The document provides inspection details for Huawei equipment at the Santander site. It describes antenna information including height, azimuth, and tilt for three sectors. It also details fiber optic power levels, inspection of antenna cables and grounding, power supply inspection including voltage and battery testing, power distribution including breaker sizes and cable sizes, battery information including manufacturer and voltage, cabinet inspection, and an inspection of the power plant including batteries, cells, and load testing.

Uploaded by

kenric Simpson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views

SANTANDER

The document provides inspection details for Huawei equipment at the Santander site. It describes antenna information including height, azimuth, and tilt for three sectors. It also details fiber optic power levels, inspection of antenna cables and grounding, power supply inspection including voltage and battery testing, power distribution including breaker sizes and cable sizes, battery information including manufacturer and voltage, cabinet inspection, and an inspection of the power plant including batteries, cells, and load testing.

Uploaded by

kenric Simpson
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 23

Hauwei Equipment (CDMA)

SANTANDER SITE 1051

WORK DESCRIPTION

1 ANTENNA INFORMATION COMMENTS


HEIGHT -METERS/FEET AZIMUTH TILT(Mec) TILT(Elec)
a. Sector Alpha 80ft 65 1 0
b. Sector Beta 80ft 155 1 0
c. Sector Gamma 80ft 300 1 0

2 FIBER FOR RRU'S COMMENTS


Optical Power (dBm)
RX TX
a Sector Alpha -4.80 -5.00
b Sector Beta -5.90 -5.20
c Sector Gamma -4.80 -5.00

3 INSPECTION OF ANTENNA CABLES,CONNECTORS AND GROUNDING


OK FAULT COMMENTS
a. Sector Alpha √
b. Sector Beta √
c. Sector Gamma √

4 INSPECTION OF POWER SUPPLY


COMMENTS
a. BTS Input power Volts 229.3
L1N 116.2
L2N 113.5
b. Power supply outlets Volts
OK FAULT
c. Surge suppressor √
d Battery connections √

Volts Amps
e0 Battery Load Test - measure voltage at start w/ AC Test for 120mins
No AC
after 10 min
after 20 min
after 30 min
after 40 min
after 50 min
after 60 min
after 70 min
after 80 min
after 90 min
after 100 min
after 110 min
after 120min
5 POWER DISTRIBUTION
Port Breaker Size Cable Size Description Commnets
a. Port 0 20 10 CMUA:
b. Port 1 20 10 PWR BETA
c. Port 2 20 10 PWR GAMA
d. LOAD 3 12 fuse MAIN BAR FAN PWR
e. LOAD 4 20 fuse EXIT BAR FAN PWR
f. LOAD 5 20 fuse RRU 0
g. LOAD 6 20 fuse RRU 1
h. LOAD 7 20 fuse RRU 2
i. LOAD 8 20 fuse RRU 3
j. LOAD 9 20 fuse RRU 4
h. LOAD 10 20 fuse RRU 5

6 AMP-HOUR MANUFACTURAR VOLTAGE COMMENTS


a. BATTERY 1 100Ah Northstar Red Battery 9 Bank 1
b. BATTERY 2 100Ah Northstar Red Battery 9.2
c. BATTERY 3 100Ah Northstar Red Battery 9.7
d. BATTERY 4 100Ah Northstar Red Battery 9.6
e. BATTERY 5 90Ah Bank 2
f BATTERY 6 90Ah
g BATTERY 7 90Ah
h. BATTERY 8 90Ah

7 INSPECTION OF CABINET
OK Fault COMMENTS
a. Doors, locks and hinges √
b. Interior dust free √
c. Rectifiers √
d. Cables √
e. Cooling Unit √
f. Filters √
g. Grounding √
e. Access holes √

COMMENTS
Power Plant
SANTANDER SITE
WORK DESCRIPTION

AMP-HOUR MANUFACTURAR
BATTERY 1 NA NA
BATTERY 2 NA NA
BATTERY 3 NA NA
BATTERY 4 NA NA
BATTERY 5 135Ah SHOTO
BATTERY 6 135Ah SHOTO
BATTERY 7 135Ah SHOTO
BATTERY 8 135Ah SHOTO

