding Rahmadoni
S006 REMOVE AND RELOCATED TUGGER WINCH PS & WHISKER STRUCTURE
1 To remove tugger winch PS & STBD Ori Mechanic Dodi
2 To removed electrical and hydraulic system Ori Mechanic Dodi
1 To fabricate and install whisker structure as drawing
Fabrikasi Ori Hull MKB
Install Ori Hull MKB
2 Cleaning and free gas DB Tk. 7 PS & STBD and Void Tank no.3 Ori Cleaning Saiful
Access Work :
1 Cleaning and free gas DB Tk. 7 PS & STBD and Void Tank no.3 Ori Cleaning Saiful
2 Staging as per location Ori Scaffolding Rahmadoni
S007 REMOVE AND RELOCATED RESCUE BOAT,CRANE & PLOUGH A-FRAME
1 To removed rescue boat include crane (electrical & hydraulic system) Ori Mechanic Dodi
1 To fabricate and install Plough A-Frame Foundation as drawing
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
Access Work :
1 Acces crane cap. 50 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
S008 REMOVE AND RELOCATED PROVISION CRANE & PLOUGH UNIT
1 To removed provision crane (electrical & hydraulic system) Ori Mechanic Dodi
1 To fabricate and install Plough Platform Foundation as drawing
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
Access Work :
1 Acces crane cap. 50 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
S009 REMOVING OBSTACLE FOR MAIN CABLE TANK SURVEY & TUUGER WINCH
1 To remove piping system for Mud Tank and Dry Bulk Tank as instruction Ori Piping Erizon
2 To remove Mud pump include piping system iwo dry bulk tank as instruction Ori Mechanic Dodi
3 To remove panel electrical box for mud pump include electrical system as instruction Ori Electric Hazky
4 To cable for mud piping system as instruction iwo dry bulk tank Ori Electric Hazky
To remove valve for mud piping system as instruction iwo dry bulk tank Ori Piping Erizon
5 To removed and relocated lighting & cable iwo dry bulk tank as instruction Ori Electric Hazky
6 To removed Compressor & system PS & STBD iwo Fr.36 - 42 Ori Mechanic Dodi
7 Remove Mud Agitator Panel Fr. 50-51 STBD Ori Electric Hazky
1 To install existing tugger winch foundation as drawing location Ori Hull PJMS
2 To fabricate and install new strengtening structure for tugger winch PS & STBD
Fabrikasi Ori Hull PJMS
Install Ori Hull PJMS
3 Free gas and cleaning FO tk. No.3 PS & STBD Ori Cleaning Saiful
Access Work :
1 Acces crane cap. 10 Ton Ori General Edyansah
2 Free gas and cleaning FO tk. No.3 PS & STBD Ori Cleaning Saiful
S010 JETTING UMBILICAL WINCH
1 To fabricate and install jetting umbilical winch foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
Access Work :
1 Acces crane cap. 50 Ton Ori General Edyansah
S011 DIVERTER SHEAVE
1 To fabricate and install foundation diverter sheave as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
Access Work :
1 Acces crane cap. 5 Ton Ori General Edyansah
S012 PLOUGH UMBILICAL WINCH
1 To fabricate and install umbilical winch foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S013 CABLE STOPPER
1 To fabricate and install umbilical winch foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
3 Install Umbilical winch as owner instruction. Material supply by Owner Ori Mechanic Dodi
Access Work :
1 Acces crane cap. 5 Ton Ori General Edyansah
S014 LCE FOUNDATION
1 To fabricate and install LCE foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
3 Install LCE Machine Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S015 DIVERTER FOUNDATION
1 To fabricate and install Diverter foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
3 Install Diverter Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
Access Work :
1 Acces crane cap. 10 Ton Ori General Edyansah
S016 CDE FOUNDATION
1 To fabricate and install CDE foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
3 Install CDE Machine Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S017 DOHB FOUNDATION
1 To fabricate and install DOHB foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
