SANTANDER
SANTANDER
WORK DESCRIPTION
Volts Amps
e0 Battery Load Test - measure voltage at start w/ AC Test for 120mins
No AC
after 10 min
after 20 min
after 30 min
after 40 min
after 50 min
after 60 min
after 70 min
after 80 min
after 90 min
after 100 min
after 110 min
after 120min
5 POWER DISTRIBUTION
Port Breaker Size Cable Size Description Commnets
a. Port 0 20 10 CMUA:
b. Port 1 20 10 PWR BETA
c. Port 2 20 10 PWR GAMA
d. LOAD 3 12 fuse MAIN BAR FAN PWR
e. LOAD 4 20 fuse EXIT BAR FAN PWR
f. LOAD 5 20 fuse RRU 0
g. LOAD 6 20 fuse RRU 1
h. LOAD 7 20 fuse RRU 2
i. LOAD 8 20 fuse RRU 3
j. LOAD 9 20 fuse RRU 4
h. LOAD 10 20 fuse RRU 5
7 INSPECTION OF CABINET
OK Fault COMMENTS
a. Doors, locks and hinges √
b. Interior dust free √
c. Rectifiers √
d. Cables √
e. Cooling Unit √
f. Filters √
g. Grounding √
e. Access holes √
COMMENTS
Power Plant
SANTANDER SITE
WORK DESCRIPTION
AMP-HOUR MANUFACTURAR
BATTERY 1 NA NA
BATTERY 2 NA NA
BATTERY 3 NA NA
BATTERY 4 NA NA
BATTERY 5 135Ah SHOTO
BATTERY 6 135Ah SHOTO
BATTERY 7 135Ah SHOTO
BATTERY 8 135Ah SHOTO
POWER PLANT
General
Ensure that equipment racks are level and properly bolted down
Ensure that equipment racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured
Power Modules
Visual inspection of installed power modules for alarms. Record if found
Reset any modules with alarms as specified by manufacturer. Replace if necessary
Record number of power slots available, number in use and spare positions
Load Audit
Open Load Distribution Center
Record available number of distribution positions, in use and spare
Record breaker size, cable size and breaker position of positions in use
Ensure proper lug is used ( single, double ) and bolts are properly tightened
BATTERIES
General
Ensure that battery racks are level and properly bolted down
Ensure that battery racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured
Cells
Individually inspect each battery for heat buildup, swelling, leakeage, venting
Individually inspect each battery post for intergrity
Individually inspect each battery post for proper torqueing. Retorque if necessary
Manually inspect battery interconnects for heat buildup
Record voltage, temperature and internal resistance / conductance for each battery
Load test
Record battery voltage across each battery string
Fail AC supply
Record battery voltage across each battery string
With AC supply off repeat voltage readings across each string every 10 mins for 1 hour
Restore AC supply
Record load current and system voltage upon AC supply return
Wait until load current drops back to pre load test value. Record time
Ensure that all loads are on line and back to normal
Ensure there aren't any alarms present. Address if found
Pictures
Batteries
Load Center
Controller Readings
Alarms
er Plant
1051
RK DESCRIPTION
OK NK Comments
ü
ü
ü
ü
ü
ü
ü
ü
ü
___1__ Available __3____ In use ____0___ Spare
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
___49.92____ Amps __9.51___ Volts
___1___ Min
ü