POWER PLANT
General
Ensure that equipment racks are level and properly bolted down
Ensure that equipment racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured

Power Frame & Controller


Visual inspection of power frame(s) and controller unit(s)
Check controller visual alarm indicators for any current alarms
Review alarm log. Record and reset alarms found. Clear alarm log
Record voltage and current readings

Power Modules
Visual inspection of installed power modules for alarms. Record if found
Reset any modules with alarms as specified by manufacturer. Replace if necessary
Record number of power slots available, number in use and spare positions

Load Audit
Open Load Distribution Center
Record available number of distribution positions, in use and spare
Record breaker size, cable size and breaker position of positions in use
Ensure proper lug is used ( single, double ) and bolts are properly tightened

BATTERIES
General
Ensure that battery racks are level and properly bolted down
Ensure that battery racks are clean and dust free. Clean as necessary
Ensure that all covers are in place and properly secured
Cells
Individually inspect each battery for heat buildup, swelling, leakeage, venting
Individually inspect each battery post for intergrity
Individually inspect each battery post for proper torqueing. Retorque if necessary
Manually inspect battery interconnects for heat buildup
Record voltage, temperature and internal resistance / conductance for each battery

Load test
Record battery voltage across each battery string
Fail AC supply
Record battery voltage across each battery string
With AC supply off repeat voltage readings across each string every 10 mins for 1 hour
Restore AC supply
Record load current and system voltage upon AC supply return
Wait until load current drops back to pre load test value. Record time
Ensure that all loads are on line and back to normal
Ensure there aren't any alarms present. Address if found

DC Distribution Audit Form


Date:
Site: 0

Position In Use Breaker Size Cable Size Eqpt


Y N V
1 ü 20A #10 DCPD6
2 ü 20A #10 ALPHA
3 ü 20A #10 BETA
4 ü 20A #10 GAMA
5 ü 20A #10 INVERTER
6 ü 20A #10 NA
7 ü 20A #10 NA
8 ü 20A #10 NA
9 ü 20A #10 NA

Battery Discharge Record Shee


Date:
Site:
Bank #
Time (min) Voltage Load
53.14 12.44
0 51.87 13.09
10 50.31 13.16 2:00
20 50.29 13.12 2:10
30 50.32 12.72 2:20
40 50.26 13.58 2:30
50 50.24 13.45 2:40
60 50.15 13.47 2:50
70 50.09 13.84 3:00
80 49.98 13.16 3:10
90 49.91 13.39 3:20
100 49.71 12.71 3:30
110 49.63 13.86 3:40
120 49.55 13.03 3:50

Pictures
Batteries
Load Center
Controller Readings
Alarms
er Plant
1051
RK DESCRIPTION

ANUFACTURAR VOLTAGE COMMENTS


NA NA
NA NA
DISCONNECTED
NA NA
NA NA
SHOTO 11.9V
SHOTO 11.8V
BANK #2
SHOTO 11.8V
SHOTO 11.8V

OK NK Comments

ü
ü
ü

ü
ü
ü
ü

ü
ü
___1__ Available __3____ In use ____0___ Spare

Use table provided


Use table provided
Address as needed

ü
ü
ü
ü
ü
ü
ü
ü

ü
ü
ü
ü
ü
___49.92____ Amps __9.51___ Volts
___1___ Min
ü
ü

Load ( A )
ZTE Equipment (LTE & UMTS)
SANTANDER SITE

WORK DESCRIPTION

1 LTE & UMTS ANTENNA INFORMATION


HEIGHT -METERS/FEET AZIMUTH
a. Sector Alpha 80ft 65
b. Sector Beta 80ft 155
c. Sector Gamma 80ft 300