3 Install DOHB Machine Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
4 Install Cable Ladder DOHB Ori Electric Hazky
5 Wiring & Connection Cable DOHB Ori Electric Hazky
6 Install & Connection Lighting DOHB Ori Electric Hazky
7 Fab & Install Piping DOHB Ori Piping Erizon
8 Test Piping DOHB Ori Piping Erizon
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S018 LCE/CDE CONTROL ROOM
1 To fabricate and install Control Unit LCE and CDE foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
3 Install LCE & CDE Control as owner instruction. Material supply by Owner Ori Electric Hazky
4 Install Cable Ladder LCE & CDE Control Ori Electric Hazky
5 Wiring & Connection Cable LCE & CDE Control Ori Electric Hazky
6 Install & Connection Lighting LCE & CDE Control Ori Electric Hazky
7 Install Linning LCE & CDE Control Ori Carpenter Ajmain
8 Install Ceilling LCE & CDE Control Ori Carpenter Ajmain
9 Install Deck Covering LCE & CDE Control Ori Carpenter Ajmain
10 Install Furniture LCE & CDE Control Ori Carpenter Ajmain
11 Install Curtain LCE & CDE Control Ori Carpenter Ajmain
12 Fab & Install Piping LCE & CDE Control Ori Piping Erizon
13 Test Piping LCE & CDE Control Ori Piping Erizon
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S019 HPU CABLE ENGINE
1 To crop and refit back main deck iwo Fr.31/32 - 43/44. Size 8500 x 4150 x 9 mm Ori Outfitting Bambang S
2 To Fabricate HPU cable Engine Foundation as drawing Ori Outfitting Bambang S
3 To fabricate and install new strengtening structure as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
4 Install HPU unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
5 Fabricate step ladder to access inside Mud Tk.no.4 STBD as drawing Ori Outfitting Bambang S
6 Fabricate watertight door to access inside Mud Tk.no.4 STBD as drawing Ori Outfitting Bambang S
7 Free gas and Cleaning Mud Tank no.4 STBD Ori Cleaning Saiful
8 Free gas and Clening DB Tk. No 4 STBD Ori Cleaning saiful
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
2 Free gas and Cleaning Mud Tank no.4 STBD Ori Cleaning Saiful
3 Free gas and Clening DB Tk. No 4 STBD Ori Cleaning saiful
S020 CABLE TRACKWAY FOUNDATION
1 To fabricate and install cable trackway foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S021 OVERHEAD HOIST CRANE
1 To fabricate and install H-beam for trackway and support for Hoist Crane as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To install hoist electrical crane as owner instruction. Material supply by Owner Ori Electric Hazky
Access Work :
1 Acces crane cap. 10 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
S022 CABLE MARKER BOUY
1 To fabricate and install Cable Marker Bouy Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 To install Cable marker bouy accessoris (chain, locking, shackle, etc) Ori Outfitting Bambang S
3 To sitting cable marker bouy in foundation Ori Outfitting Bambang S
Access Work :
1 Acces crane cap. 10 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
S023 PLOUGH/A-FRAME WORKSHOP
1 To install U-frame Socket for locking container. Material Supply by owner Ori Electric Hazky
2 To install Container workshop to onboard Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S024 HPU PLOUGH A-FRAME
1 To fabricate and install HPU Plough A-frame Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install Plough A-Frame HPU as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S025 PLOUGH/AFRAME CONTROL CABIN
1 To fabricate and install Plough/A-frame Control Room Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install Plough/A-frame Control Room as owner/maker instruction. Material supply by Owner Ori Electric Hazky
3 Install Cable Ladder Plough/A-frame Control Room Ori Mechanic Dodi
4 Wiring & Connection Cable Plough/A-frame Control Room Ori Electric Hazky