ü
Load ( A )
ZTE Equipment (LTE & UMTS)
SANTANDER SITE
WORK DESCRIPTION
5 DCPD6
Port Breaker Size Cable Size
Port 1 20A 10
Port 2 20A 10
Port 3 20A 10
Port 4 20A 10
Port 5 20A 10
Port 6 20A NA
Port 7 20A NA
Port 8 20A NA
Port 9 20A NA
uipment (LTE & UMTS)
1051
WORK DESCRIPTION
FORMATION COMMENTS
ELEC. TILT [UMTS_LTE] MEC. TILT
0 1
3 1
0 1
[LTE] COMMENTS
Optical Power (dBm)
RX
UMTS] COMMENTS
Optical Power (dBm)
RX
-4.27
-4.19
-4.13
DCPD6
Description Commnets
DCPD6 OFF
ALPHA ON
BETA ON
GAMA ON
INVERTER ON
NA OFF
NA OFF
NA OFF
NA OFF
Tower
SANTANDER SITE
WORK DESCRIPTION
Tower Type: SELF SUPPORT
Height: 100FT
1 TOWER INSPECTION
2 TOWER INVENTORY
Height Alpha Beta
100
90 Huawei link from Teakettle
80 UMTS & CDMA RRU (Amphenol) UMTS & CDMA RRU (Amphenol)
70
60 PTP FROM TEA KETTLE
50
40
30
20
10
Tower
1051
WORK DESCRIPTION
TOWER INSPECTION
OK FAULT COMMENTS
√
√
√
√ NEEDS TO BE CHECK
√
√
√
√
N/A
COMMENTS
Beta Gamma
WORK DESCRIPTION
PTION
DESCRIPTION
DI
DI
BBU FE1
CMUA
PWR BETA
PWR GAMA
MAIN BAR FAN PWR
EXIT BAR FAN PWR
RRU 0
RRU 1
RRU 2
RRU 3
RRU 4
RRU 5
DCPD6
ALPHA
BETTA
GAMA
INVERTER
FIBER DE
SANTANDER SITE
WORK DE
SOURCE ODF
No. Tube
MEDIA CONVERTER 1
MEDIA CONVERTER 2
3
4
5
6
7
8
9
10
11
12
FIBER DESCRIPTION
E 1051
WORK DESCRIPTION
DF Spliced Fiber
Strand Strand Tube No.
↔ 1
↔ 2
↔ 3
↔ 4
↔ 5
↔ 6
↔ 7
↔ 8
↔ 9
↔ 10
↔ 11
↔ 12
Destination
SANTANDER FACTORY
SANTANDER FACTORY
Main Ground Grid
Open Handhole
Inspect handhole, metal brackets, insulators, bus bar(s), ground cables, nuts & bolts
Replace, repair or maintain damaged/ faulty material as necessary
Disconnect cables from bus bar, polish bus bar, and apply No-Oxide grease. Reinstall bus bars
Check cables for proper crimping and reconnect to ground bar. Ensure adequate torque
Ensure cables are properly labelled. Relabel as necessary
Tower Ground
Inspect tower leg grounds to ensure cable integrity and proper installation
Inspect grounding plates and nuts & bolts. Service, repair or replace as necessary
Inspect equipment ground cable running up the tower for cable integrity and proper installation
Inspect lightning arrestor ground cable for cable cable integrity and proper installation
Megger grounding cable on each tower leg
i
OK NK Comments
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
ü
Leg 1 __0.6___ Leg 2 ___0.5____ Leg 3 ____1.0______
Material Qty
Photocell NA
Light NA
Inventory ü
HW Cabinet ü
ZTE Cabinet
Focus Power Plan ü
wifi NA
transmision ü
A/Cs NA
tower light ü
Inverter ü
panel box ü
Test
Hw Battery ü
ZTE BatteryGenset ATS ü
Focus Battery ü
Tower light ü
Yard Light ü
Misc Tasks
Clean Cabinet ü
Inspect / clean genset ü
Clean Building ü
Inspect Antennas ü
check Azimuth ü
Check Tilt ü
Check EMS LTE Alarms ü
Check EMS UMTS Alarms ü
Check EMS Radio Link Alarms ü
Check BSC CDMA Alarms ü
Check CN Maestro ü
IP: 172.20.19.6 ü
IP: 172.20.19.21 ü
Tower
lightning Arrester ü
Equipment Grounding ü
Tower general structure ü
Pictures ü
general view ü
compound ü