HSE-RA-055 Chiller Pipe Installation - Rev 0
HSE-RA-055 Chiller Pipe Installation - Rev 0
PAGE No 1 of 16
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 055
Job Description: Installation of chilled water pipe lines
Index:
Form 1 Task Analysis Initiation
Form 2 Risk Assessment Process As per Risk Assessment Procedure.
Form 3 Written Safe Work Procedure Result
AUTHORISATION
Prepared by: Approved by
Signature Date Signature Date
HSE Manager Project Manager
Impact
SEQUENCE OF TASK STEPS POTENTIAL INJURIES OR HAZARDS RECOMMENDED CONTROLS
H, S, E
1. Pre-use inspection and use of all equipment. Failure of equipment will cause injuries to Faulty equipment to be repaired/maintained or replaced.
persons and / or property damage. Guards to be on all Machinery and appropriate PPE to
be worn.
Engine ran machinery to have fire extinguishers
Fuel/oil leaks could cause environmental H, S, E
available locally.
concerns. Drip trays/heavy gauge plastic to be used in case of
leaks and spill kit to be within the project for accidental
spills.
2. Wear appropriate Personal Protective Failure to use Personal Protective
Equipment. Equipment will cause injuries to employees.
Gloves.
Safety boots.
Enforce the use of Personal Protective Equipment AT
Overalls. H,S
ALL times
Hard hat.
Hearing protection.
Eye protection
Fall Protection
3. Use competent employees only Failure will result in injuries to persons and / Enforce the use of competent persons only
H, S
or property damage
4. Competent supervisor should be appointed for every
activity to monitor the workers.
Work task instruction should be provided for every
H, S activity.
13. Hydro testing Sudden pressure release from joints Ensure that all the component parts are capable of
Pipe rupture withstanding the test pressure and the manufacturer’s
Serious body injuries to the person and information is checked.
property damage Ensure that all anchorage (thrust blocks, cradles, straps etc)
are capable of withstanding the test pressure before any
filling or testing.
Ensure competent operatives are being engaged and
constant supervision is in place.
Ensure a pressure relief valve incorporated at the delivery
side of the test pump.
H,S
Ensure that during the testing time access should be
forbidden to all persons not directly involved with the test and
appropriate warning notices are in place
Ensure that all test ends are suitably protected and the area
been cordoned off from unauthorized entry
If any investigation or tightening of joints need to take place,
ensure that no one enters the confined space without
releasing the line pressure.
Appropriate PPE must be provided / used all time.
Relevant tool box talks prior to commencement of job
Result Classification:
Risk Rating
Critical = 17►15 High = 14►11 Medium = 10►7 Low = 6►0 16
Poor Supervision Poor quality of work, chance for Ensure the availability of PE/FM Always
accident /incident or property lost/damage competent supervisor at work
place.
4 H,S 10
Work task instruction should be
3
provided to the workers prior to
the commencement of activity
5 Manual Handling Muscular strains, Bruises and cuts H,S 7 Manual lifting procedure must be Supervisor Always 2
applied.
2. PROCEDURE
1. Do pre-use inspection of all equipment to be used and replace or repair faulty items.
2. Use trained competent employees only.
3. Use appropriate Personal Protective Equipment i.e.:
3.1. Hardhat.
3.2. Safety boots.
3.3. Hand gloves
3.4. Overalls.
3.5. Eye protection.
1. Must have PPE – safety footwear, gloves, hardhat, goggles, foul weather clothing etc.
2. Must have appropriate tools and equipment in good condition.
3. Must have weatherproof covers for materials and equipment, waste containers, warning tape.
4. Consider risks and hazards in work area. Refer any concerns to supervisor. Are relevant permits in place?
5. Check if it is necessary to secure area adjacent to work. Refer to supervisor if appropriate.
6. Arrange for transport of materials and equipment to site via supervisor.
7. Ensure materials and equipment are secure or removed when site unattended, eg overnight or during breaks.
Hazards
HSE QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 15 of 16
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 055
Job Description: Installation of chilled water pipe lines
Persons in danger
1. Operator, Tecnician
2. Other workers/visitors in vicinity, eg. Passers-by in working area etc.
Control measures
No lone working
HSE QUALITY SYSTEM DOCUMENTATION
DOC No DS/CA006P02/00022
PAGE No 16 of 16
AL SHAFAR GENERAL CONTRACTING LLC. REV 0
DATE 05/01/2017
SAFETY, HEALTH AND ENVIRONMENTAL PROCEDURE
Project Name: Festival Living Stream-02 HSE-RA 055
Job Description: Installation of chilled water pipe lines