5 Install & Connection Lighting Plough/A-frame Control Room Ori Electric Hazky
6 Install Linning Plough/A-frame Control Room Ori Electric Hazky
7 Install Ceilling Plough/A-frame Control Room Ori Carpenter Ajmain
8 Install Deck Covering Plough/A-frame Control Room Ori Carpenter Ajmain
9 Install Furniture Plough/A-frame Control Room Ori Carpenter Ajmain
10 Install Curtain Plough/A-frame Control Room Ori Carpenter Ajmain
Access Work : Ori Carpenter Ajmain
1 Acces crane cap. 30 Ton Ori General Edyansah
S026 TOWING WINCH
1 To fabricate and install Towing Winch Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install Towing Winch as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 To Fabricate roller and foundation for wire towing winch as drawing Ori Outfitting Bambang S
4 Install Cable Ladder Tow Winch Ori Electric Hazky
5 Wiring & Connection Cable Tow Winch Ori Electric Hazky
6 Install & Connection Lighting Tow Winch Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S027 HPU TOWING WINCH
1 To fabricate and install HPU Towing Winch Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install HPU Towing Winch as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Fab & Install Piping HPU Tow Winch Ori Piping Erizon
4 Test Piping HPU Tow Winch Ori Piping Erizon
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S028 ROV CONTROL ROOM
1 To fabricate and install ROV Control Room Container Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install ROV Control Room as owner/maker instruction. Material supply by Owner
Install Cable Ladder ROV Control Room Ori Electric Hazky
Wiring & Connection Cable ROV Control Room Ori Electric Hazky
Install & Connection Lighting ROV Control Room Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S029 LARS ROV
1 To fabricate and install LARS ROV Foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install LARS ROV as owner/maker instruction. Material supply by Owner Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S030 ROV
1 To fabricate and install craddle ROV as dawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install ROV as owner/maker instruction. Material supply by Owner Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S031 HPU LARS ROV
1 To fabricate and install HPU LARS ROV Foundation as dawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install HPU LARS ROV as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Install Cable Ladder HPU LARS ROV Ori Electric Hazky
4 Wiring & Connection Cable HPU LARS ROV Ori Electric Hazky
5 Install & Connection Lighting HPU LARS ROV Ori Electric Hazky
6 Fab & Install Piping HPU LARS ROV Ori Piping Erizon
7 Test Piping HPU LARS ROV Ori Piping Erizon
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S032 KIOSK ROV
1 To fabricate and install HPU LARS ROV Foundation as dawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install HPU LARS ROV as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Install Cable Ladder KIOSK ROV Ori Electric Hazky
4 Wiring & Connection Cable KIOSK ROV Ori Electric Hazky
5 Install & Connection Lighting KIOSK ROV Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S033 CONTAINER 20 Feet ROV SPARES AND WORKSHOP
1 To fabricate and install Container 20 feet Foundation as dawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install container 20 feet as owner/maker instruction. Material supply by Owner Ori Electric Hazky
3 Install electrical source for lighting and etc
Install Cable Ladder KIOSK ROV Ori Electric Hazky
Wiring & Connection Cable KIOSK ROV Ori Electric Hazky
Install & Connection Lighting KIOSK ROV Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S034 LIFEBOAT AND DAVIT
1 To fabricate and install davit foundation as drawing
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
2 Install davit and lifeboat as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Install electrical source etc