2 FIBER FOR RRU'S [LTE]


Optical Power (dBm)
TX
a Sector Alpha
b Sector Beta
c Sector Gamma

3 FIBER FOR RRU'S [UMTS]


Optical Power (dBm)
TX
a Sector Alpha -3.82
b Sector Beta -5.59
c Sector Gamma -3.21

4 INSPECTION OF ANTENNA CABLES,CONNECTORS AND GROUN


OK FAULT
a. Sector Alpha √
b. Sector Beta √
c. Sector Gamma √

5 DCPD6
Port Breaker Size Cable Size
Port 1 20A 10
Port 2 20A 10
Port 3 20A 10
Port 4 20A 10
Port 5 20A 10
Port 6 20A NA
Port 7 20A NA
Port 8 20A NA
Port 9 20A NA
uipment (LTE & UMTS)
1051

WORK DESCRIPTION

FORMATION COMMENTS
ELEC. TILT [UMTS_LTE] MEC. TILT
0 1
3 1
0 1

[LTE] COMMENTS
Optical Power (dBm)
RX

UMTS] COMMENTS
Optical Power (dBm)
RX
-4.27
-4.19
-4.13

NTENNA CABLES,CONNECTORS AND GROUNDING


COMMENTS

DCPD6
Description Commnets
DCPD6 OFF
ALPHA ON
BETA ON
GAMA ON
INVERTER ON
NA OFF
NA OFF
NA OFF
NA OFF
Tower
SANTANDER SITE

WORK DESCRIPTION
Tower Type: SELF SUPPORT
Height: 100FT

1 TOWER INSPECTION

a. Lighting Rod and connections


b. Tower lights
c. Cable trays
d Ground Resistance
e. Climbing ladder
f. Base
g. Paint
h. Busbar
i. Anchor's (If Applicable)

2 TOWER INVENTORY
Height Alpha Beta

100
90 Huawei link from Teakettle
80 UMTS & CDMA RRU (Amphenol) UMTS & CDMA RRU (Amphenol)
70
60 PTP FROM TEA KETTLE
50
40
30
20
10
Tower
1051

WORK DESCRIPTION

TOWER INSPECTION
OK FAULT COMMENTS



√ NEEDS TO BE CHECK




N/A

COMMENTS
Beta Gamma

awei link from Teakettle


& CDMA RRU (Amphenol) UMTS & CDMA RRU (Amphenol)

PTP FROM TEA KETTLE


Port Allocation
SANTANDER SITE 1

WORK DESCRIPTION

NO. Rack/Cabinet Location DEVICE PORT

1 Huawei Cabinet CISCO SYSTEMS 1


2 Huawei Cabinet CISCO SYSTEMS 2
3 Huawei Cabinet CISCO SYSTEMS 3
4 Huawei Cabinet CISCO SYSTEMS
5 Huawei Cabinet CISCO SYSTEMS
6 Huawei Cabinet CISCO SYSTEMS 6
7 Huawei Cabinet CISCO SYSTEMS
8 Huawei Cabinet CISCO SYSTEMS 8

9 Huawei Cabinet HUAWEI EPS 01D Port 0


10 Huawei Cabinet HUAWEI EPS 01D Port 1
11 Huawei Cabinet HUAWEI EPS 01D Port 2
12 Huawei Cabinet HUAWEI EPS 01D LOAD 3
13 Huawei Cabinet HUAWEI EPS 01D LOAD 4
14 Huawei Cabinet HUAWEI EPS 01D LOAD 5
15 Huawei Cabinet HUAWEI EPS 01D LOAD 6
16 Huawei Cabinet HUAWEI EPS 01D LOAD 7
17 Huawei Cabinet HUAWEI EPS 01D LOAD 8
18 Huawei Cabinet HUAWEI EPS 01D LOAD 9
19 Huawei Cabinet HUAWEI EPS 01D LOAD 10

ZTE Cabinet DCPD6 1


ZTE Cabinet DCPD6 2
ZTE Cabinet DCPD6 3
ZTE Cabinet DCPD6 4
ZTE Cabinet DCPD6 5
on
1051

