TI Commissioning Report - Rev 2.1-Recommended
TI Commissioning Report - Rev 2.1-Recommended
Site Name:
Physical Site ID:
Uniquie Site ID
Region:
Longitude:
Latitude:
Date of site commisioning &
Integration:
Submission Date:
Revision Date
CME RFI Checklist and Punchlist - GreenfieldKSGM-CME-SSD0062/1-R1Issued On: Oct 2014_x000D_ C2 General
#
Page 1 of 76
Software and Commissioning Test
Site ID:
Site Name:
Vendor:
Date of report:
Configuration
T02 Hardware
CME RFI Checklist and Punchlist - GreenfieldKSGM-CME-SSD0062/1-R1Issued On: Oct 2014_x000D_ C2 General
#
Page 2 of 76
T04-01 Sector 1 all Technoligies
T05-01 Sector 1
T05-02 Sector 2
T05-03 Sector 3
UMTS
T06 Hardware
sector 1
T08-01
sector 2
T08-02
sector 3
T08-03
T09-01 Sector 1 ok
T09-02 Sector 2 ok
T09-03 Sector 3 ok
CME RFI Checklist and Punchlist - GreenfieldKSGM-CME-SSD0062/1-R1Issued On: Oct 2014_x000D_ C2 General
#
Page 3 of 76
LTE
T10 Hardware
T12-01 Sector 1
T12-02 Sector 2
T12-03 Sector 3
T13-01 Sector 1
T13-02 Sector 2
T13-03 Sector 3
CME RFI Checklist and Punchlist - GreenfieldKSGM-CME-SSD0062/1-R1Issued On: Oct 2014_x000D_ C2 General
#
Page 4 of 76
T14-03 Customer Care
Comment:
________________________ ________________________
NAME NAME
________________________ ________________________
DATE DATE
________________________ ________________________
SIGN SIGN
CME RFI Checklist and Punchlist - GreenfieldKSGM-CME-SSD0062/1-R1Issued On: Oct 2014_x000D_ C2 General
#
Page 5 of 76
Software and Commissioning Test
Site ID:
Site Name:
Vendor:
Date of report:
General
T01 BTS Visual Power Inspection
T01-01 Check equipment earthing T01-02
# C2 General
T02 Hardware
T02-01 Status check of boards T02-02 Status check of Abis, IuB
BTS
T03 Operation and Maintenance
T03-01 Login management T03-02 Configuration privilege
# C2 General
T03-05 Cell management T03-06 Sector-1
UMTS
T07 Operation and Maintenance
T07-01 Query NodeB software version T07-02
# C2 General
T07-06 UMTS Cell Information
# C2 General
LTE
T11 Operation and Maintenance
T11-05 Cell management T11-07 Cell Inform
# C2 General
Comment:
# C2 General
ssioning Test
EST
ection
Battery installation
# C2 General
Status check of Abis, IuB & MME & OAM
ance
Configuration privilege
# C2 General
Sector-1
Sector-3
nance
Cell management
# C2 General
Cell Information 2 (1T2R Configured)
# C2 General
nance
Cell Information 1 (2T2R Configured)
# C2 General
# C2 General
Software and Commissioning Test
Site ID:
Site Name:
Vendor:
Date of report:
GSM
T43 Call test
T04-01 CELL 1 T04-02
T04-03 CELL3
# C2 General
T05-01 CELL 1 T05-02
T05-03 CELL3
UMTS
T08 Call test
T08-01 Sector 1 T87-02
# C2 General
T08-05 Sector 5 T08-06
# C2 General
T09-05 Sector 5 T09-06
LTE
T12 Call test
T12-01 Sector 1 T12-02
T12-03 Sector 3
# C2 General
T13-03 Sector 3 (LE)
Comment:
# C2 General
sioning Test
CELL 2
# C2 General
CELL 2
Sector 2
Sector 4
# C2 General
Sector 6
Sector 2
Sector 4
# C2 General
Sector 6
Sector 2
Sector 2 (LE)
# C2 General
# C2 General
Active Alarm[ GSM/UMTS/LTE ] - Site MUST be Alarm Clear
Active Alarm(MW)
Configured Alarms
# C2 General
Configured Alarms
# C2 General
Historical Alarm[ GSM/UMTS/LTE ] - Site MUST be stable for the last 72hours
# C2 General
Alarms Patching
# C2 General
LABELS
1 AC Mains fail
5 Rectifier Hi Temp
7 AC Low Voltage
9 DG Running
10 DG fails to start
11 DG fails to stop
12 DG Low Fuel
# C2 General
2G GSM Cell Availability - 72 hours Stats (Site MUST be stable) UMTS Cell Availability - 72 hours St
# C2 General
MTS Cell Availability - 72 hours Stats (Site MUST be stable)
# C2 General
TI Commissioning Report - P
BSC/RNC/BTS:
C01 - 01
Picture of all Cabinets - Closed (One Picture)
C01 - 03
FCOB Cabinet for Nokia Fully Open Cabinet Transmission Cabinet for Huawei
# C2 General
PIC 2 Circuit Breakers of the Equipment with Labels
-DCDB
C02 - 01
DC Circuit Breakers With Labels -1 Clearly Label the Essesntial & Non- Essesntial Load Panel
# C2 General
Photo 15
Antennas Azimuth Photos
C04 - 01
Sector-1 With the Compass showing visible degrees of angle