Install Cable Ladder Davit Ori Electric Hazky
Wiring & Connection Cable Davit Ori Electric Hazky
Install & Connection Lighting Davit Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S035 PROVISION CRANE
1 To install existing pedestal foundation provision crane Ori Outfitting Bambang S
2 Install provision crane as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Install electrical source etc
Install Cable Ladder Prov Crane Ori Electric Hazky
Wiring & Connection Cable Prov Crane Ori Electric Hazky
Install & Connection Lighting Prov Crane Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S036 RESCUE BOAT AND CRANE
1 To install existing foundation rescue and crane Ori Outfitting Bambang S
2 Install rescue and crane as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Install electrical source etc
Install Cable Ladder Rescue Boat Ori Electric Hazky
Wiring & Connection Cable Rescue Boat Ori Electric Hazky
Install & Connection Lighting Rescue Boat Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
S037 JOINTING ROOM
1 To install PFE Unit as owner/maker instruction. Material supply by owner Ori Electric Hazky
2 To install PGU Unit as owner/maker instruction. Material supply by owner Ori Electric Hazky
3 To install accessoris room such as ceiling, curtain, and etc
Install Linning Jointing Room Ori Carpenter Ajmain
Install Ceilling Jointing Room Ori Carpenter Ajmain
Install Deck Covering Jointing Room Ori Carpenter Ajmain
Install Furniture Jointing Room Ori Carpenter Ajmain
Install Curtain Jointing Room Ori Carpenter Ajmain
4 To install electrical source such as cooling room, lighting, and etc
Install Cable Ladder Jointing Room Ori Electric Hazky
Wiring & Connection Cable Jointing Room Ori Electric Hazky
Install & Connection Lighting Jointing Room Ori Electric Hazky
Access Work :
1 Acces crane cap. 10 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
S038 TESTING ROOM
1 To install Testing Tool unit as owner/maker instruction. Material supply by owner Ori Electric Hazky
2 To install accessoris room such as ceiling, rolling door, and etc
Install Linning Testing Room Ori Carpenter Ajmain
Install Ceilling Testing Room Ori Carpenter Ajmain
Install Rolling Door Testing Room Ori Carpenter Ajmain
Install Deck Covering Testing Room Ori Carpenter Ajmain
Install Furniture Testing Room Ori Carpenter Ajmain
Install Curtain Testing Room Ori Carpenter Ajmain
3 To install electrical source such as cooling room, lighting, and etc
Install Cable Ladder Testing Room Ori Electric Hazky
Wiring & Connection Cable Testing Room Ori Electric Hazky
Install & Connection Lighting Testing Room Ori Electric Hazky
Access Work :
1 Acces crane cap. 10 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
S039 FIX BOOM CRANE
1 To install Crane Unit unit as owner/maker instruction. Material supply by owner Ori Mechanic Dodi
2 To install electrical source Ori Electric Hazky
Access Work :
1 Acces crane cap. 30 Ton Ori General Edyansah
2 Staging as per location Ori Scaffolding Rahmadoni
MECHANICAL + ELECTRICAL
ME001 WHISKER ROLLER STRUCTURE
1 To fabricate and install 3 unit roller as drawing
Fabrikasi Ori Outfitting MKB
Install Ori Outfitting MKB
2 To fabricate and install new OB sheave for tow winch
Fabrikasi Ori Outfitting MKB
Install Ori Outfitting MKB
3 Cleaning and free gas DB Tk. 7 PS & STBD and Void Tank no.3 Ori Cleaning Saiful
ME002 PLOUGH A-FRAME
1 Re-arrange Plough A-Frame unit as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Plough A-Frame as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
3 Install Plough A-Frame HPU as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
4 Install Cable Ladder Plough A-Frame Ori Electric Hazky
5 Wiring & Connection Cable Plough A-Frame Ori Electric Hazky
6 Install & Connection Lighting Plough A-Frame Ori Electric Hazky