PTION

DESCRIPTION

DI

DI

BBU FE1

CMUA
PWR BETA
PWR GAMA
MAIN BAR FAN PWR
EXIT BAR FAN PWR
RRU 0
RRU 1
RRU 2
RRU 3
RRU 4
RRU 5

DCPD6
ALPHA
BETTA
GAMA
INVERTER
FIBER DE
SANTANDER SITE

WORK DE

SOURCE ODF
No. Tube
MEDIA CONVERTER 1
MEDIA CONVERTER 2
3
4
5
6
7
8
9
10
11
12
FIBER DESCRIPTION
E 1051

WORK DESCRIPTION

DF Spliced Fiber
Strand Strand Tube No.
↔ 1
↔ 2
↔ 3
↔ 4
↔ 5
↔ 6
↔ 7
↔ 8
↔ 9
↔ 10
↔ 11
↔ 12
Destination
SANTANDER FACTORY
SANTANDER FACTORY
Main Ground Grid
Open Handhole
Inspect handhole, metal brackets, insulators, bus bar(s), ground cables, nuts & bolts
Replace, repair or maintain damaged/ faulty material as necessary
Disconnect cables from bus bar, polish bus bar, and apply No-Oxide grease. Reinstall bus bars
Check cables for proper crimping and reconnect to ground bar. Ensure adequate torque
Ensure cables are properly labelled. Relabel as necessary

Equipment Ground Bar ( EGB )


Inspect metal brackets, insulators, bus bar(s), ground cables, nuts & bolts
Replace, repair or maintain damaged/ faulty material as necessary
Disconnect cables from bus bar, polish bus bar, and apply No-Oxide grease. Reinstall bus bars
Check cables for proper crimping and reconnect to ground bar. Ensure adequate torque
Ensure cables are properly labelled on both ends i.e. bus bar and eqpt. Relabel as necessary

Equipment Frame Grounds


Inspect all equipment frames and cabinets to ensure they are grounded
Inspect all frame grounds to ensure cable integrity and proper installation
Install frame ground for any equipment not grounded. Record any new grounds installed
Remove any frame grounds found for equipment removed. Record grounds removed
Ensure that where installed, DC power plant positive bus is grounded to MGB with 2/0 cable
Ensure that all frame grounds are properly labelled on both ends. Relabel as necessary
Inspect all internal cable trays to ensure that they are daisy chained and referenced to the EGB
Inspect grounding halo inside equipment room for cable integrity and proper installation

Tower Ground
Inspect tower leg grounds to ensure cable integrity and proper installation
Inspect grounding plates and nuts & bolts. Service, repair or replace as necessary
Inspect equipment ground cable running up the tower for cable integrity and proper installation
Inspect lightning arrestor ground cable for cable cable integrity and proper installation
Megger grounding cable on each tower leg
i
OK NK Comments

ü
ü
ü
ü
ü

ü
ü
ü
ü
ü

ü
ü
ü
ü
ü
ü
ü
ü

ü
ü
ü
ü
Leg 1 __0.6___ Leg 2 ___0.5____ Leg 3 ____1.0______
Material Qty
Photocell NA
Light NA
Inventory ü
HW Cabinet ü
ZTE Cabinet
Focus Power Plan ü
wifi NA
transmision ü
A/Cs NA
tower light ü
Inverter ü
panel box ü

Test
Hw Battery ü
ZTE BatteryGenset ATS ü
Focus Battery ü
Tower light ü
Yard Light ü

Misc Tasks
Clean Cabinet ü
Inspect / clean genset ü
Clean Building ü
Inspect Antennas ü
check Azimuth ü
Check Tilt ü
Check EMS LTE Alarms ü
Check EMS UMTS Alarms ü
Check EMS Radio Link Alarms ü
Check BSC CDMA Alarms ü
Check CN Maestro ü
IP: 172.20.19.6 ü
IP: 172.20.19.21 ü

Tower
lightning Arrester ü
Equipment Grounding ü
Tower general structure ü
Pictures ü
general view ü
compound ü