C04 - 03
Sector-3 With the Compass showing visible degrees angles
# C2 General
Photo 16
Antennas Mechanical Tilt (Inclinometer)
C05 - 01
Sector-1 With the Inclinometer with Zero Degrees
C05 - 03
Sector-3 With the Compass showing visible degrees angles
# C2 General
-Cover all the RRU and MW Grounding
C06 - 01
MW Equipment Grounding (ODU)
C06 - 03
RRU Sec 2 - Grounding
C06 - 05
Common Grounding bar for Tower Equipment
# C2 General
Photo 7
Measure and Record VSWR Value on RF System
-OEM Gui Testing Snapshot
C07 - 01
VSWR Screenshot - 1 (GUI)
C07 - 03
VSWR Screenshot - 1 (GUI)
# C2 General
C: TRANSMISSION
C08 - 01
MW ODU - Site A
C08 - 03
MW IDU (RTN) - Site A (With Clear Visible Labels) For Huawei
# C2 General
For Huawei only
D: BTS FUNCTIONALITY C
# C2 General
C09 - 03
Record Site Performance for 4 days (CSSR,DCR) -Screenshot
# C2 General
ning Report - Photos
TS INSPECTION CHECKLIST
C01 - 02
Rectifer Cabinet Full Picture - Open
C01 - 04
Use this space if needed for additional photo
# C2 General
C02 - 02
DC Circuit Breakers With Labels -2 Clearly Label the Essesntial & Non- Essesntial Panel
C03 - 02
Use this space if needed for additional photo
# C2 General
C04 - 02
Sector-2 With the Compass showing visible degrees of angle
C04 - 04
Use this space if needed for additional photo
# C2 General
C05 - 02
Sector-2 With the With the Inclinometer with Zero Degrees
C05 - 04
Use this space if needed for additional photo
# C2 General
C06 - 02
RRU Sec 1 - Grounding
C06 - 04
RRU Sec 3 - Grounding
C06 - 06
Common Grouding point for Equipment in the Cabinet
# C2 General
C07 - 02
VSWR Screenshot - 2 (GUI)
C07 - 04
Use this space if needed for additional photo
# C2 General
RANSMISSION
C08 - 02
MW ODU Site B
C08 - 04
MW IDU (RTN) - Site B (With Clear Visible Labels) For Huawei
# C2 General
For Huawei only
TS FUNCTIONALITY CHECKLIST
# C2 General
C09 - 04
Use this space if needed for additional photo
# C2 General
# C2 General
# C2 General
# C2 General
a Mech Tilt Photos
# C2 General
Antenna E. Tilt Photos
Pls. refer to below RET Configuration photo Pls. refer to below RET Configuration photo
# C2 General
Antenna Azimuth Photos
# C2 General
# C2 General
Link ID:
Link Name
Capacity (Mb/s)/(Gb/s):
Link Configuration
NE IP Address
D01 - 01
Monitor link performance for 72 Hours
D01 - 03
RSL Test per link (Side A & Side B)
# C2 General
D01 - 05
Link Frequencies (Channel A) - Side A
D01 - 07
Modulation Side A (Only Channel A)
# C2 General
D01 - 09
Power Setting also showing ATPC active - Side A (Channel A)
D01 - 11
Power Setting also showing ATPC active - Side B (Channel A)
D01 - 13
Network Settings Side-A
# C2 General
D01 - 13
Link Capacity (Side A)
D01 - 15
MW Link Created on NSP
# C2 General
# C2 General
D01 - 02
Side A only Perform XPD interference test per link
D01 - 04
Side A & B
# C2 General
D01 - 06
NB: Side A only Link Frequencies (Channel B) - Side A
D01 - 08
Side A & B Modulation Side B (Only Channel B)
# C2 General
D01 - 10
Side A Power Setting also showing ATPC active - Side A (Channel B)
D01 - 12
Side B Power Setting also showing ATPC active - Side B (Channel B)
D01 - 14
Side A & B Network Settings Side-B
# C2 General
D01 - 14
Side A MW Link Properties as created on MW EMS
D01 - 16
# C2 General
# C2 General
TX Router Type Router Type??
E01 - 01
Router Current Alarms Screenshot - MUST be Clear
E01 - 03
Service Interface Description
E01 - 05
Optical Levels for Network Interface - Side A (For Fibre Sites)
# C2 General
E01 - 07
Link Screenshot - Link Properties
# C2 General
E01 - 02
Router History Alarms - MUST be stable
E01 - 04
Network Interface Description
E01 - 06
Optical Levels Network Interface - Side B (For Fibre Sites)
# C2 General
E01 - 09
Snapshop showing that the node is integrated on NCE
# C2 General
Customer
Project Name
Site ID
Date
No. Description
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
16
16
# C2 General
Safaricom Telecommunications
Safaricom
20-May-22
# C2 General
Picture S/N
# C2 General