7 Fab & Install Piping Plough A-Frame Ori Piping Erizon
8 Test Piping Plough A-Frame Ori Piping Erizon
9 Install Cable Ladder Plough A-Frame HPU Ori Electric Hazky
10 Wiring & Connection Cable Plough A-Frame HPU Ori Electric Hazky
11 Install & Connection Lighting Plough A-Frame HPU Ori Electric Hazky
ME003 PLOUGH UNIT
1 Install Plough as owner/maker instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Plough accessoris as owner/maker instruction. Material supply by Owner
Install Cable Ladder Plough Ori Electric Hazky
Wiring & Connection Cable Plough Ori Electric Hazky
Install & Connection Lighting Plough Ori Electric Hazky
Fab & Install Piping Plough Ori Piping Erizon
Test Piping Plough Ori Piping Erizon
ME004 TUUGER WINCH
1 Install Tugger Winch as owner instruction. Material supply by Owner Ori Mechanic Dodi
2 Free gas and cleaning FO tk. No.2 PS & STBD Ori Cleaning Saiful
3 Install Cable Ladder Tugger Winch Ori Electric Hazky
4 Wiring & Connection Cable Tugger Winch Ori Electric Hazky
5 Install & Connection Lighting Tugger Winch Ori Electric Hazky
ME005 JETTING UMBILICAL WINCH
1 Install Jetting Umbilical winch as owner instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Cable Ladder Jetting Umbilical winch Material supply Ori Electric Hazky
3 Wiring & Connection Cable Jetting Umbilical winch Material supply Ori Electric Hazky
4 Install & Connection Lighting Jetting Umbilical winch Material supply Ori Electric Hazky
5 Fab & Install Piping Jetting Umbilical winch Material supply Ori Piping Erizon
6 Test Piping Jetting Umbilical winch Material supply Ori Piping Erizon
ME006 DIVERTER SHEAVE
1 To fabricate and install diverter sheave as drawing Ori Mechanic Dodi
Fabrikasi Ori Outfitting Bambang S
Install Ori Outfitting Bambang S
ME007 PLOUGH UMBILICAL WINCH
1 Install Umbilical winch as owner instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Cable Ladder Plough Umbilical winch Ori Electric Hazky
3 Wiring & Connection Cable Plough Umbilical winch Ori Electric Hazky
4 Install & Connection Lighting Plough Umbilical winch Ori Electric Hazky
5 Fab & Install Piping Plough Umbilical winch Ori Piping Erizon
6 Test Piping Plough Umbilical winch Ori Piping Erizon
ME008 CABLE STOPPER
1 Install Umbilical winch as owner instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Cable Ladder Cable Stopper Ori Electric Hazky
3 Wiring & Connection Cable Cable Stopper Ori Electric Hazky
4 Install & Connection Lighting Cable Stopper Ori Electric Hazky
ME009 LCE FOUNDATION
1 Install LCE Machine Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Cable Ladder LCE Machine Unit Ori Electric Hazky
3 Wiring & Connection Cable LCE Machine Unit Ori Electric Hazky
4 Install & Connection Lighting LCE Machine Unit Ori Electric Hazky
ME010 DIVERTER FOUNDATION
1 Install Diverter Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
ME011 CDE FOUNDATION
1 Install CDE Machine Unit as owner instruction. Material supply by Owner Ori Mechanic Dodi
2 Install Cable Ladder CDE Machine Unit Ori Electric Hazky
3 Wiring & Connection Cable CDE Machine Unit Ori Electric Hazky
4 Install & Connection Lighting CDE Machine Unit Ori Electric Hazky
5 Fab & Install Piping CDE Machine Unit Ori Piping Erizon
6 Test Piping CDE Machine Unit Ori Piping Erizon
BLASTING AND PAINTING
BP001 MAIN CABLE TANK
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP002 WHISKER AND ROLLER STRUCURE
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP003 CRANE PEDESTAL STRUCURE
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP004 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (OUTSIDE AREA) PS & STBD
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP005 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA) PS & STBD
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP006 PLATFORM 1 DECK OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA)
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP007 PLATFORM 1 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA)
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP008 PLATFORM 2 DECK OF NEW DECKHOUSE SUPERSTRUCTURE (OUTSIDE AREA)
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
BP009 PLATFORM 2 WALL OF NEW DECKHOUSE SUPERSTRUCTURE (INSIDE AREA)
1 To do full blasting S.A 2.0 for surface preaparation of sheel main cable tank as instruction Owner/Technical Paint Add Painting Azis
2 To apply coating 2 x FC Anti Corrosive as paint specification Add Painting Azis
3 To apply coating 1 x FC Finish Coat as paint specification Add Painting Azis
H-7 HULL PAINTING
1 Flat Bottom Ori Painting Azis
2 Vertical Bottom Ori Painting Azis
3 Topside Ori Painting Azis
H - 7a WASH DOWN
1 Wash down with high pressure fresh water 3000 psI Ori Painting Azis
2 Wash down with low pressure if necessary Ori Painting Azis
H - 7b HARD SCRAPE
1 Hand scrape of ships hull (Flat bottom area & Vertical bottom) Ori Painting Azis
H - 7c GRIT BLASTING
1 Flat Bottom Ori Painting Azis
2 Vertical Bottom Ori Painting Azis
3 Topside Ori Painting Azis
H - 7d HULL PAINTING
1 Touch up coat (35%) Ori Painting Azis
2 Full coat (External hull same color existing - orange color) Ori Painting Azis
3 Flat + Verical bottom Sealer (1 x coat) Ori Painting Azis
4 Flat + Verical bottom Antifoulling (1 x coat) Ori Painting Azis
5 Top side coat Ori Painting Azis
H - 7e WATER JET
1 Crash Rail / Bullwark & Deck Ori Painting Azis
2 Forecastle Deck and Accomodation Deck Ori Painting Azis
3 Accomodation Superstructure Ori Painting Azis
H - 7f X
1 Repainting ship name (3 side) Ori Painting Azis
2 Repainting of hull marks (Tank Mark, Draft Mark, Other Mark) Ori Painting Azis
H - 7g REMOVE AND CHANGE LOGO "SOECHI"
1 Remove logo existing and change to new logo "SOECHI" (2 side) Ori Painting Azis
2 Paint letters Company Logo in Funnel Ori Painting Azis
Progres
95.61%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
20%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
94.44%
100%
100%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100.00%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50.42%
100%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
50%
100%
0%
0%
0%
0%
100%
100%
100%
100%
22.22%
100%
0%
0%
0%
0%
0%
100%
100%
100%
76.00%
100%
100%
50%
30%
100%
100%
100%
33.33%
100%
0%
0%
0%
100%
28.33%
85%
0%
0%
0%
100%
57.08%
100%
100%
65%
40%
100%
65%
50%
65%
0%
0%
0%
100%
0%
100%
0.25%
50%
0%
0%
0%
0%
0.00%
0%
0%
0%
0.45%
70%
20%
0%
0%
0%
1.60%
100%
100%
100%
100%
0%
0%
1.60%
100%
100%
100%
100%
0%
0%
0.56%
100%
40%
0%
0%
0%
0%
2.00%
100%
100%
100%
100%
100%
0%
1.02%
100%
100%
100%
30%
85%
0%
0%
0%
95%
0%
0%
0.30%
100%
0%
30%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
95%
0%
0%
0.44%
0%
0%
0%
0%
0%
0%
0%
100%
100%
0%
100%
100%
0.00%
0%
0%
0%
0.00%
0%
0%
0%
0%
100%
0.00%
0%
0%
0%
0%
0%
100%
0.70%
70%
0%
0%
0.73%
100%
10%
0%
0%
0.31%
100%
55%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0.26%
80%
10%
0%
0%
0%
0%
0%
0%
0.40%
100%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0.07%
10%
0%
0%
0%
0.07%
10%
0%
0%
0%
0.03%
10%
0%
0%
0%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0.00%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0.00%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
0.00%
0%
0%
0%
100%
0.40%
0%
0%
0%
0%
100%
0.15%
0%
0%
0%
0%
0%
0%
80%
0%
0%
0%
0%
0.27%
0%
0%
0%
0%
80%
0%
0.84%
50%
100%
20%
20%
20%
0.48%
65%
0%
0%
0%
80%
0%
0.00%
85%
0%
0%
0.60%
100%
0%
0%
0%
80%
0%
0.50%
100%
0%
0%
0%
0.35%
69%
0%
0%
0%
0.00%
0%
0.60%
100%
0%
0%
0%
80%
0%
100%
30%
0%
80%
80%
0%
100%
100%
100%
100%
100%
0%
100%
100%
0%
100%
100%
0%
100%
100%
0%
100%
100%
0%
100%
100%
0%
100%
100%
100%
100%
100%
100%
100%
100%
100%
50%
100%
100%
100%
100%
0%
0%
0%
100%
100%
30%
0%